Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

PyroGenesis Inc T.PYR

Alternate Symbol(s):  PYRGF

PyroGenesis Inc., formerly PyroGenesis Canada Inc., is a Canada-based high-tech company. The Company is engaged in the design, development, manufacture and commercialization of advanced plasma processes and sustainable solutions which reduce greenhouse gases (GHG). The Company has created proprietary, patented and advanced plasma technologies that are used in four markets: iron ore palletization, aluminum, waste management, and additive manufacturing. It provides engineering and manufacturing expertise, contract research, as well as turnkey process equipment packages to the defense, metallurgical, mining, additive manufacturing (including 3D printing), oil and gas, and environmental industries. Its products and services include plasma atomized metal powders, aluminum and zinc dross recovery, waste management, plasma torches, and innovation/custom process development. It offers PUREVAP, which is a high purity metallurgical grade silicon and solar grade silicon from quartz.


TSX:PYR - Post by User

Comment by Trader001on May 04, 2022 9:22pm
270 Views
Post# 34657290

RE:RE:RE:RE:Some interesting posts regarding Rio Tinto (Client B)

RE:RE:RE:RE:Some interesting posts regarding Rio Tinto (Client B)Casanvantghost must be a dark foul spirit....You rather cheer for team bash? 

You claim to be long yet you attack great posters such as BCONTVentures.

Thanks BCONTVentures and others for your posts which are very imformative to many of us especially myself who mostly just read and rarely post.  



Casavantsghost wrote:

You may have the poster on ignore.. I do.. I had un-ignore for a moment to get you this. Had to put the gentleman on ignore long ago for incessant pump posting and for their political stuff. Fully support their right to post it but just had to let it go. It's easier that way...  So.. I did this for your benefit..

 

@BCONTVentures Some interesting posts from the PyroGenesis Facebook group regarding Rio Tinto (thanks to the member for posting this on FB):

It may not be directly related to Pyro, but it's interesting to see that IOCC (Rio Tinto, Client B) needs a senior engineer specialized in high voltage in Labrador City. That's what we need to power the 130 torches

About the role
We are looking for a Senior Electrical Engineer (Power Systems) to design and implement sustainable electrical power distribution projects as an integral part of the engineering team. Role will be responsible to utilize extensive knowledge and experience to lead the design in capital projects at an industrial environment. Role occasionally contributes to reviewing and witnessing of testing and commissioning activities as well as trouble shooting of critical assets. https://jobs.riotinto.com/job/15677403/senior-engineer-high-voltage-labrador-city-ca/?fbclid=IwAR3htydx4F4H3EYfQUJTrJ1rZKvak-oOwD-RveYV60pYmmU76Kcsw4Q-5eI

And: I just posted a job offer at IOCC for a senior electrical engineer. But here is another one very interesting for a Supervisor - Power distribution. The description talks about the transmission and distribution of 250 MW of electrical power. That's a lot of power. Enough to supply 130 1MW plasma torches. To put this into perspective, if all that power comes from Muskrat Falls hydroelectric generating facility, it would represent nearly one third of its production (250 MW on a total of 824 MW).

About the role
We are looking for a Supervisor – Power Distribution to provide technical support and fill in for the shift Supervisors (as required) for the transmission and distribution of approximately 250 MW of electrical power. When filling in for the Supervision role, this position will be the power authority on site and responsible for direct supervision of a team of Electricians and Linespersons for work direction and execution of the work plan. The role is based in Labrador City, NL https://jobs.riotinto.com/job/15686608/supervisor-power-distribution-labrador-city-ca/?fbclid=IwAR0_d7U6uaHI6FlJ3OTEOi01mLiSq58Uki0norfteyeCkk3sLj82iUZ_lOU


@BCONTVentures Keep in mind that for Client B (Rio Tinto/IOCC), they will be having the power from Muskrat Falls available in May. (Regarding the above ^^ post).

 

GOGREENBABY wrote: Where are these posts that you speak of?

 

 



<< Previous
Bullboard Posts
Next >>