Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Premium Resources Ltd V.PREM

Alternate Symbol(s):  PNRLF

Premium Resources Ltd, formerly Premium Nickel Resources Ltd, is a mineral exploration and development company. The Company is focused on redeveloping its past-producing nickel, copper, and cobalt sulphide mines in the Republic of Botswana. Its Selebi Mine Project consists of a single 10-year mining license covering an area of 11,504 hectares located south of the town of Selebi Phikwe. The Selkirk Project is situated 28 kilometers (km) south-east of the city of Francistown, and 75 km north of the Selebi Mines. The Project consists of a mining license covering an area of 1,457 hectares (ha) and four prospecting licenses covering 12,670 ha. The Maniitsoq Project is a centered approximately 125 km north of Nuuk, the capital of Greenland, and consists of three contiguous mineral exploration licenses situated just east of the towns of Maniitsoq and Napasoq. The Post Creek and Halcyon projects are located 35 km northeast of Sudbury in Norman, Parkin, Alymer and Rathburn townships.


TSXV:PREM - Post by User

Post by knoxton Oct 24, 2024 8:12am
38 Views
Post# 36279837

Excellent News ! New Mineralization

Excellent News ! New Mineralization
Premium Nickel Expands Selebi North Deposit with Discoveries of New Mineralization Beyond Initial Mineral Resource Estimate
Newsfile Corp - Oct 24, 2024 9:00 AM ADT

Toronto, Ontario--(Newsfile Corp. - October 24, 2024) - Premium Nickel Resources Ltd. (TSXV: PNRL) ("PNRL" or the "Company") announces deposit expansion and high-grade assay results for a further three holes and assays pending for one hole all drilled outside of the initial Mineral Resource Estimate ("MRE") wireframe at its past-producing nickel-copper-cobalt sulphide ("Ni-Cu-Co") Selebi North underground ("SNUG") mine in Botswana. Drill core photos for all highlighted holes released to date, including the holes reported herein, are accessible by Clicking Here and can also be found on the Company's website at www.premiumnickel.com.

Assay highlights include:

  • SNUG-24-096-W1: South Limb - deepest intersection drilled to date and located 100 meters down plunge of SNUG-24-089 and outside the National Instrument 43-101 ("NI 43-101") Inferred Resource
      • 12.90 metres of 4.12% CuEq or 2.00% NiEq (1.54% Cu, 0.95% Ni, 0.05% Co)
    • and 24.50 metres of 2.17% CuEq or 1.05% NiEq (0.72% Cu, 0.67% Ni, 0.04% Co)
       
  • SNUG-24-102 extension: N2 outside the NI 43-101 Inferred Resource
      • 17.00 metres of 2.02% CuEq or 0.98% NiEq (0.67% Cu, 0.64% Ni, 0.03% Co)
    • incl. 8.10 metres of 2.42% CuEq or 1.17% NiEq (0.78% Cu, 0.82% Ni, 0.04% Co)
       
  • SNUG-24-114: South Limb infill drilling targeting re-classification of Inferred to Indicated Resources, and N2 outside the NI 43-101 Inferred Resource
      • 21.30 metres of 4.14% CuEq or 2.01% NiEq (1.36% Cu, 1.34% Ni, 0.07% Co)
    • incl. 13.80 metres of 2.42% CuEq or 4.40% NiEq (1.42% Cu, 1.48% Ni, 0.07% Co)
       
  • SNUG-24-144: Intersected N2 mineralization outside the NI 43-101 Inferred Resource. Assays pending.

Keith Morrison, CEO of PNRL, commented: "The ongoing drilling at Selebi North targets mineralization both inside and outside the deposit geometry defined in the NI 43-101 MRE technical report effective June 30, 2024. The results of these four holes are the first reporting of results that are significantly outside the MRE deposit boundaries. SNUG-24-096-W1 successfully intercepted massive sulphide mineralization 100 metres below the lower extents of the current MRE volume. This reinforces the open down plunge nature of the Selebi North deposit, and the effectiveness of borehole electromagnetics to image massive sulphide mineralization. Substantial exploration potential remains at Selebi, and we are optimistic these results will compliment a future updated economic technical report."

Assay results are provided below in Table 1 for SNUG-24-096-W1, SNUG-24-102 and SNUG-24-114, hole collar details are provided in Table 2. Assay results have been previously reported for the upper portion of SNUG-24-102 (see news release dated June 26, 2024). Upon the discovery of a second mineralized interval in drill hole SNUG-24-114 a decision was made to extend the previously drilled hole SNUG-24-102 and the assays reported herein are from the extension of that hole.

True thickness of mineralization was estimated using the wireframe as part of the MRE (see news release August 8, 2024). For intervals outside the MRE in the N2 Limb, true thickness is not yet determined, and more work is required to confirm the geometry of the new mineralization. Figures 1 and 2 show the location of the holes relative to the MRE and underground infrastructure.


<< Previous
Bullboard Posts
Next >>