VANCOUVER, BRITISH COLUMBIA--(Marketwired - Nov. 3, 2016) - B2Gold Corp. (TSX:BTO)(NYSE
MKT:BTG)(NAMIBIAN:B2G) ("B2Gold" or the "Company") is pleased to announce its operational and financial results for the three and
nine months ended September 30, 2016. The Company previously released its gold production and gold revenue results for the third
quarter of 2016 (see news release dated 10/13/16). All dollar figures are in United States dollars unless otherwise
indicated.
2016 Third Quarter Highlights
- Record quarterly consolidated gold production of 146,686 ounces, 6% (or 7,988 ounces) above budget and 18% (or 22,315
ounces) greater than the same period in 2015
- Consolidated gold revenue a quarterly record of $193 million on record sales of 145,029 ounces at an average price of
$1,331 per ounce, an increase in revenue of 39% (or $53.7 million) over the same period in 2015
- Consolidated cash operating costs a quarterly record low of $491 per ounce, $73 per ounce (or 13%) below budget and $93 per
ounce (or 16%) below the prior-year quarter
- Consolidated all-in sustaining costs of $702 per ounce, $134 per ounce (or 16%) below budget and $173 per ounce (or 20%)
below the prior-year quarter
- Cash flow from operating activities of $90.3 million ($0.10 per share), up 266% from $33.9 million ($0.04 per share) in the
third quarter of 2015
- Strong cash position of $123.8 million at quarter-end
- Masbate Mine's 2016 guidance revised favourably; for full-year 2016, the Masbate Mine is now forecast to produce between
200,000 to 210,000 ounces of gold (up from the previous range of 175,000 to 185,000 ounces) at cash operating costs of between
$465 to $505 per ounce (reduced from the previous range of $620 to $660 per ounce)
- Masbate Mine achieves approximately 6 million man-hours (or 353 days) without a "Lost-Time-Injury" as at September 30,
2016
- Otjikoto Mine achieves record quarterly gold production of 47,564 ounces at record low cash operating costs of $344 per
ounce
- Otjikoto Mine's 2016 annual cash operating cost guidance revised lower to $365 to $405 per ounce (previously was $400 to
$440 per ounce)
- Revised consolidated 2016 production guidance; for full-year 2016, consolidated gold production is now forecast to be
between 535,000 to 575,000 ounces (up from the previous range of 510,000 to 550,000 ounces of gold)
- Revised consolidated 2016 cost guidance; for full-year 2016, consolidated cash operating costs are now forecast to be
between $500 to $535 per ounce (reduced from the previous range of $560 to $595 per ounce) and all-in sustaining costs are now
expected to be between $780 to $810 per ounce (reduced from $895 to $925 per ounce)
- Construction of the Fekola mine is progressing well, on schedule and on budget, and is expected to commence production in
the fourth quarter in 2017
2016 First Nine Months Highlights
- Record year-to-date consolidated gold production of 409,772 ounces, 6% (or 22,651 ounces) above budget and 13% (or 47,976
ounces) over the same period in 2015
- Consolidated gold revenue a year-to-date record of $502.1 million on record sales of 396,757 ounces at an average price of
$1,266 per ounce
- Consolidated cash operating costs a year-to-date record low of $495 per ounce, $86 per ounce (or 15%) below budget and $155
per ounce (or 24%) below the same period last year
- Consolidated all-in sustaining costs of $765 per ounce, $195 per ounce (or 20%) below budget and $236 per ounce (or 24%)
below the same period last year
- Cash flow from operating activities of $329.5 million ($0.35 per share), including $120 million proceeds from Prepaid Sales
transactions, compared to $126.9 million ($0.14 per share) in the same period in 2015
- Signed a Euro 71.4 million Equipment Facility with Caterpillar Financial SARL for the Fekola project (funding subject to
satisfaction of conditions precedent)
- Additional positive exploration drill results reported for the Company's Mali and Burkina Faso greenfield targets
- Received 2015 Award for Social Responsibility in Nicaragua on May 5, 2016
2016 Third Quarter and First Nine Months Operational Results
Consolidated gold production in the third quarter of 2016 was another quarterly record of 146,686 ounces, 6% (or 7,988 ounces)
above budget and 18% (or 22,315 ounces) higher than the same period in 2015. The excellent quarter highlights the continued very
strong performance of the Masbate Mine and record quarterly production from the Otjikoto Mine. Following another very strong
operational quarter at the Masbate Mine, its 2016 annual production guidance has been increased to between 200,000 to 210,000
ounces of gold (significantly up from its original guidance range of between 175,000 to 185,000 ounces of gold). The Company's
other operating mines remain on track to meet their full-year production guidance.
In the third quarter of 2016, consolidated cash operating costs were a quarterly record low of $491 per ounce, $73 per ounce
(or 13%) below budget and $93 per ounce (or 16%) below the prior-year quarter. This significant improvement reflects higher gold
production, lower fuel prices/consumption, and ongoing cost optimization efforts. Consolidated all-in sustaining costs in the
quarter were $702 per ounce, $134 per ounce (or 16%) below budget and $173 per ounce (or 20%) lower than the third quarter of
2015. The lower all-in sustaining costs were primarily driven by the same factors impacting the reduction in cash operating costs
per ounce as well as lower than budgeted capital expenditures at several mine sites due to the timing of pre-stripping and
underground development activity.
