TCF.C The well flowed continuously from the morning of July 9th and by July 10th afternoon the flow rate was 0.70 MMcf/d with a WHP of 140 psi; July 12th flow rate was 1.2 MMcf/d with a WHP of 156 psi; July 14th flow rate was 1.88 MMcf/d with a WHP of 312 psi; last data point at 4:30 pm July 15th flow rate was 2.88 MMcf/d with a WHP of 318 psi.
South Akcakoca-2 well will be continued to be monitored until it reaches a stable rate. The production characteristics indicated that perforating the new zones blew the water out of the well, but also indicate that the reservoirs that were water blocked are cleaning up and producing gas.