RE:RE:RE:RE:RE:Transcript of Conference CallThey are in the process of laying a larger 8 inch distribution pipe in parallel to the existing 6 inch pipe at their gas terminal to cure the bottleneck. Colombia's biggest gas producer is building a new pipeline as we speak to bring CNE's gas discoveries to market with 20% capacity available to CNE by Dec. The remaining 80% by spring 2019. Contracts are signed, the demand for natural gas is there. Now it's just a matter of waiting for the construction to be completed. No point in chirping off that Gamba will fail to deliver before the results are in.