RE:RE:RE:Near as I can findI'm not the one making the wild assumptions Gamble - that's you when you assume an obvious nugget effect in 3 of 109 1 to 3 kg samples samples can be included to reflect the grade of the 27,000 tonne waste pile as a whole.
Tell us what the grade of the pile would be if that one single 300+ g/t hole had been drilled just 1 foot to the side? You can't or won't, which tells me you are deliberately trying to mislead people about the overall grade of the waste.