RE:RE:RE:RE:RE:RE:RE:RE:RE:Debt and interest owed?ganndoplh - Hey!. You're still in the game. Thought you disappeared.
With respect to your analysis on Bjorkdal production, the underground head grade of 2.2 g/t Au puts the annual production at 79,200 ounces. This blows out the 2021E on the investor presentation. Bjorkdal has definitely returned to profittable. And, picking up the slack on the Brunswick production.
The Costerfield production numbers have not been reforecatsed to date. It's going to be interesting horse race as the Youle production ramps up. Do you have any idea when they'll reach the zone (300m to go) and how long it will take to install the infrastructure?
Back to the DH geophysics. Do you think the geophysics coverage on the directional drill head is comparable to doing the geophysics independently after the drilling?