RE:RE:Help please.golden/panda, thanks and if you are correct about that then perhaps hole #160 is being drilled on the same structure as holes 135 and 158.
Which might mean you original post is correct where you state batching does not necessarily mean resutls were not good.
If they had intended to drill in the location of hole 160 why would they have moved the drill to South Romero location 159? The answer is they would not have. It is possible they decided to drill at location or hole 160 because they wanted to follow up on something interesting they found in the results of hole 158, and further made a decision to batch results.
All speculation on my part. I do not know where 160 is located , east or west. I do not know why GQC is using batch releases. I am probably wrong about this issue being only accademic and the outcome being uniportant to the share price.
Things do not happen without a reason. Presentation was updated. Updates do not take place because they are fun to do.There is possibly a legal reason why management discloses certain things. Golden/Panda's post makes me think he is on to something I totally overlooked. In no way saying he agress with anything I have posted.