Post by
deepoil0808 on Jan 22, 2024 9:36am
Question on economic viability?
Question:
Why does PMET say this in yellow?
The CV5 mineral resource estimate (109.2 Mt at 1.42% Li2O and 160 ppm Ta2O5 inferred) is reported at a cut-off grade of 0.40% Li2O with effective date of June 25, 2023 (through drill hole CV23-190). Mineral resources are not mineral reserves as they do not have demonstrated economic viability.
Comment by
Reggie1 on Jan 23, 2024 4:04am
What are you looking for a blue star? Or a hug from Mom?
Comment by
GripnRip on Jan 22, 2024 10:45am
So it doesn't turn into Rubicon 2.0 Have to carpet drill Resources to see if qualify as Reserves. Reserves are higher level of confidence ie drilled on 50 foot spacing instead of 500 foot spacing. Is the ore body continious ?