RE: RE: Encouraged discouraged.
RE: RE: Encouraged discouraged. I would be more in favour of bringing in more drills to speed up the defination drilling and establishing a pit.
A few hundred thousand dollars or even half a million from a bulk sample would not be that helpful financially and could possibly interfere with a pit design and reduce the value.
The work being done at PKL is no doubt contracted out as would the shaft work and dewatering.
Has the company gone out for proposals from contractors to do the work and possibly supply equipment and materials? I doubt it, even though it's free except for putting together a scope of work. Surely there is someone there that can do that.
Drilling long holes from surface to 2900 feet is rediculus. Do it after the shaft is refurbished at a much lower cost per meter.