ScheduleHere is my take on the upcoming schedule. The seismic operation will run to Nov 1. The next move will be to drill for oil. So they will take some time to analyze the seismic and drill data to pick a spot that they hope will produce oil. So give them a month to do that. Drilling would then start around Dec 1. The first two wells took about 5 months drilling time, so lets say, the 3rd one takes 2.5 months. So that means that we are looking at mid Feb 2022 for a positive result of oil. I would hope that they would publish strong data before the third well begins drilling. If we are lucky they will post some of the other drill data before November. But the bottom line is that we are aout 6 months from having the first flow of oil.