RE:RE:RE:RE:RE:RE:RE:RE:Straight From The Horse's MouthThe latest cavern design by Gensource is a copy of the Moab design and takes about a year to drill (from Gensource document). The person who directed the Western drilling, was the manager of Moab when the Moab installation was put in place. This Moab installation really has produced very little product. Western shows little progress.
The patented Beechy design could be drilled in a couple weeks. And it would work if done right. Beechy would be happy to work with gensource, but of course, Beechy would expect some consideration for the use of those designs and patents.
A pitty that this option was presented 10 years ago. This mine could have been producing all this time.
My best wishes to Gensource, either way, so long as they respect our IP.