RE:VWAP last 30 days…39,853,451 shares @ $0.7047 cents ⚾️📈 What we think about those two presentations ?
The June presentation include a wrong information ''• Avg. Grade: Ni: 0.42% - Cu: 0.56%''
It was too early to claim and average grade for Ni and Cu.
The September presentation are showing the drill cores and massive semi-massive sulphide
As per the drill sections, cores are having mineralisation inside 20% to 95% of the core length
No Ni Cu grades yet
The June 2022 presentation is claiming :
Drill ready project in Quebec
• Primary metals: Nickel and Copper
• Magmatic sulphide hosted in
anorthosite and gabbro
• 6 mineralized EM targets at surface
• Range from 200m X 200m up to
700m X 540m
• Avg. Grade: Ni: 0.42% - Cu: 0.56%
• Exploration stage
The September 2022 presentation is claiming ':
Maiden Drill program completed
• Primary metals: Nickel and Copper
• Magmatic sulphide hosted in
anorthosite and gabbro
• 6 mineralized EM targets at surface
• EM Targets range from 200m X 200m
up to 700m X 540m*
• Exploration stage
**EM target size and deposit size are not the same and should not be equated