RE: RE: RE: More drilling
RE: RE: RE: More drillingLooks good, but I have a couple questions:
.
- I was told a meter cubed is approx 2 to 3 tonnes, I usually use 2.5 tonnes / m3, so I would go: 1,000 x 1,000 x 75 x 2.5 = 188 million tonnes of material
.
- There is 31.5 g / troy oz, so 188 tonnes x .3 g /t = 56,000,000 grams / 31.5 = 1.8 million oz's gold
.
- Good conservative assumption of $700 margin, however since we have to move this rock anyway, the margin would probably be far lower
.
Either way we can agree that this oxide cap will greatly improve the project.