Initial flowing/testingI would assume they would do some initial flowing from the well prior to tying it into the facility as the initial flowing brings up frac sand with it. This causes quite a bit of erosion on the piping systems, so I would expect them to flow enough to get rid of the bulk of the frac sand and I'm sure they will be noting flow rates as they do that. Anybody dissagree?