RE:RE:RE:RE:Bottom line with Crux43-101 reports are done after the drilling programme, not during. NFG is still a long ways from delineating the Keates main zone or any other gold zone on the Queensway property. When a deposit is drilled off they will due a 43-101. That will probably be 2023 or beyond.
"reporting issues"? Do you mean assay lab backlogs or a due dilegence test which came up with nothing.
"selective reporting"? Many holes are sitting at the assay labs, including 2021 holes. Your Crux gods live in a perfect world far removed from reality.
They don't give a **** about Crux. Tomorrow, NFG will follow gold wherever gold goes.