RE:RE:RE:RE:RE:MD&AThanks brandonn. You are correct and that makes sence as we have the 4 permits and are contracting a colied tube rig to knock the 4 out quickly asa they are shallow holes. Looks like we have plenty of time in Illinois and Racoon Creek should seal our requirements. I dont think we will need over $10 million to meet those requirements, hope not anyway. As noted in prior post, we may be able to get funds via production loan if we get some flow in Illinois soon.
GLTA