Assay results have been received from 21 drill holes (IN039B, IN055, IN068, IN069, IN070, IN071, IN072, IN073, IN074, IN075, IN076, IN077, IN078, IN079, IN080, IN081, IN082, IN083, IN084, IN085 and IN086)
3 were barren 055,069, 086...~ 15%
stuff like this looks very uneconomic Drill Hole IN084:
The North Block was intersected at 411.5 m down the hole and comprises 0.9 m of pyritic mineralization grading 0.7 % Cu; 0.6 % Pb; 0.4 % Zn; 0.05 g/t Au and 11.4 g/t Ag.
Drill Hole IN081:
The North Block was intersected at 237.1 m down the hole and comprises 2.7 m grading 0.7 % Cu; 2.3 % Pb; 5.1 % Zn; 0.27 g/t Au and 77.4 g/t Ag.
Drill Hole IN078:
The North Block was intersected at 137.7 m down the hole and comprises 4.9 m grading 0.7 % Cu; 4.9 % Pb; 6.4 % Zn; 0.35 g/t Au and 100.8 g/t Ag, including 2.1 m grading 1.5 % Cu; 10.3 % Pb; 13.0 % Zn; 0.21 g/t Au and 194.5 g/t Ag.
Drill Hole IN079:
The North Block was intersected at 405.0 m down the hole and comprises 3.5 m grading 0.1 % Cu; 1.0 % Pb; 1.8 % Zn; 0.01 g/t Au and 2.6 g/t Ag.
Drill Hole IN080:
The South Block was intersected at 93.0 m down the hole and comprises 1.8 m grading 0.8 % Cu; 3.0 % Pb; 5.8 % Zn; 0.71 g/t Au and 91.4 g/t Ag.
Drill Hole IN075:
The North Block was intersected at 269.1 m down the hole and comprises 2.9 m grading 0.6 % Cu; 1.7 % Pb; 3.5 % Zn; 0.16 g/t Au and 25.6 g/t Ag.
Drill Hole IN039B:
The North Block was intersected at 364.9 m down the hole and comprises 5.0 m of pyritic mineralization grading 0.3 % Cu; 0.0 % Pb; 0.0 % Zn; 0.55 g/t Au and 45.8 g/t Ag.
10 duds out of 21....almost 50%
No wonder MRE underwhelmed
JMHO