RE:question?I think it was a condition of their environmental permitting. Also, Todd demanded it, as well, as a condition of recent loan/share conversion, if I remember correctly. It is "geotechnical" drilling, not trying to expand or confirm the ore body. Something to do with the proposed engineering.