Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Victoria Completes Successful Exploration Program at High-Grade Olive Zone

VITFF

(via Thenewswire.ca)

Toronto, ON / TNW-ACCESSWIRE / November 4, 2014 / Victoria Gold Corp. (TSX.V-VIT) ("Victoria" or the "Company") is pleased to announce the results of the 2014 Phase 2 Olive Exploration program, adjacent to Victoria's Eagle Gold deposit, Yukon Canada.

Mr. John McConnell, President and CEO of Victoria commented; "The 2014 Olive Program has continued to produce, near surface, high-grade intersections along strike of our newly defined Olive Shear Zone. The success of the 2014 Phase 1 and Phase 2 Olive drilling programs has continued to increase our confidence that the Olive target represents a value-add target adjacent to Victoria's Eagle Gold Project. With the 2014 program now complete, management is moving forward with an Olive Mineral Resource Estimate with the expectation that ultimately, this satellite ore body will further enhance the economics and extend the mine life of our flagship Eagle Project."

Olive 2014 Program

Victoria's 2014 Phase 1 Olive Exploration program included 20 diamond drill holes, 3 of which were used solely for metallurgical testing. These 20 diamond drill holes from the Phase 1 program yielded highly encouraging results including 69.7 metres ("m") of 2.29 g/t gold, 96.1m of 1.22 g/t gold, 99.8m of 1.02 g/t gold, and 89.6m of 1.18 g/t gold including 42.5m of 2.36 g/t. (see News Releases dated June 24, July 28, and August 13, 2014).

Phase 2 Olive Zone exploration drilling was targeted as a series of step-out and exploration drillholes along strike (~850m) and across (~300m) the interpreted Olive shear zone defined in Phase 1 drilling. The Phase 2 Olive Zone drilling was primarily designed to test the bounds of the mineralized model developed by Victoria with drill spacing adequate to develop a defined Indicated Mineral Resource.

Phase 2 results included intercepts of 22.5m of 1.03 g/t gold; 20.1m of 1.10 g/t gold and 20.9m of 1.16 g/t gold.

Table 1: Selected Drill Results from 2014 Olive Phase 1 and Phase 2 Exploration Programs

Hole ID

From (m)

To (m)

Length (m)

Gold (g/t)

DG14-584C

60.7

130.4

69.7

2.29

including

65.5

114.9

49.4

2.91

including

85.3

114.9

29.6

3.90

DG14-586C

26.8

122.9

96.1

1.22

including

33.4

58.4

25

2.19

and

107.3

122.9

15.6

2.02

DG14-588C

46.2

146

99.8

1.02

including

46.2

77.7

31.5

2.19

DG14-590C

36.6

131.1

94.5

0.99

including

74.4

109.7

35.3

1.67

DG14-600C

3.0

92.6

89.6

1.18

including

42.2

84.7

42.5

2.36

DG14-602C

27.1

29.0

1.9

1.57

and

48.5

51.9

3.4

1.01

and

79.0

101.5

22.5

1.03

DG14-603C

34.6

47.4

12.8

1.00

and

100.1

102.5

2.3

1.57

and

141.5

142.5

1.0

1.98

DG14-604C

25.0

38.2

13.2

0.97

and

63.5

66.1

2.6

1.27

and

88.5

96.0

7.5

1.17

and

127.0

131.5

4.5

0.97

and

144.5

149.1

4.6

0.99

DG14-606C

6.5

26.5

20.1

1.10

and

43.4

48.8

5.4

0.99

and

58.5

64.0

5.5

1.15

and

88.0

91.3

3.3

0.96

and

106.2

111.5

5.3

0.80

and

177.0

178.0

1.0

1.50

and

204.5

208.8

4.3

1.05

DG14-608C

9.0

12.1

3.1

1.45

and

29.2

33.0

3.8

1.64

and

43.0

47.5

4.5

2.11

and

104.7

117.0

12.3

1.67

and

151.3

155.3

4.0

1.17

and

168.3

178.3

10.0

1.17

DG14-612C

84.1

97.5

13.4

0.96

Including

85.2

86.5

1.3

4.98

and

123.2

136.5

13.3

0.37

and

151.0

175.7

24.7

0.74

including

161.5

164.5

3.0

4.82

DG14-616C

55.6

67.9

12.3

0.73

Including

65.5

66.9

1.4

4.91

DG14-620C

95.5

116.0

20.5

0.91

Including

95.5

101.8

6.3

2.14

and Including

112.8

117.5

4.7

0.94

DG14-626C

94.5

122.0

27.5

0.93

Including

101.1

122.0

20.9

1.16

and

131.0

144.1

13.1

0.38

DG14-628C

13.9

45.0

31.1

1.06

Including

23.0

43.5

20.5

1.42

DG14-630C

57.0

104.0

47.0

0.60

Including

57.0

69.8

12.8

1.0

Note: Reported intersections are drilled intersections, as true widths have not yet been determined; but are estimated at approximately two-thirds downhole length.

An updated plan map and drill sections relating to the assay results presented above, as well as a complete summary table of all Phase 1 and Phase 2 Olive drilling results, is available on the Company's website s%20Computer%5CAppData%5CLocal%5CMicrosoft%5CWindows%5CTemporary%20Internet%20Files%5CContent.IE5%5CNKNHJZ07%5Cwww.vitgoldcorp.com'>www.vitgoldcorp.com

.
Tags:


Get the latest news and updates from Stockhouse on social media

Follow STOCKHOUSE Today