Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Tocvan Ventures Corp C.TOC

Alternate Symbol(s):  TCVNF

Tocvan Ventures Corp. is a Canada-based early-stage natural resource company. The Company is engaged in the acquisition, exploration, and, if warranted, development of mineral properties. The Company has two projects, the flagship Pilar Gold Project and the El Picacho Gold Project in the Sonora State of Mexico. The Company’s flagship project Pilar Gold is located approximately 130 kilometers (km) southeast of the capital of Sonora, Hermosillo. The project is fully road accessible and takes approximately two hours to drive to from Hermosillo to the town of Suaqui Grande on paved highway. From Suaqui Grande to the project site is approximately 30 mins on gravel road. The El Picacho Gold-Silver property is interpreted as an orogenic gold system within the regional Caborca Orogenic Gold Belt. The project is 140 km north of Hermosillo and totals 24 square kilometers (km2).


CSE:TOC - Post by User

Post by lifegoesonon Jul 29, 2021 9:05am
161 Views
Post# 33620114

News - 39.7 METERS OF 0.96 G/T AU, and new target area.

News - 39.7 METERS OF 0.96 G/T AU, and new target area.Another excellent set of results from TOC, I am very encouraged by these results, JES-21-50 is a 50-m stepout to the main zone, thus instantly increasing the resource for Pilar, but more importantly it is on trend. Even the Triple Vein zone hit gold, not much, but how often do you see a company hit gold on virtually every hole, I mean every hole. Once they look at the geology, I am sure the next phase of drilling will show them exactly where commercial gold is found on the Triple Vein Zone and how the entire system connects. You could be seeing the early stages of a significant open pit mining operation that could bring excellent value to shareholders.

But the really good part is they are not only preparing plans for the next steps at Pilar, which will include continued expansion drilling and exploration drilling at 4-Trench and TVZ, but this, and this is the big part in my opinion, trenching will be followed by preliminary bulk sampling through key sections of the Main zone.This will get us closer and closer to a mining operation. And not  only this, it will attract the bigger players with money who will want a piece of the pie.

No one is getting my shares yet.

Mr. Derek Wood reports

TOCVAN DRILLS 39.7 METERS OF 0.96 G/T AU INCLUDING 12.2 METERS OF 3 G/T AU IN MAIN ZONE STEP-OUT ALSO HITS AT TRIPLE VEIN ZONE 400 METERS TO THE EAST, OPENS UP NEW TARGET AREA

Tocvan Ventures Corp. has released final drill results from its phase 2 drill program at the Pilar gold-silver project in Sonora, Mexico. A phase 2 drill program was completed in June with over 3,500 metres of reverse circulation (RC) drilling in 20 drill holes. Final results are included in this release, highlighted by drill hole JES-21-50, which returned 39.7 metres at 0.96 gram per tonne gold in a 50-metre stepout to the Main zone on trend with drill hole JES-21-47, which intersected 47.3 metres at 0.75 g/t Au. In addition, the first reconnaissance drill hole at the Triple Vein zone (TVZ) was completed 400 metres to the east (JES-21-56) and was successful in intersecting mineralization at depth, returning 1.5 metres at 0.6 g/t Au and 139 g/t silver.

Tocvan is now preparing plans for the next steps at Pilar, which will include continued expansion drilling, exploration drilling at 4-Trench and TVZ and trenching followed by preliminary bulk sampling through key sections of the Main zone.

Drill result highlights

JES-21-50:

  • 39.7 metres at 0.96 g/t Au and two g/t Ag from 39.7 to 79.3 metres:
    • Including 12.2 metres at 3.0 g/t Au and six g/t Ag from 39.7 to 51.9 metres;
    • Including 1.5 metres at 14.6 g/t Au and 11 g/t Ag from 48.8 to 50.3 metres.

JES-21-56:

  • 1.5 metres at 0.57 g/t Au and 139 g/t Ag from 216.6 to 218.1 metres.

"During our phase 1 and 2 drill programs we have been extremely successful in steadily increasing the known size of our Main zone," commented vice-president, exploration, Brodie Sutherland. "JES-21-50 clearly shows the trend remains open to the southeast, and we are excited to drill test this further later in the year. Beyond that we are seeing great indications that the Triple Vein zone is developing into a new area for drill targeting. Surface sampling, mapping and geophysics are all aligned and with JES-21-56 intersecting mineralization at depth we are excited to see how this new trend can develop."

