The FN question is.....why is nat gas production at end of2024 only suppose to be 71 mmcf's/d after 2 more casandra wells are drilled? That's the exit rate they are giving on on the PR. This ontop of the flop the second existing well appears to be with it's 11 mmcf/d
production and heavy drawn down. And the go on top talk about an apparent fix by peferating additoinal pay zones If their were all these bi-passed pay zones why weren't they perferated in the first place.
Something tells me it isn't going to be some easy fix.