Mill ran over capacity @ 500 tpd during December
During December 2021, additional mill throughput campaigns were completed and the mill reached a peak throughput of 22.5 dry metric tonnes (“dmt”) per hour over a sustained period, which is 25% higher than the 18 dmt per hour (equivalent to 400 tonnes per day) design capacity of the mill.