Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Discovery Silver Corp T.DSV

Alternate Symbol(s):  DSVSF

Discovery Silver Corp. is a precious metals company engaged in the acquisition, development and operation of assets. The Company’s flagship asset is its 100%-owned Cordero project, an undeveloped silver deposit, which is located close to infrastructure in a mining belt in Chihuahua State, Mexico. The key targets being evaluated include La Perla (10 kilometers (km) south of Cordero), Dos Mil Diez (immediately southwest of Cordero) and Porfido Norte (10 km north of Cordero).


TSX:DSV - Post by User

Post by Bluetickon Mar 15, 2021 10:00am
288 Views
Post# 32797726

NEWS

NEWS

Discovery Reports 2,290 g/t AgEq over 1.3 m and 1,605 g/t AgEq over 2.9 m in Vein Drilling at Cordero

  •  
  •  
Discovery Metals Corp
·14 min read
  •  
  •  

TORONTO, March 15, 2021 (GLOBE NEWSWIRE) -- Discovery Metals Corp. (TSX-V: DSV, OTCQX: DSVMF) (“Discovery” or the “Company”) is pleased to announce results from 14 diamond drill holes targeting the Josefina and Todos Santos high-grade vein trends at its flagship Cordero project (“Cordero” or “the Project”) located in Chihuahua State, Mexico. Multiple vein trends with a combined strike extent of more than 5 km flank the higher-grade bulk-tonnage domain at Cordero; the Josefina and Todos Santos vein trends currently represent approximately 3 km of this strike extent.

Highlight intercepts include:

Josefina Vein

  • 1.3 m averaging 2,166 g/t AgEq¹ from 95.6 m (1,581 g/t Ag, 0.15 g/t Au, 9.9% Pb and 5.4% Zn) in hole C20-381

  • 1.0 m averaging 1,826 g/t AgEq¹ from 41.2 m (1,280 g/t Ag, 4.24 g/t Au, 1.6% Pb and 3.4% Zn) within an 8.9 m interval averaging 410 g/t AgEq¹ (267 g/t Ag, 0.91 g/t Au, 0.9% Pb, 0.8% Zn) in hole C20-382

  • 1.3 m averaging 2,290 g/t AgEq¹ from 136.7 m (1,607 g/t Ag, 2.06 g/t Au, 5.2% Pb and 8.0% Zn) in hole C20-396

South Corridor

  • 2.9 m averaging 1,605 g/t AgEq¹ from 44.4 m (992 g/t Ag, 0.73 g/t Au, 12.9% Pb and 2.4% Zn) in hole C20-383

Todos Santos Vein

  • 1.4 m averaging 1,107 g/t AgEq¹ from 135.4 m (552 g/t Ag, 0.33 g/t Au, 11.0% Pb and 3.4% Zn) within a 4.0 m interval averaging 763 g/t AgEq¹ (377 g/t Ag, 0.28 g/t Au, 7.1% Pb, 2.7% Zn) in hole C20-385

  • 1.2 m averaging 875 g/t AgEq¹ from 186.5 m (241 g/t Ag, 0.52 g/t Au, 4.6% Pb and 10.4% Zn) in hole C20-387

  • 2.8 m averaging 670 g/t AgEq¹ from 166.3 m (207 g/t Ag, 0.15 g/t Au, 3.7% Pb and 7.7% Zn) in hole C20-397

Taj Singh, President and CEO, states: Our confidence in the continuity of the high-grade vein trends at Cordero continues to grow. 20 holes have now been drilled at the 1.5km Todos Santos vein trend. Remarkably, all 20 holes have intercepted the principal vein returning an average drilled width of 2.6m grading 635 g/t AgEq. At Josefina we continue to intercept bonanza grades along 1.5km of strike extent including, in this release, some of the highest grades intercepted on the project to date. We will continue to systematically advance this new and exciting component of our story as we move towards the delivery of our updated resource in 3Q 2021 and PEA in 4Q 2021. The updated resource and PEA will focus on the bulk-tonnage domain at Cordero; we hope to add the high-grade vein component to Cordero project economics in 2022.

JOSEFINA VEIN:

The Josefina vein trend consists of two principal southwest-trending subparallel veins with an interpreted strike extent of approximately 1.5 km. The eight holes in this release were successful in confirming continuity of bonanza grade mineralization along the central and northeast parts of the vein trend. Drilling has confirmed the depth continuity of veins at Josefina to approximately 370 m below surface. The vein trend is open at depth below this and along strike in both directions.

The veins along the Josefina trend dip steeply to the northwest and mineralization typically consists of semi-massive pyrite, galena and sphalerite. Further drilling is still required to accurately estimate the true width of the veins. Drill hole locations and current vein interpretations are shown in Figure 1 (see links below) and detailed drill highlights of the holes from this release at Josefina are provided in the table below.

