RE:Updated Drilling ResultsMy recollection was that the re-testing was supposed to occur after spring breakup. The timeline bantered around was sometime in May or early June at the latest.
Here is from the March newsletter:
"Further Testing of the 6-26 and 5-26 Wells
The wells have now been shut-in to allow the load fluids to both soak and disperse into the formation, and we plan to re-open and flow the wells in late spring / summer to further assess productivity. "