SirRichard1987 on Jun 03, 2021 9:36am
TYVM. 6-1 Target Depth is 3,800m = 12.500' As today's update is merely 6-1's first section showing 134m = 440', and considering 6-2's three stacked intervals totaled 200m = 660', we're looking at a much deeper find.
Comment by
Fredo51545 on Jun 03, 2021 11:33am
The 12 1/4 casing could accomodate drillstem test equipment. Do we know if they have that capability on this rig?
Comment by
Fredo51545 on Jun 03, 2021 7:24pm
Thanks. I think a drill stem test is the right thing to do rather than set production casing and run an IP flow rate. Mabybe not for this well but when they drill on structures.
Comment by
Fredo51545 on Jun 03, 2021 7:25pm
Thanks. I think a drill stem test is the right thing to do rather than set production casing and run an IP flow rate. Mabybe not for this well but when they drill on structures.@