Hole ID

From
(m)

To
(m)

Width
(m)

Ag
(g/t)

Au
(g/t)

Pb
(%)

Zn
(%)

AgEq¹
(g/t)

C20-379

91.1

91.4

0.4

713

0.18

5.0

8.4

1,253

and

99.1

99.8

0.7

304

0.15

4.5

15.6

1,122

and

171.9

172.2

0.3

1,010

0.27

5.7

9.3

1,620

                 

C20-381

95.6

96.9

1.3

1,581

0.15

9.9

5.4

2,166

including

95.9

96.4

0.5

3,750

0.26

23.3

11.5

5,067

                 

C20-382

34.0

42.9

8.9

267

0.91

0.9

0.8

410

including

41.2

42.2

1.0

1,280

4.24

1.6

3.4

1,826

                 

C20-386

141.3

164.0

22.7

35

0.04

0.5

1.3

111

and

197.9

199.6

1.7

333

0.41

3.3

6.2

741

and

215.9

218.5

2.7

416

0.21

5.8

6.3

899

                 

C20-392

36.2

39.2

3.1

58

0.10

1.9

6.9

419

including

36.6

37.4

0.8

98

0.33

2.8

16.4

904

                 

C20-394

179.8

180.8

1.1

135

0.61

3.3

6.9

588

                 

C20-395

410.7

420.7

10.0

92

0.09

2.4

3.4

324

and

410.7

414.7

3.9

110

0.05

2.7

4.4

392

                 

C20-396

84.2

84.6

0.4

572

0.13

7.4

11.2

1,306

and

136.7

138.0

1.3

1,607

2.06

5.2

8.0

2,290

including

136.7

137.1

0.4

3,930

5.89

8.8

14.6

5,327

¹For full supporting technical disclosure please refer to footnote 1 under the table of Additional Veins results.

TODOS SANTOS VEIN:

The Todos Santos vein trend, consisting of the Main Vein and Footwall Vein, has an interpreted southwest strike extent of at least 1.5 km and depth extent of at least 300 m based on historic underground workings and drilling. In total 20 holes have been drilled at Todos Santos; 9 historic holes and 11 holes drilled by Discovery (including four holes in this release). All 20 holes intercepted the Main Vein returning an average drilled width of 2.6m grading 635 g/t AgEq¹. Holes C20-385 (4.0 m averaging 763 g/t AgEq¹) and C20-387 (3.2 m averaging 576 g/t AgEq¹) in this release extended the drill-confirmed strike extent of the Main Vein by approximately 50 m to the southwest. The Todos Santos vein trend is open along strike in both directions and at depth.

High-grade mineralization in both the Main Vein and Footwall Vein is typically associated with quartz-carbonate veins that dip steeply to the northwest. Mineralization typically consists of galena, sphalerite and pyrite. Further drilling is still required to accurately estimate the true width of the veins at Todos Santos. Drill hole locations and current vein interpretations are shown in Figure 1 (see links below) and detailed drill highlights of the holes drilled at Todos Santos from this release are provided in the table below.

Hole ID

From
(m)

To
(m)

Width
(m)

Ag
(g/t)

Au
(g/t)

Pb
(%)

Zn
(%)

AgEq¹
(g/t)

C20-385

132.9

136.8

4.0

377

0.28

7.1

2.7

763

including

135.4

136.8

1.4

552

0.33

11.0

3.4

1,107

                 

C20-387

184.5

187.7

3.2

175

0.48

3.3

5.9

576

and

186.5

187.7

1.2

241

0.52

4.6

10.4

875

                 

C20-391

116.2

117.7

1.5

274

0.05

4.4

2.8

551

                 

C20-397

166.3

169.1

2.8

207

0.15

3.7

7.7

670

¹For full supporting technical disclosure please refer to footnote 1 under the table of Additional Veins results.

ADDITIONAL VEINS:

C20-383, drilled to the northwest of Josefina and in the middle of the South Corridor intercepted a previously unidentified breccia-fault near-surface that reported 1.7 m averaging 2,242 g/t AgEq¹. C20-389, drilled in the North Corridor to the southwest of Todos Santos, intercepted two previously unknown veins at depth. The veins reported 2.4 m averaging 463 g/t AgEq¹ and 0.8 m averaging 941 g/t AgEq¹. Evaluation of these new veins including follow-up drill targeting is ongoing. Further drill highlights from these two holes are provided in the table below.

Hole ID

From
(m)

To
(m)

Width
(m)

Ag
(g/t)

Au
(g/t)

Pb
(%)

Zn
(%)

AgEq1
(g/t)

C20-383

44.4

47.2

2.9

992

0.73

12.9

2.4

1,605

including

44.4

46.1

1.7

1,375

1.04

19.4

2.4

2,242

and

83.4

84.1

0.7

1,865

0.85

7.0

7.9

2,510

and

138.0

163.5

25.5

28

0.06

0.4

0.6

72

                 

