RE:RE:RE:RE:RE:RE:RE:RE:RE:Where is the investor presentation?Sure. Their forcasted annualized production was set at 1297 boe/day. Drill program was delayed 2 months into august. Shut ins required on fields being perffed; in this case the Cuthbert field. Linear regression of median wells with 17 API over the projected 10 well program translates to 1346 boe/d from Cuthbert drills alone. Same basic grade 12 math applied to Pekisco formation in medium viscosity yields 1285 boe/d from proposed 8 wells. Add another 20 heavy wells over the winter. Agreed IP7 is useless, Samuel stated as much on two podcasts; it is flush production and in bank oil. IP30,60 and 90 are required.