Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Silver North Resources Ltd. V.SNAG

Alternate Symbol(s):  TARSF

Silver North Resources Ltd. is a Canada-based company, which is focused on silver discoveries in the Keno Hill Silver District of the Yukon, including Silver North’s Haldane Project, where high grade silver has been identified in drilling at two target areas. It holds the Tim silver property in the southern Yukon, where partner-funded exploration has identified high-grade silver mineralization just 19 kilometers (km) from the Silvertip mine. Haldane property is an under-explored high-grade silver property. The 8,164-hectare property hosts structurally controlled silver veins within the traditional territory of the First Nation of Na-Cho Nyak Dun. Its Tim property consists of 72 mineral claims located 72 km west of Watson Lake, Yukon and 12 km northeast of the Silvertip deposit. Its Tim property claims cover an area of anomalous silver-lead-zinc in soil geochemistry. Its other projects include Klondike Project, Ashby, White River, MOR Property, Goz Creek, Pucarana and Mexico Royalties.


TSXV:SNAG - Post by User

Post by zack50on Jan 11, 2023 4:39pm
462 Views
Post# 35216814

ANZ receives drilling permits for Twin Canyon Gold Project..

ANZ receives drilling permits for Twin Canyon Gold Project..

Drilling at the Twin Canyon Project in southwest Colorado has been approved by the United States Forest Service and the Colorado Division of Reclamation, Mining and Safety, subject to certain standard operating conditions and placement of a $18,104 bond. Alianza has now received all necessary permits to conduct a proposed 13 hole drill program from 8 drill pads, totalling approximately 3,950 metres of drilling.

“Mineralization at Twin Canyon is centred on the Charlene Mine, where ’several thousand‘ ounces of gold were reportedly mined from bleached and altered sandstones in the 1980s,” stated Rob Duncan, M.Sc., Vice President, Exploration for Alianza. “Alianza’s work has identified the same gold bearing sandstones over a distance of 3000 metres of strike length in the vicinity of the Charlene Mine, greatly expanding the exploration potential of this district. The proposed drill program will test this prospective stratigraphy with the goal of demonstrating a large scale gold mineralizing system at Twin Canyon.”

Exploration at Twin Canyon has targeted disseminated native gold mineralization associated with a bleached sandstone spotted with bitumen, with small amounts of limonite after pyrite. Optical and microprobe work carried out on mineralized samples indicate a direct gold – bitumen association raising the novel possibility that the mineralizing process at Twin Canyon is driven by those associated with petroleum basin development. A small underground gold mine (the Charlene Mine) operated at Twin Canyon dating back to the mid-1950s. Historic sampling of the underground workings has returned grab samples ranging from 0.1 to 15.77 g/t gold. Twenty-eight historic channel samples 1.5 to 10 metres in length were anomalous in gold, eight of which exceeded 2 g/t gold (including a highlight of 8.1 g/t gold over 3 metres). Recent work, including mapping and soil and rock geochemical sampling expanded the prospective strike length of the prospective gold bearing sandstone unit to over 3000 metres, with regional potential for expansion of the target laterally as well as to deeper stratigraphic levels.

Alianza is seeking a partner to fund the next phase of work and will be entering into discussions with prospective partners through the first quarter of 2023.

<< Previous
Bullboard Posts
Next >>