RE:RE:RE:RE:Anggun 1-X Pep Talk They drilled the AYU well because it was a significantly cheaper road. Their main risk was hydrocarbon source. AYU proved the source was connected the structure.
They then drilled ELOK to complete their first term commitments.
Anggun was technically the best location and now they have built a permanent road. Exciting finish to 2019.