Post by
garland on Feb 05, 2021 1:41am
going forward
Upon a successful phase 2 drilling program, RTM will need to IP survey the entire Pacaud Fault system and the area to the east of it - basically the entire claim block. This play is wide open in all directions - especially deep where I think the survey is reliable to 400m - need to check on this. None the less going to be very interesting. Going to buy lots more on any weakness.