GREY:MRRCF - Post by User
Post by
scottyBoy8on Nov 13, 2018 6:07pm
67 Views
Post# 28968615
Construction
ConstructionWhat they need to do is get the steel up for phase two so they can work inside all winter and have phase two ready for spring. If they don't get the steel frame / walls up, there is no way they are going to be able to work and complete anything on phase two all winter with no walls and no heat.....
I've been here for a long time and it's painful watching people make excuses as this drops ... I told you yesterday I was going to get cheap shares because the entire weed stock had fiancials releasing and all you gave me 1 star ;D
Thx for the cheap shares today again.....
Honestly we are on the CSE also known as the Corrupt Stock exchange ..... They walk this thing down all the time .... Cannacord has a lot of control too they could easily make this stock pop
Maybe we are getting walkekd down so somebody can jump in and invest in us ... It seems to look that way too with the end of day spikes in volume after being walked down the entire day
Lets hope they have something cooking in the EU because they are sure trying to hint at it with tweets coming out from Ben sitting in the UK......