C20-389

362.7

365.2

2.4

120

0.51

3.3

4.5

463

and

367.9

368.7

0.8

416

0.10

8.8

5.0

941

1All results in this news release are rounded. Assays are uncut and undiluted. Widths are drilled widths, not true widths, as a full interpretation of the actual orientation of mineralization is not complete. Intervals with stockwork mineralization were chosen based on a 25 g/t AgEq cutoff with no more than 10 m of dilution. Intervals with vein mineralization were based on a 100 g/t AgEq cutoff with no more than 1 m of dilution. AgEq calculations are used as the basis for total metal content calculations given Ag is the dominant metal constituent as a percentage of AgEq value in approximately 70% of the Company’s mineralized intercepts. AgEq calculations for reported drill results are based on USD $16.50/oz Ag, $1,350/oz Au, $0.85/lb Pb, $1.00/lb Zn. The calculations assume 100% metallurgical recovery and are indicative of gross in-situ metal value at the indicated metal prices. Refer to Technical Notes below for metallurgical recoveries assumed in the 2018 PEA completed on Cordero.

PHASE 1 DRILL PROGRAM UPDATE:

The Company has completed 58,600 m (148 holes) as part of its expanded 65,000 m Phase 1 drill program. Assays from 24 holes are pending. There are currently four drill rigs operating on site. Additional drill rigs may be added when the Company is confident that the health and safety risks related to COVID-19 can be managed effectively.

Drilling is focused on two key concepts: (1) targeting of bulk-tonnage mineralization within and to the east and northeast of both mineralized corridors; and (2) systematic testing of the width, grade and continuity of extensive high-grade vein systems that transect the deposit. Our immediate focus is on drilling bulk-tonnage targets for inclusion in the updated resource estimate in 3Q 2021 and PEA in 4Q 2021.

Supporting maps and sections, drill hole locations and full assay results can be found at the following link: https://dsvmetals.com/site/assets/files/5645/20210315_dsv_sa.pdf

A PDF of this release with supporting maps and sections included as appendices can be found at the following link: https://dsvmetals.com/site/assets/files/5645/20210315_dsv_nr.pdf

About Discovery

Discovery’s flagship project is its 100%-owned Cordero project, one of the few silver projects globally that offers margin, size and scaleability. The project is located in a prolific mining belt in Chihuahua State, Mexico, and is supported by an industry leading balance sheet with over C$95 million of cash allocated for aggressive exploration, resource expansion and future development. Discovery was a recipient of the 2020 TSX Venture 50 award and the 2021 OTCQX Best 50 award.

Sample analysis and QA/QC Program

True widths of reported drill intercepts have not been determined. Assays are uncut except where indicated. All core assays are from HQ drill core unless stated otherwise. Drill core is logged and sampled in a secure core storage facility located at the project site 40km north of the city of Parral. Core samples from the program are cut in half, using a diamond cutting saw, and are sent to ALS Geochemistry-Mexico for preparation in Chihuahua City, Mexico, and subsequently pulps are sent to ALS Vancouver, Canada, which is an accredited mineral analysis laboratory, for analysis. All samples are prepared using a method whereby the entire sample is crushed to 70% passing -2mm, a split of 250g is taken and pulverized to better than 85% passing 75 microns. Samples are analyzed for gold using standard Fire Assay-AAS techniques (Au-AA24) from a 50g pulp. Over limits are analyzed by fire assay and gravimetric finish. Samples are also analyzed using thirty three-element inductively coupled plasma method (“ME-ICP61”). Over limit sample values are re-assayed for: (1) values of zinc > 1%; (2) values of lead > 1%; and (3) values of silver > 100 g/t. Samples are re-assayed using the ME-OG62 (high-grade material ICP-AES) analytical package. For values of silver greater than 1,500 g/t, samples are re-assayed using the Ag-CON01 analytical method, a standard 30 g fire assay with gravimetric finish. Certified standards and blanks are routinely inserted into all sample shipments to ensure integrity of the assay process. Selected samples are chosen for duplicate assay from the coarse reject and pulps of the original sample. No QAQC issues were noted with the results reported herein.

Qualified Person

Gernot Wober, P.Geo, VP Exploration, Discovery Metals Corp., is the Company's designated Qualified Person for this news release within the meaning of National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) and has reviewed and validated that the information contained in this news release is accurate.

On Behalf of the Board of Directors,

Taj Singh, M.Eng, P.Eng, CPA,
President, Chief Executive Officer and Director

For further information contact:

Forbes Gemmell, CFA
VP Corporate Development & Investor Relations
Phone: 416-613-9410
Email: forbes.gemmell@dsvmetals.com

TECHNICAL NOTES & FORWARD-LOOKING STATEMENTS:

The most recent technical report for the Cordero Project is the 2018 Preliminary Economic Assessment (PEA) authored by M3 Engineering and Technology Corp and includes the most recent resource estimate, completed by Independent Mining Consultants, Inc. It is available on Discovery’s website and on SEDAR under Levon Resources Ltd, a wholly owned subsidiary of Discovery. The PEA assumes metallurgical recoveries of 89% for Ag, 84% for Pb, 72% for Zn and 40% for Au.     .......Bluetick

 

<< Previous
Bullboard Posts
Next >>