Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Plateau Energy Metals Inc. PLUUF

Plateau Energy Metals Inc is an exploration stage company. The company is in the process of acquisition, and exploration, and evaluation of mineral properties in Peru. It is principally engaged in the exploration for uranium on its properties located in the Macusani plateau region of southeastern Peru and the Falchani lithium project.


GREY:PLUUF - Post by User

Post by MrBiggeron Jul 03, 2018 10:28am
87 Views
Post# 28261842

News this AM

News this AM

TORONTO, July 03, 2018 (GLOBE NEWSWIRE) -- Plateau Energy Metals Inc. (“Plateau” “PLU” or the "Company") (TSX VENTURE:PLU) (FRANKFURT:QG1) (OTCQB:PLUUF), a lithium and uranium exploration and development company, is pleased to announce continued strong results from four recently completed vertical and one inclined diamond drill holes from Platform 10, Platform 25 and Platform 6, located up to 1 km north of previously announced drilling and Platform 19A located towards the southeastern edge of current drilling at the Falchani project, on the Company’s Macusani Plateau Project in southeastern Peru.

Highlights

  • Current drill results establish an extension to the north and south of previous drilling in the centre of the interpreted eastern side of Falchani lithium deposit. This represents ~1,250 m (NE-SW) drilled of the mapped 1,500-1,700 m long section across Falchani.
  • Drilling has been slightly slower than planned due to inclement weather and relatively poor ground conditions. 4 out of the 5 holes reported were stopped in mineralization due to poor ground – an uncharacteristically high percentage.
  • Thick Li-rich volcanic rocks continue to be intersected including 82 m of 3,322 ppm Li (0.72% Li2O) from 42 m below surface at Platform 10
  • Delineation drilling will continue to the west where lithium mineralization mapped and sampled at surface has expanded the current E-W footprint, which is now over 2km.
    (Figure 1 – Updated NW-SE Interpreted Cross Section & Location Map PL19A-3-1-8-9-10-25)

Ian Stalker, Executive Chairman and Interim CEO of Plateau Energy Metals, commented

We now expect our maiden lithium mineral resource estimate for Falchani, to be finalized and reported early in this 3rd Quarter.

It is important to note that the drilled area that will be covered in this initial Resource, will cover only +/- 25% of the known extent of the mapped lithium-rich tuff unit, and we therefore expect Falchani to grow much larger. The large footprint and thick intersections of lithium-rich tuff at Falchani have remained very consistent, as have the high grades. We remain confident Falchani can eventually grow into one of the largest open-pittable near surface lithium deposits in the world.

Drilling continues with three Company-owned rigs at Falchani. The snowy weather that caused the minor delays and contributed to the ‘lost holes’, has ceased for the moment.

On-going test-work at ANSTO Minerals that will culminate in laboratory-based production of Lithium Carbonate from our Falchani feed material continues on track and will be reported separately.

Ted O’Connor, Director of Plateau Energy Metals, commented: “These delineation drill hole results continue to prove up Falchani, and we believe we have successfully established the southeastern edge of this lithium deposit cut by a previously unknown intrusion. All indications point to extending the drill coverage to the west and north of current resource drilling. Drilling will test the footprint and continue to grow the deposit well after the maiden resource drilling cut-off date.”

Drill Results - Details
Platform 10 Vertical Hole – 143.0 m total length
82 m of Lithium-rich tuff unit intersected 3,322 ppm Li (0.72% Li2O) from 41-123 m

  • 103 m of 2,848 ppm Li (0.61% Li2O) in broader interval from 37 to 140 m, that includes 8 m of Li-rich breccias located above the tuff unit and 17 m of Li-rich breccias below the tuff unit
  • No surface uranium mineralization intersected as hole started in barren rhyolite

Platform 25 Vertical Hole – 42.0 m total length

  • High-grade lithium-rich tuff unit at surface intersected 31 m of 3,513 ppm Li (0.76% Li2O) to 31 m
  • 42 m of 2,737 ppm Li (0.59% Li2O) in broader interval that includes 10 m of Li-rich breccias located below the tuff unit from 0-42 m (End of Hole)
  • No surface uranium mineralization intersected as hole started in Li-rich tuff unit
  • Hole lost in Li mineralization due to ground conditions

Platform 19A Vertical Hole – 42.0 m total length

  • High-grade lithium-rich tuff unit at surface intersected 11 m of 3,251 ppm Li (0.70% Li2O)
  • Lower grade breccias separate a lower Li-rich tuff intersection of 17 m of 3,458 ppm Li (0.74% Li2O) from 25-42 m (End of Hole)
  • Including the intervening breccia unit the entire 42 m drill hole averaged 2,637 ppm Li (0.57% Li2O)
  • No surface uranium mineralization intersected as hole started in Li-rich tuff unit
  • Hole lost in Li mineralization due to ground conditions

Platform 19A S Inclined Hole drilled to 180° Azimuth @ -65° inclination – 59.0 m total length

  • High-grade lithium-rich tuff unit from surface intersected 12 m of 3,375 ppm Li (0.73% Li2O)
  • Lower grade Li breccias and a previously unknown felsic intrusion were intersected beneath the lithium mineralization with variable Li contents ranging from 484 ppm to 1,110 ppm Li
  • This is interpreted to be near the southeastern limit of the Falchani lithium deposit

Platform 6 Vertical Hole – 104.0 m total length

  • 5 m of Li-rich breccia and 38 m of high-grade lithium-rich tuff unit (42 m intersection) averaged 3,630 ppm Li (0.78% Li2O) from 61 to 104 m (End of Hole)

Hole lost in Li mineralization due to ground conditions

Falchani Lithium Deposit Highlights

  • Delineation drilling has extended the drilled coverage over 1 km to the north west towards surface samples with continued thick (50-140 m thick) Lithium-rich tuff unit
  • Mapping and sampling has established the surface footprint of Li-rich tuff which is now approximately 2.2 km wide (East-West) and 1.7 km long (North-South).
  • Continued consistent high average Li grades >3,250 ppm Li (0.70% Li2O) over the entire unit
  • Unique and straightforward geology, geometry, grade consistency and overall thickness leads to simple interpretation, mineral deposit modeling and resource estimation
  • Shallow, open pit mining potential from surface to ~250 m depth points to <1:1 strip ratio
  • Consistent 80-90% Li leaching with simple warm acid leaching from this uncomplicated deposit should result in a cost-effective future operation

The Company is currently continuing to drill the Falchani discovery with additional diamond drill holes planned to expand the mineralized footprint and establish an initial mineral resource estimate early in the current quarter


<< Previous
Bullboard Posts
Next >>