Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Giyani Metals Corp V.EMM

Alternate Symbol(s):  CATPF

Giyani Metals Corp. is a battery metal development company. It produces sustainable, low carbon high purity battery-grade manganese for the electric vehicle (EV) industry. It has developed a hydrometallurgical process to produce battery-grade high-purity manganese sulphate monohydrate (HPMSM), a lithium-ion battery cathode precursor material critical for EVs, directly from ore supplied by its own manganese oxide (MnO) deposits. These include the K.Hill Battery-Grade Manganese Project, the Otse MnO prospect (Otse) and the Lobatse MnO prospect (Lobatse). The K.Hill Project, Otse, and Lobatse are located in the Kanye Basin of south-eastern Botswana (the Kanye Basin Prospects) and held through Menzi Battery Metals (Pty) Limited, a subsidiary of the Company. Its segments include Botswana Battery Metals Project for the exploration, evaluation and development of its battery-grade manganese assets located in Botswana and the demonstration plant under construction in South Africa and Corporate.


TSXV:EMM - Post by User

Bullboard Posts
Post by Bossladyon Sep 03, 2020 1:33pm
136 Views
Post# 31504741

Looks like some News after lunch today.......

Looks like some News after lunch today.......https://www.stockwatch.com/News/Item?bid=Z-C:EMM-2959533&symbol=EMM&region=C

Does't look like any of the metrics of the process have changed except for the product used, but price, availability, work hours ...seems like all costs are equal and the project economics still "robust"  The study was done by Tetra Tech , so you got your two cents worth in there KolKut! 
Cheers
Bullboard Posts