RE:RE:RE:Road?
Drilling on the JBP Fault runs almost parallel to the logging road. No problem moving drills around on flat beds. The road was mostly pushed through with a bulldozer. The bridges I've seen in similar situation are 'bailey bridges' , which can be moved to a new location as needed and are not a major expense.