Shares Issued and Outstanding: 46,906,970
TSX-V: KDI
TORONTO, Feb. 16, 2016 /CNW/ - Kennady Diamonds Inc. ("Kennady
Diamonds", the "Company") (TSX-V: KDI) is pleased to announce the final 2015 diamond recovery results from the Faraday 2 kimberlite
at the Company's 100 percent-controlled Kennady North project. A total of 6.4 tonnes of kimberlite was recovered by core drilling
at Faraday 2 and processed by caustic fusion at the Geoanalytical Laboratories Diamond Services of the Saskatchewan Research
Council ("SRC") returning a total 'commercial' sample grade of 3.04 carats per tonne.
Kennady Diamonds President and CEO Patrick Evans noted: "Significant progress was made
delineating and sampling the Faraday 2 kimberlite during 2015. We are very pleased with the excellent results. Delineation drilling
has defined the strike of the Faraday 2 kimberlite over approx. 390 meters and the pipe remains open on strike to the west. The
'commercial' sample grade of over 3 carats per tonne confirms that the Faraday 2 kimberlite has the potential to host a high grade
diamond resource."
Table 1 below summarizes the 2015 caustic fusion diamond recovery results from the Faraday 2 kimberlite.
Table 1 – 2015 Faraday 2 Diamond Recovery Results
Sample Weight (dry tonnes)
|
Number and Weight of Diamonds According to Sieve Size Fraction
(mm)
|
Total diamonds
|
Carats (+0.85mm sieve size)
|
+0.106 -0.150
|
+0.150 -0.212
|
+0.212 -0.300
|
+0.300 -0.425
|
+0.425 -0.600
|
+0.600 -0.850
|
+0.850 -1.180
|
+1.180 -1.700
|
+1.700 -2.360
|
+2.360 -3.350
|
+3.350 -4.750
|
+4.750
|
6.4277
|
5,689
|
3,670
|
2,192
|
1,320
|
831
|
679
|
290
|
125
|
40
|
23
|
4
|
0
|
14,863
|
19.5293
|
*Sample grade of diamonds greater than 0.85mm: 3.04 carats per tonne
The three largest diamonds recovered from the Faraday 2 sample are described as:
- 1.43 carat off-white, transparent tetra hexahedron with no inclusions;
- 1.02 carat off-white, transparent broken aggregate with inclusions; and
- 0.46 carat off-white, transparent fragment with inclusions.
Kennady Diamonds is also pleased to announce the first results from the 2016 Faraday 1 winter drill program. Six
exploration/delineation drill holes were completed from two ice-based platforms located 40 meters on strike to the northwest of the
final holes drilled at the end of the 2015 winter program. The Faraday 1 kimberlite pipe has now been delineated over a strike of
approx. 160 meters. Similar to both the Kelvin and Faraday 2 kimberlites, Faraday 1 outcrops at lake bottom and dips gently to the
northwest with the volume of the pipe increasing to depth.
Mr. Evans commented: "We are very encouraged by the good widths of the latest kimberlite intersections at Faraday 1 and have now
stepped the drill out a further 40 meters to the northwest to complete a further fan of exploration/delineation holes. Plan and
section maps illustrating the latest drill results have been posted under the tab 'Media Links' on the homepage of the Company's
website www.kennadydiamonds.com."
Table 2 below summarizes the latest drill results from the Faraday 1 kimberlite.
Table 2
Faraday 1 2015 Winter Drill Program
Drill Hole
|
Target
|
Azimuth
|
Inclination
|
Kimberlite Intercepts (m)
|
End of Hole (m)
|
From
|
To
|
Intercept*
|
KDI-16-001a
|
Faraday 1
|
230
|
-57
|
114.65
|
139.30**
|
21.70
|
180
|
KDI-16-001b
|
Faraday 1
|
230
|
-63
|
115.00
|
129.60
|
14.60
|
161
|
KDI-16-001c
|
Faraday 1
|
230
|
-50
|
108.18
|
169.10**
|
60.38
|
200
|
KDI-16-002a
|
Faraday 1
|
50
|
-47
|
117.00
|
158.00**
|
35.40
|
193
|
KDI-16-002b
|
Faraday 1
|
50
|
-55
|
112.30
|
137.90
|
25.60
|
177
|
KDI-16-002c
|
Faraday 1
|
50
|
-62
|
112.23
|
132.00**
|
16.75
|
166
|
*Intercepts in sub-vertical holes not true widths
** Includes minor country rock intercepts
Kennady Diamonds today also announced that the first of the two large-diameter reverse circulation drill rigs have arrived at
Kelvin Camp. The second drill rig is expected to arrive by midweek. Drilling to recover the planned 500 tonne bulk sample from
Kelvin North Lobe is expected to commence by the end of the week.
Finally, Kennady Diamonds reported that all the elements of the maiden Kelvin NI 43-101 resource statement have been completed
by the contributing Qualified Persons and are undergoing final review prior to release, which is expected by next week.
****
About Kennady Diamonds
Kennady Diamonds Inc. controls 100 percent of the Kennady North diamond project located in Canada's Northwest Territories immediately adjacent to the Gahcho Kué diamond
mine currently under development by De Beers and Mountain Province Diamonds (T:MPV, NASDAQ:MDM).
Kennady Diamonds aims to identify a resource along the Kelvin – Faraday kimberlite corridor of between a 13 and 16 million
tonnes at a grade of between 2 and 2.5 carats per tonne and also to identify new kimberlites outside of the corridor. The Kelvin –
Faraday corridor is a target for further exploration. The tonnage estimate is based on the drilling completed to date. The
potential quantity is conceptual in nature as there has been insufficient drilling to define a mineral resource and it is uncertain
if further exploration will result in the target being delineated as a mineral resource.
****
Qualified Persons
This news release has been prepared under the supervision of Carl G. Verley, P. Geo., who
serves as the Qualified Person under National Instrument 43-101.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX
Venture Exchange) has reviewed or accepts responsibility for the adequacy or accuracy of this release.
FORWARD LOOKING INFORMATION
This news release includes certain information that may constitute "forward-looking information" under applicable
Canadian securities legislation. Forward-looking information includes, but is not limited to, the Company's strategic plans, future
operations, future work programs and objectives. Forward-looking information is necessarily based upon a number of estimates and
assumptions that, while considered reasonable, are subject to known and unknown risks, uncertainties, and other factors which may
cause the actual results and future events to differ materially from those expressed or implied by such forward-looking
information. There can be no assurance that such information will prove to be accurate, as actual results and future events could
differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on
forward-looking information. All forward-looking information contained in this press release is given as of the date hereof and is
based upon the opinions and estimates of management and information available to management as at the date hereof. The Company
disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information,
future events or otherwise, except as required by law.
SOURCE Kennady Diamonds Inc.
![](http://rt.newswire.ca/rt.gif?NewsItemId=C5875&Transmission_Id=201602160800CANADANWCANADAPR_C5875&DateId=20160216)