Hole K-21-0800B 3,748 g/t (120.50 oz/t) AgWith commissioning of the secondary grinding mill using Bermingham ore feed, extended periods of throughput at 17 tonnes per hour (400 tonnes per day run rate) has been achieved along with design metallurgical performance and concentrate Ag grades in excess of 18,000 g/t being produced.
https://www.alexcoresource.com/news/alexco-reports-final-results-from-2021-bermingham-drilling-program-composite-assays-to-1-383-g-t-ag-over-11.09-meters-true-width/