RE:TCF.C News article Now not X but Facebook, what is the result after the sensational snubbing operation? We are waiting for the flow rates of the boreholes and no self-praise.
We are still at a standstill with the snubbing operation. See below:
Akakoca-3 well: Increasing production from ~2.0 MMcf/d to ~2.6 MMcf/d
West Akakoca-1 well: post-nitrogen stimulation.
Guluc-2 well: installation of the velocity string is underway and results are expected shortly.