Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Torq Resources Inc V.TORQ

Alternate Symbol(s):  TRBMF

Torq Resources Inc. is a Canada-based copper and gold exploration company with a portfolio of holdings in Chile. The Company's projects include Santa Cecilia and Margarita. The Santa Cecilia mineral exploration project is a 3,250-hectare property located approximately 100 kilometers (kms) east of the city of Copiapo, Chile, in the southern region of the world-class Maricunga belt and immediately north of the El Indio belt. The belt is characterized by gold epithermal and gold-copper porphyry deposits. The Margarita Iron-Oxide-Copper-Gold (IOCG) project is comprised of approximately 1,445 hectares and is located in Chile, 65 kms north of the city of Copiapo with access to infrastructure. The property is located within the prolific Coastal Cordillera belt that hosts the world-class Candelaria (Lundin Mining Corp.) and Mantoverde (Mantos Copper Holding) IOCG mines, and porphyry-skarn deposits such as Santo Domingo (Capstone Mining Corp.) and Inca de Oro (PanAust/Codelco).


TSXV:TORQ - Post by User

Post by montydogon May 02, 2022 7:59am
218 Views
Post# 34646838

Results

Results

Torq Makes New Discovery at its Margarita Iron-Oxide Copper-Gold Project: 90 metres of 0.94% Copper and 0.84 g/t Gold

 

May 2, 2022

 

Vancouver, Canada – May 2, 2022 – Torq Resources Inc. (TSX-V: TORQ, OTCQX: TRBMF) (“Torq” or the “Company”) is pleased to announce the discovery of a new copper and gold sulphide system as a result of its maiden 4,075 metre (m) reverse – circulation (RC) drill program at its Margarita Iron-Oxide-Copper-Gold (IOCG) project, located in northern Chile about 65 kilometres (km) north of the city of Copiapo. Drill hole 22MAR-013R intersected 90 m of 0.94% copper and 0.84 g/t gold at a depth of 50 m – 140 m. This discovery successfully identified the copper and gold sulphide source mineralization to the abundant copper oxide mineralization observed on the southern margin of the project, validating the Company’s exploration thesis, and represents the potential for a significant new IOCG discovery in the Cretaceous Coastal Cordillera belt in northern Chile (Figure 1). A summary of the drill results is presented in Table 1.

A Message from Shawn Wallace, Executive Chair:

“This copper and gold discovery drill hole is a remarkable success for Torq. After only acquiring the Margarita project a year ago, our team was able to uncover the potential for an entirely new IOCG deposit in Chile from its maiden 13-hole drill program on a project that had never been drilled before. We are incredibly impressed by the work of our technical team and their ability to move quickly and methodically in recognizing the opportunity at Margarita at an early stage and then delivering the kind of results all exploration companies strive for. We are now diligently preparing for a follow-up drill program and will update shareholders and stakeholders of our plans in the very near future.”

A Message from Michael Henrichsen, Chief Geological Officer: 

“In the first ever modern drill program at the Margarita project, the Company has demonstrated the true potential of the property with a meaningful discovery. The mineralization has a clear signature over a 1 km strike length, and we believe there is significant potential for the project to host a substantial mineralized body. We greatly look forward to the second phase of drilling this summer when we will aim to outline a world-class IOCG deposit.”

A Message from Waldo Cuadra, General Manager of Chile:

“Rarely does an exploration team on its first drill program achieve noteworthy success with the discovery of a significant mineralized section. The Margarita project has the potential to be Chile’s next major IOCG discovery, and after a long process of monitoring this project over the years, it is very gratifying to drill Margarita successfully with a team of experienced and motivated geologists as well as the full support of our executive team in Vancouver. I am proud to lead our team of geologists in Chile toward our objective of defining an IOCG – type deposit.”

Table 1: Summary of drill results

Hole ID

From

To

Length

Cu %

Au g/t

Au g/t

Cu %

       

0.2% Cu Cutoff1

0.1 g/t Au Cutoff2

21MAR-001R

No significant intervals

21MAR-002R 

6

18

12

0.31 

0.014 

-

-

300

304

4

-

-

0.175

0.01

21MAR-003R

54

70

16

0.22

0.042

-

-

96

106

10

0.33

0.031

-

-

22MAR-004R

14

28

14

0.29

0.125

-

-

16

28

12

-

-

0.134 

0.30

52

62

10

0.32

0.035

-

-

74

90

16

0.32

0.034

-

-

22MAR-005R

No significant intervals

22MAR-006R

4

24

20

-

-

0.267 

0.10

30

52

22

-

-

0.127 

0.12

22MAR-007R

54

68

14

0.32

0.016

   

22MAR-008R

22

30

8

-

-

0.180 

0.06

40

42

2

-

-

0.250 

0.11

58

72

14

-

-

0.126 

0.05

22MAR-009R

No significant intervals

22MAR-010R

No significant intervals

22MAR-011R

No significant intervals

22MAR-012R

Results pending

22MAR-013R

50

140

90

0.94

0.838

-

-

64

140

76

-

-

0.983 

1.02

200

202

2

0.59

0.095

-

-

294

318

24

-

-

0.156 

0.10

  • Intervals - no less than 5m of >= 0.2 % Cu, maximum consecutive dilution 5m
  • Intervals - no less than 5m of >= 0.1 g/t Au, maximum consecutive dilution 5m