Results discussion

JES-21-50

The hole was planned to test the continuation of the Main zone to the southeast, as a 50 m stepout to JES-21-47, which intersected 47.7 m of 0.75 g/t Au. Drilling in JES-21-50 intersected a broad zone of mineralization in altered andesites over 39.7 metres of 0.96 g/t Au, including a vein zone grading 1.5 metres of 14.6 g/t Au and 11 g/t Ag. The Main zone continues to extend to the southeast and remains open as an expansion target for the next phase of drilling.

JES-21-56

The hole was planned to test the eastern most extent of the Triple Vein zone where surface sampling recovered 4.5 g/t Au and 735 g/t Ag from a rock chip along an artisanal working. Drilling intersected a silver-rich zone grading 0.57 g/t Au and 139 g/t Ag, 216.6 metres downhole. Hitting mineralization at depth now opens this target area up for further exploration drilling along the 400-metre trend.

 Hole ID From To Width* Au Ag AuEq (m) (m) (m) (g/t) (g/t) (g/t) JES-21-50 39.65 79.3 39.65 0.96 2 0.99 including 39.65 51.85 12.20 3.04 6 3.10 including 48.8 50.33 1.53 14.55 11 14.67 JES-21-51 no significant mineralization JES-21-56 216.55 218.07 1.52 0.57 139 2.04 * Insufficient drilling has been undertaken to determine true widths. All widths reported are core length. Gold equivalent is calculated using metal prices of $1,700 (U.S.) per ounce gold and $18 (U.S.) per ounce silver. 

About the Pilar Property

The Pilar gold-silver property is interpreted as a structurally controlled low-sulphidation epithermal project hosted in andesite rocks.

Three zones of mineralization have been identified in the northwest part of the property from historic surface work and drilling and are referred to as the Main zone, North Hill and 4-Trench. Structural features and zones of mineralization within the structures follow an overall northwest-southeast trend of mineralization. Over 19,200 m of drilling have been completed to date. Significant results are highlighted below.

  • 020 phase 1 RC drilling highlights include (all lengths are drilled thicknesses):
    • 94.6 m at 1.6 g/t Au, including 9.2 m at 10.8 g/t Au and 38 g/t Ag;
    • 41.2 m at 1.1 g/t Au, including 3.1 m at 6.0 g/t Au and 12 g/t Ag;
    • 24.4 m at 2.5 g/t Au and 73 g/t Ag, including 1.5 m at 33.4 g/t Au and 1,090 g/t Ag.
  • 17,700 m of historic core and RC drilling. Highlights include:
    • 61.0 m at 0.8 g/t Au;
    • 16.5 m at 53.5 g/t Au and 53 g/t Ag;
    • 13.0 m at 9.6 g/t Au;
    • 9.0 m at 10.2 g/t Au and 46 g/t Ag.

Soil and rock sampling results from undrilled areas indicate mineralization extends toward the southeast from the Main zone and 4-Trench zone. Recent surface exploration has defined three new target areas: Triple vein zone, SE vein zone and 4-Trench extension.

Brodie A. Sutherland, PGeo, vice-president of exploration for Tocvan Ventures and a qualified person (QP) as defined by Canadian National Instrument 43-101, has reviewed and approved the technical information contained in this release.

Quality assurance/quality control

RC chips were shipped for sample preparation to ALS Ltd. in Hermosillo, Sonora, Mexico, and for analysis at the ALS laboratory in North Vancouver. The ALS Hermosillo and North Vancouver facilities are International Organization for Standardization 9001 and International Organization for Standardization/International Electrotechnical Commission 17025 certified. Gold was analyzed using 50-gram nominal weight fire assay with atomic absorption spectroscopy finish. Overlimits for gold (over 10 g/t) were analyzed using fire assay with a gravimetric finish. Silver and other elements were analyzed using a four-acid digestion with an ICP (inductively coupled plasma) finish. Overlimit analyses for silver (over 100 g/t) were reassayed using an ore-grade four-acid digestion with ICP-AES (inductively coupled plasma atomic emission spectroscopy) finish. Control samples comprising certified reference samples and blank samples were systematically inserted into the sample stream and analyzed as part of the company's robust quality assurance/quality control protocol.

About Tocvan Ventures Corp.

Tocvan is a well-structured exploration development company. Tocvan was created in order to take advantage of the prolonged downturn the junior mining exploration sector, by identifying and negotiating interest in opportunities where management feels it can build upon previous success. Tocvan currently has approximately 28 million shares outstanding and is earning into two exciting opportunities. The Pilar gold-silver project in Sonora, Mexico, and the Rogers Creek copper project in Southern British Columbia, management feels both projects represent tremendous opportunity to create shareholder value.


<< Previous
Bullboard Posts
Next >>