Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Horizonte Minerals Ord Shs T.HZM

Alternate Symbol(s):  HZMMF

Horizonte Minerals Plc is a United Kingdom-based nickel company. The Company is focused on developing two tier one projects in Para State, Brazil. Its projects include Araguaia Nickel Project and the Vermelho Nickel-Cobalt Project. Its 100% owned Araguaia Nickel Project is located south of the Carajas Mining District in Para State, north Brazil. The project has two principal mining centers: Araguaia Nickel South (ANS) and Araguaia Nickel North (ANN). ANS hosts seven deposits: Pequizeiro, Baiao, Pequizeiro West, Jacutinga, Vila Oito East, Vila Oito West, and Vila Oito, while ANN hosts the Vale do Sonhos deposit. Its 100% owned Vermelho Nickel-Cobalt project is located in the Carajas Mining District in Para State, northeast Brazil. The Vermelho nickel deposits consist of two hills named V1 and V2. The Company’s Vermelho Project is expected to produce 25,000 tons of nickel and 1,250 tons of cobalt to supply the electric vehicle (EV) battery market.


TSX:HZM - Post by User

Post by Oldschool2022on Dec 27, 2023 8:57pm
175 Views
Post# 35802071

The Nickel King! $8.9 Billion cash flow!

The Nickel King! $8.9 Billion cash flow!

Company Overview

Horizonte has two advanced 100% owned nickel projects located close to the Carajs mining district in northern Brazil.

Araguaia Ferro-Nickel Project (ANP)

ANP is an advanced nickel project being developed by Horizonte as the next ferronickel (FeNi) operation in Brazil. Araguaia has the following key characteristics:

  • 100% owned by Horizonte
  • Located south of the Carajs Mining district in northern Brazil, with good access to infrastructure Feasibility Study (IFS') issued Q4 2018, has demonstrated:
  • Robust economics based on a 28-year life of mine ('LOM") producing ~14,000 tonnes per annum (TA) nickel in FeNi from a single line Rotary Kiln Electric Furnace ('RKEF")
  • ANP is expected to generate over US$1.6 billion in free cash flow over LOM using a nickel price of US$14,000 per tonne ('/t'
  • Net Present Value' (NPV,) of US$401M and Internal Rate of Return (IRR) of 20.1% using the base case of nickel price of US$14,000/t, increasing to US$740M and 28.1% using the consensus nickel price of US$16,800/t
  • High-grade ore with an average nickel grade of 1.89% for the first 10 years of production
  • C1 cost of US$8,193/t Ni positioning Araguaia in the lower quartile of Nickel Laterite cost curve, C1 cost of US$6,784/t Ni years 1-10
  • Proven and Probable Mineral Reserve Estimate of 27.5 Mt grading 1.69% Ni

Vermelho Nickel-Cobalt Project (VNP)

The VNP was acquired from Vale in late 2017. It is 100% owned by Horizonte and is located in the eastern part of the Carajas Mining district and approximately 200 kilometres north-west of the ANP. A Pre-Feasibility study (PFS*) was released in October 2019 which confirms VNP as a low-cost, long-life nickel sulphate project.

The Study confirms VNP as a large, high-grade resource, with a long mine life and low-cost source of nickel sulphate for the battery industry

• The compelling economic and technical results from the study support further development

ortne orolectrowaros atulreasiolatU©vI

A 38-year mine life estimated to generate total cash flows after taxation of US$7.3billion?;

An estimated Base Case post-tax NPV, of US$1.7 billion? and IRR of 26%

At full production capacity, the Project is expected to produce an average of 25,000 tonnes of nickel and 1,250 tonnes of cobalt per annum utilising the High-Pressure Acid Leach process

• The base case PFS economics assumes a flat nickel price of US$16,400/t for the 38-year mine life
C1 (Brook Hunt) cash cost of US$8,029/t Ni (US$3.64/Ib Ni), defines Vermelho as a low-cost producer VNP is set to deliver significant socio-economic benefits for communities in the Par state, including over 1,800 direct jobs in the construction phase, and over 600 jobs during operation, as well as additional economic and social development programs.

<< Previous
Bullboard Posts
Next >>