RE:RE:RE:Down 6 days in a rowI review the available information on the HSP Nickel-Copper PGE Project.
My opinion is drill results will confirmed Ni average at around 0.4% + 0.2%Cu +Pt.
It is lower than Voisey Bay at average 0.9%Ni. But since Voisey Bay Ni price has triple.
At 0.4%Ni + 0.2%Cu the project is economical in open pit.
Development cost can be recovered in one year of operation.if the volume is there.
More drilling is required to put a value on the deposit.
Up to now all opinions are speculation.
It is better than Manitou Gold (MTU) at 0.22% Ni eq