Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Bullboard - Stock Discussion Forum Loncor Gold Inc T.LN

Alternate Symbol(s):  LONCF

Loncor Gold Inc. is a Canadian gold exploration company. The Company is focused on projects within an approximately 480 square kilometers (km2) area on the Ngayu Greenstone Belt in the Northeast of The Democratic Republic of the Congo (the DRC). The area is located over 220 kilometers southwest of the Kibali gold mine, which is operated by Barrick Gold (Congo) SARL. It owns or controls a... see more

TSX:LN - Post Discussion

Loncor Gold Inc > Two ore Higher Grade infill holes within Adumbi Pit
View:
Post by nozzpack on Oct 12, 2021 9:53am

Two ore Higher Grade infill holes within Adumbi Pit

Should nudge us very close to 5 m ounces..

 

ORIGINAL: Loncor Reports 4.11 g/t Gold over 19.10 Metres as part of the Infill Drill Program within the Proposed Adumbi Pit Shell

 

2021-10-12 09:29 ET - News Release

 

  • Results from hole LADD024 reported 17.78 metres grading 3.20 g/t gold and 11.50 metres grading 3.47 g/t gold (including 3.55 metres grading 7.79 g/t gold);
  • Hole LADD025 includes 19.10 metres grading 4.11 g/t gold (including 8.75 metres grading 5.40 g/t gold), 14.60 metres grading 2.11 g/t gold

TORONTO, Oct. 12, 2021 (GLOBE NEWSWIRE) -- Loncor Gold Inc. ("Loncor" or the "Company") (TSX: "LN"; OTCQX: "LONCF"; FSE: "LO51") is pleased to announce further significant assay results from its drilling program within its 84.68%-owned Imbo Project in the eastern part of the Ngayu greenstone belt in the Democratic Republic of the Congo. Borehole LADD025 drilled at its flagship Adumbi deposit intersected 19.10 metres grading 4.11 grammes per tonne (g/t) gold (including 8.75 metres grading 5.40 g/t Au) and 14.60 metres grading 2.11 g/t gold, while borehole LADD024 intersected 17.78 metres grading 3.20 g/t gold and 11.50 metres grading 3.47 g/t gold (including 3.55 metres grading 7.79 g/t gold (see Figures 1 and 2 below).

Significant mineralized sections for boreholes LADD024 and LADD025 are summarised in the table below:

Borehole Number From (m) To (m) Intersected
Width (m)
Grade (g/t) Au
LADD024 216.15 227.65 11.50 3.47
LADD024 including 224.10 227.65 3.55 7.79
LADD024 235.97 253.75 17.78 3.20
         
LADD025 258.38 266.00 7.62 1.16
LADD025 279.50 286.35 6.85 3.44
LADD025 301.10 311.57 10.47 1.74
LADD025 321.60 336.20 14.60 2.11
LADD025 342.65 361.75 19.10 4.11
LADD025 including 349.00 357.75 8.75 5.40

Note:   It is estimated that the true widths of the mineralised sections for core holes LADD024 and LADD025 are, respectively, 77% and 78% of the intersected widths in the above table. Regular measurements of inclination and azimuth were taken at 30 metre intervals down the hole and all the core was orientated. All intercepted grades are uncut with maximum internal dilution equal to or less than 4 metres of intersected width.

Commenting on these latest drilling results, Loncor President Peter Cowley said: “These two core holes were all infill holes within the south eastern part of the open pit shell with the objective of converting a good part of the 3.15 million ounce inferred resource into a higher confidence category. Results received for this infill program demonstrate very good continuity of the mineralised, banded ironstone formation (“BIF”) package as well as an increase in thickness with depth (see Figure 2). The current drilling focus is to complete these infill holes within the shallower part of the pit and to outline potential underground resources at depth below the pit shell as well as complete the Adumbi Preliminary Economic Assessment (P.E.A) by December of this year.”

Quality Control and Quality Assurance re Adumbi Deposit Drill Results
Drill cores for assaying were taken at a maximum of one-metre intervals and were cut with a diamond saw, with one-half of the core placed in sealed bags by Company geologists and sent to the Company’s on-site sample preparation facility. The core samples were then crushed down to 80% passing minus 2 mm and split with one half of the sample up to 1.5 kg pulverized down to 90% passing 75 microns. Approximately 150 grams of the pulverized sample was then sent to the SGS Laboratory in Mwanza, Tanzania (independent of the Company). Gold analyses were carried out on 50g aliquots by fire assay. In addition, check assays were also carried out by the screen fire assay method to verify high-grade sample assays obtained initially by fire assay. As part of the Company’s QA/QC procedures, internationally recognized standards, blanks and duplicates were inserted into the sample batches prior to submitting to SGS Laboratory.

Qualified Person
Peter N. Cowley, who is President of Loncor and a "qualified person" as such term is defined in National Instrument 43-101, has reviewed and approved the technical information in this press release.

Technical Reports
Additional information with respect to the Company’s Imbo Project (which includes the Adumbi deposit) is contained in the technical report of Minecon Resources and Services Limited dated April 27, 2021 and entitled "Updated Resource Statement and Independent National Instrument 43-101 Technical Report, Imbo Project, Ituri Province, Democratic Republic of the Congo". A copy of the said report can be obtained from SEDAR at www.sedar.com and EDGAR at www.sec.gov.

Information with respect to the Company’s Makapela Project, and certain other properties of the Company in the Ngayu gold belt, is contained in the technical report of Venmyn Rand (Pty) Ltd dated May 29, 2012 and entitled "Updated National Instrument 43-101 Independent Technical Report on the Ngayu Gold Project, Orientale Province, Democratic Republic of the Congo". A copy of the said report can be obtained from SEDAR at www.sedar.com and EDGAR at www.sec.gov.

Comment by nozzpack on Oct 12, 2021 10:07am
Location of LA 24 and LA 25 were very  strategically placed to fill in gaps within the pit... https://www.globenewswire.com/NewsRoom/AttachmentNg/7fb1733d-f94d-48d4-ade5-2961506a4972 Only two holes left to report ..one within the pit and one deeper one below the pit. These two have been drilled, just awaiting assays to report. These two should be released soon, completing this phase of ...more  
Comment by mferguson71 on Oct 12, 2021 11:21am
2). The current drilling focus is to complete these infill holes within the shallower part of the pit and to outline potential underground resources at depth below the pit shell as well as complete the Adumbi Preliminary Economic Assessment (P.E.A) by December of this year. Don't get too ahead of yourself Nozz. You are very detailed in your research. I'm expecting the PEA for December if ...more  
Comment by nozzpack on Oct 12, 2021 11:24am
Sorry ..did not see that information .
The Market Update
{{currentVideo.title}} {{currentVideo.relativeTime}}
< Previous bulletin
Next bulletin >

At the Bell logo
A daily snapshot of everything
from market open to close.

{{currentVideo.companyName}}
{{currentVideo.intervieweeName}}{{currentVideo.intervieweeTitle}}
< Previous
Next >
Dealroom for high-potential pre-IPO opportunities