Over due reports ?If I recall correctly at least two studies were due before the end of 2023 :
-the reuse of the old Wabush pellet plant in Sept-Iles
-developing the Kammi deposit left over from Alderon
I want to buy more CIA, but the silence concerning these studies makes me nervous.
From what I know the old PP is a pile of junk and the Kammi deposit comes with Manganese which is not easy to remove and is regarded as a contaminant ( see the first 43-101 from Alderon ).
So far CIA has been a model of doing things right. Management is first class and the project has a bright future so I do not wish to be negative, but I do want to see these studies out in the open before putting more $ on the table.