NINE- Getting some well deserved attention the last few daysWatch for the next news it could be really good
Nine Mile drills "visual mineralization" at Nine Mile
2022-05-25 10:54 ET - News Release
Mr. Charles MaLette reports
NINE MILE METALS ANNOUNCES COMPLETION OF DRILL PROGRAM (PHASE 1) AND REPORTS VISIBLE, MASSIVE HIGH-GRADE COPPER VMS MINERALIZATION AT ITS FLAGSHIP NINE MILE BROOK VMS PROJECT
Nine Mile Metals Ltd. has completed the phase 1 drill program on the company's flagship Nine Mile Brook VMS (volcanogenic massive sulphide) project on southern target zones No. 1 and No. 2. Seven diamond drill holes were completed, including five target drill holes and two borehole EM (electromagnetic) drill holes.
At target zone No. 1, five drill holes were collared to drill the sample area, collect samples for assay and mineralogy, and for analysis by EarthEX Geophysical Solutions Inc. for physical properties. The results of the EarthEx study will assist in defining the survey parameters for upcoming ground and borehole electro-magnetic surveys.
The company is very pleased to report that it has hit visual mineralization on all five VMS target DDH drill holes, with intersections ranging from nine metres to over 14 metres of high-grade VMS mineralization (copper, lead and zinc). In all five VMS target drill holes, abundant pyrite, chalcopyrite, sphalerite and galena were observed in drill core locally mixed with sediments. The style of mineralization varied from banded, massive to disseminated, the latter typical for sphalerite. This style of mineralization is typical of the VMS occurrences in the Bathurst mining camp (BMC).
Included in the drill program were two exploratory holes, both 200 metres in depth. They were drilled to facilitate a bore hole electro-magnetic geophysical survey (BHEM) designed to test the Willet Horizon, which hosts the VMS mineralization at the VMS (target zone No. 1) and 250 metres to the north at target zone No. 2. The BHEM survey will be completed shortly and will detect any subsurface VMS mineralization associated with the horizon, outline the size and shape of the previously defined VMS intersections, and identify additional mineralization along strike and at depth.
The next steps are to log, photograph, measure and cut the core for assay submission to the ALS Global facility in Moncton, N.B. Prior to submission to the lab, the company will use X-ray fluorescence (XRF) on the core samples to obtain an indication of the grades expected.
XRF is a non-destructive analytical technique used to determine the elemental composition of materials such as drill core. XRF analyzers determine the chemistry of a sample by measuring the fluorescent (or secondary) X-ray emitted from a sample when it is excited by a primary X-ray source. It should be noted that the results only provide an indication of the amount of Cu, Pb and Zn present. Assaying of the core samples is still required to accurately determine the amount of base metal and precious metal mineralization (copper-lead-zinc-silver and gold).
"We couldn't be more pleased to report we have just completed phase 1 of our drill program on our flagship Nine Mile Brook VMS project. Having hit wide intersections of mineralization with high concentrations in copper, lead and zinc, we look forward to the borehole EM survey so we can get a definition of the subsurface mineralized body and other potential VMS clusters beneath the surface. We are very confident these assays will return grades very similar to our previously reported samples in our press release dated Jan 26, 2022 (excerpt featured below)," stated Gary Lohman, BSc, PGeo, who acts as the company's qualified person and is a member of Nine Mile's technical advisory committee.
In addition to the high-grade lead-zinc, the silver, gold and copper assay results were exceptional. The silver ranged from 1.54 ounces/ton to 14.47 ounces/ton.
"We look forward to the next stage of our exploration program. We have filed for the permits for the (2) downhole EM surveys in this phase 1 drill program and we are also awaiting EarthEX Geophysical Solution's proprietary 3-D AI [artificial intelligence] analysis modelling for the entire Nine Mile Brook project claims with target prioritization for our phase 2 drill program. The visual mineralization in drill core is exceptional and we look forward to announcing the ALS Global certified assays shortly," stated Patrick J. Cruickshank, MBA, director and member of the technical advisory committee.
The disclosure of technical information in this news release has been prepared in accordance with Canadian regulatory requirements as set out in National Instrument 43-101 -- Standards of Disclosure for Mineral Projects (NI 43-101), and reviewed and approved by Mr. Lohman, BSc, PGeo, who acts as the company's qualified person, is a member of the Nine Mile's technical advisory committee and is not independent of the company.
About Nine Mile Metals Ltd.
Nine Mile Metals is a Canadian public mineral exploration company focused on VMS (Cu, Pb, Zn, Ag and Au) exploration in the world-famous Bathurst mining camp, New Brunswick, Canada. The company's primary business objective is to explore its three VMS projects: Nine Mile Brook VMS project; California Lake VMS project; and the Canoe Landing Lake (east-west) VMS project. The company is focused on exploration of minerals for technology (MFT), positioning for the boom in EV (electric vehicles) and green technologies requiring copper, silver, lead and zinc, with a hedge of gold.
We seek Safe Harbor.
© 2022 Canjex Publishing Ltd. All rights reserved.