Peranghi Grade Control Recovered Ounces Closely spaced Grade Control drilling to 10 m of depth have been removing over burden cover from the high grades zones identified in 2020.
Todate , 4 starter pits have had their mining benches configured.
Since June 2020, the grade control drilling has continued throughout the defined Peranggih shallow mineralization area.
As of March 2021, a total of 39,978m was drilled indicating over 220kt @ 0.89 g/t Au being internally delineated as the mineralized portion of the overburden ( Approx 6500 ounces ).
101,644t @ 0.74 g/t for 2,423 oz Au was mined from Peranggih since then.
The remainder has been used to rebuild stockpile levels
In parallel, RC drilling continues at Peranggih to expand the mineralization and the company continues to feed the mill with Peranggih materials from overburden cover containing economic grades of gold.
The key question is when will grade control drilling cease and open pit mining begins ?