Technical Discussion of Drill Hole 22MAR-013R:

The discovery of significant iron-oxide-copper-gold mineralization was made through a combination of geological, geochemical and geophysical vectors. The mineralization is situated along the north-northwest trending Falla 13 strike-slip reverse structure, which has been mapped on the property over a strike length of at least 2 km with associated strong hematite-argillic-sericitic alteration (Figure 2-3). Soil geochemistry conducted using portable X-Ray fluorescence (pXRF) shows a 900 m copper anomaly situated along the Falla 13 structure, which is coincident with the mineralization in drill hole 22MAR-013R (Figure 4). Importantly, this copper-in-soils anomaly is terminated to the south by volcanic cover associated with the Remolino rhyolite dome. The Company’s technical team believes this mineralized signature has the potential to extend beneath this cover sequence of volcanic rocks. In addition, there is a strong correlation between the mineralized intercept and strong magnetic and conductivity highs from ground-based geophysical surveys, which are associated with magnetite, copper sulphide mineralization and strong hydrothermal alteration along the Falla 13 structure, respectively (Figures 5-6). Collectively, the geological, geochemical and geophysical signatures encountered in drill hole 22MAR-013R extend along strike for approximately 1 km, demonstrating the potential to expand on the initial discovery.

Drill hole 22MAR-013R is hosted within a wide structural corridor, which is interpreted to exist at a depth between 20 m – 250 m, and which exhibits a typical IOCG zonation where the higher grade mineralization is associated with shallow silica-hematite-pyrite-chalcopyrite mineral assemblage that grades vertically downward into a magnetite-hematite-chalcopyrite-pyrite mineral assemblage at a depth of 50 m – 140 m. The higher grade mineralization is interpreted to be associated with breccia bodies and associated veining hosted within a diorite and quartz diorite intrusive complex. The upper portion of the mineralized intercept, from 40 m – 106 m, is characterized as a zone of mixed secondary iron and copper oxide minerals and a sulphide mineral assemblage of chalcopyrite and pyrite that grades into sulphide-only mineralization at a depth of 106 m - 140 m (Figure 7). From 140 m – 192 m, mineralization is characterized by abundant pyrite mineralization (5%-20%) with low copper values averaging 48 parts per million (ppm). From 192 m – 250 m, the mineralization is characterized by primary 5%-10% pyrite mineralization, with an average of 768 ppm copper that is associated with silica-magnetite-hematite alteration. The hole ended with 250 m - 360 m of silica-chlorite and calc-sodic alteration showing intervals with over 20% of disseminated pyrite. The Company is currently planning a follow-up drill program to continue to explore the Falla 13 structural corridor over an approximate strike length of 1 km.

Increased Land Position: 

The Company has increased its land position at the Margarita project, acquiring an additional 200 hectares on the northern margin of the property, in order to expand the exploration potential as well as to create a larger buffer around the discovery drill hole, 22MAR-013R (Figure 8).

Figure 1: Illustrates the position of the discovery hole in the north – central region of the project along the Falla 13 structural corridor.

Figure 2: Illustrates a cross section of the structurally controlled mineralization associated with silica-hematite-magnetite bodies, as highlighted by the red colour, encountered in drill hole 22MAR-013R.

Figure 3: Illustrates a view to the north of the Falla 13 structural corridor. The surface expression of mineralization encountered in drill hole 22MAR-013R is represented by strong silica-hematite alteration with sulphide boxwork, limonite and copper-oxide staining along fractures.

Figure 4: Illustrates the 900 m copper-in-soils geochemical anomaly, as defined by portable X-ray flouresence (pXRF) along the Falla 13 structural corridor.

Figure 5: Illustrates the magnetic high associated with the mineralization encountered in drill hole 22MAR-013R, which is interpreted to be associated with magnetite breccia bodies and associated copper – gold mineralization.

Figure 6: Illustrates the conductivity high associated with the mineralization encountered in drill hole 22MAR-013R, which is interpreted to be associated with intense potassic and sodic alteration along the Falla 13 structural corridor.

Figure 7: Illustrates the mixed oxide/sulphide and sulphide-only styles of mineralization observed within the RC chips that display abundant chalcopyrite and pyrite.

Figure 8: Illustrates the newly acquired land position on the northern margin of the project where 200 additional hectares were added to the project with the acquisition of the Par a Once and Par a Doce claims.

Michael Henrichsen P.Geo, Torq’s Chief Geological Officer, is the qualified person as defined by NI 43-101 (Standards of Mineral Disclosure) who assumes responsibility for the technical contents of this press release.

ON BEHALF OF THE BOARD,

Shawn Wallace
Executive Chair

For further information on Torq Resources, please visit www.torqresources.com or contact Natasha Frakes, Vice President of Corporate Communications at (778) 729-0500 or info@torqresources.com.

 
<< Previous
Bullboard Posts
Next >>