Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Greenfire Resources Ord Shs T.GFR

Alternate Symbol(s):  GFR | GFRWF

Greenfire Resources Ltd is an oil sands producer focused on the sustainable development of its Tier-1 assets in Western Canada. The Company’s operations include Thermal Oil Operations, Tier-1 Oil Sands Reservoir, Hangingstone Facilities, Pipeline Infrastructure, and Cooperation with Trafigura. The Company’s operations are based in the Canadian oil sands where it leverages in situ thermal oil development to access Western Canada’s energy resources. The Company’s resource base is concentrated in the Athabasca region of Northern Alberta and comprises two of the five Tier-1 steam-assisted gravity drainage (SAGD) assets in the province, providing access to a reservoir. It operates two SAGD oil production facilities within the same Tier-1 reservoir at Hangingstone, situated 50 kilometers (km) south of Fort McMurray in Northern Alberta. Hangingstone Expansion is located 55 km south of Fort McMurray, Alberta. The Demo Asset is located 50 km south of Fort McMurray, Alberta.


TSX:GFR - Post by User

Post by ztransforms173on Mar 21, 2024 8:48am
103 Views
Post# 35944527

CC: GFR Has MASSIVE BOP ADVANTAGE Over Other SAGD Operators

CC: GFR Has MASSIVE BOP ADVANTAGE Over Other SAGD OperatorsDRILLING RE-FILL WELLS:

- COST:   $ 3.0 to 3.5 million per refill-well

- TWO WEEKS to DRILL and COMPLETE

BOP ADVANTAGE:

- ONLY TWO WEEKS AFTER DRILLING and COMPLETION TO COME ONLINE and PRODUCE BITUMEN

- other SAGD OPERATORS REQUIRE 6 to 9 MONTHS AFTER DRILLING and COMPLETION to BEGIN BOP PRODUCTION for the MASSIVE STEAM INJECTION to MOBILIZE the BITUMEN

- this is the ADVANTAGE of the TIER 1 RESERVOIRS that HAVE VERY LITTLE PRESSURE ESCAPE ZONES on the TOP and BOTTOM of the RESERVOIRS like MOST of the SAGD RESERVOIRS in Alberta

- there are REPUTED to be ONLY 5 TIER 1 RESERVOIRS in Alberta and GFR has TWO OF THEM {Hangingstone DEMO + Hangingstone EXPANSION}

z173


<< Previous
Bullboard Posts
Next >>