Consolidated gold production for the first nine months of 2016 was a year-to-date record 409,772 ounces, 6% (or 22,651 ounces)
above budget and 13% (or 47,976 ounces, including 18,815 ounces of pre-commercial production from Otjikoto) higher than the same
period in 2015.
For the nine months ended September 30, 2016, consolidated cash operating costs were a year-to-date record low of $495 per
ounce, $86 per ounce (or 15%) below budget and $155 per ounce (or 24%) lower than the first nine months of 2015. Consolidated
all-in sustaining costs in the first nine months of 2016 were $765 per ounce, significantly below both budget of $961 per ounce
and $1,001 per ounce in the comparable period of 2015.
B2Gold is projecting another record year for gold production in 2016. Following the uplift in guidance for Masbate, the
Company is now on track to meet a revised annual consolidated production guidance range of between 535,000 to 575,000 ounces of
gold in 2016 (up from the original consolidated guidance range of between 510,000 to 550,000 ounces of gold). The Company has
also updated its cash cost and all-in sustaining cost guidance for the year. The Company now expects consolidated cash operating
costs and all-in sustaining costs to be lower than its original guidance, with a revised consolidated cash operating cost range
of $500 to $535 per ounce (original guidance was $560 to $595 per ounce) and revised consolidated all-in sustaining costs range
of $780 to $810 per ounce (original guidance was $895 to $925 per ounce).
2016 Third Quarter and First Nine Months Financial Results
Consolidated gold revenue in the third quarter of 2016 was a quarterly record $193 million on record sales of 145,029 ounces
at an average price of $1,331 per ounce compared to $139.3 million on sales of 124,481 ounces at an average price of $1,119 per
ounce in the third quarter of 2015. The 39% (or $53.7 million) increase in gold revenue was mainly attributable to a 17% increase
in gold sales volume and a 19% increase in the average realized gold price.
In the third quarter of 2016, cash flow from operating activities of $90.3 million ($0.10 per share) was up 266% from $33.9
million ($0.04 per share) in the prior-year quarter. The significant increase was driven by record gold production combined with
record low costs and higher realized sales prices.
The Company generated net income of $35.7 million ($0.04 per share) in the quarter compared to a net loss of $13.6 million
(negative $0.02 per share) in the third quarter of 2015. Adjusted net income was $48.6 million ($0.05 per share) in the third
quarter of 2016 compared to $2.2 million ($0.00 per share) in the prior-year quarter. Adjusted net income in the third quarter of
2016 mainly excluded various unrealized mark-to-market adjustments (totaling a net gain of $3.3 million) and non-cash impairment
charges of $9.7 mainly for the restructuring of the Company's 51% interest in a joint operation in Nicaragua with Calibre Mining
Corp.
Consolidated gold revenue for the first nine months of 2016 was a nine-month record of $502.1 million on record sales of
396,757 ounces at an average price of $1,266 per ounce compared to $414.6 million (or $437.7 million including $23.1 million of
pre-commercial sales from Otjikoto) on sales of 353,703 ounces (or 372,169 ounces including 18,466 ounces of pre-commercial sales
from Otjikoto) at an average price of $1,172 per ounce in the first nine months of 2015.
Year-to-date, cash flow from operating activities was $329.5 million ($0.35 per share) compared to $126.9 million ($0.14 per
share) in the first nine months of 2015. The increase included $120 million of proceeds received from Prepaid Sales transactions
(see "Liquidity and Capital Resources" section below).
For the nine months ended September 30, 2016, the Company generated net income of $30.5 million ($0.04 per share) compared to
a net loss of $30.0 million (negative $0.03 per share) in the comparable period of 2015. Adjusted net income for the first nine
months of 2016 was $96.5 million ($0.10 per share) compared to $11.7 million ($0.01 per share) in the same period last year.
Liquidity and Capital Resources
As at September 30, 2016, the Company remained in a strong financial position with cash and cash equivalents of $123.8 million
compared to cash and cash equivalents of $85.1 million at December 31, 2015. Working capital at September 30, 2016 was $114.9
million compared to working capital of $104.7 million at December 31, 2015. In addition, the Company has $200 million of undrawn
capacity on its revolving credit facility and a Euro 71.4 million term Equipment Facility (funding subject to satisfaction of
certain conditions precedent) with Caterpillar Financial SARL. The Company believes that this liquidity coupled with continued
strong operating cash flows from its existing mine operations, will provide adequate resources both to maintain operations
(including maintaining available liquidity of at least $100 million) and fund the construction of the Fekola project through
completion (forecast to be in the fourth quarter of 2017) based on current assumptions, including the completion of the term
Equipment Facility and current gold prices.
On August 11, 2016, the Company entered into an equity distribution agreement (the "ATM" Agreement) with two placement Agents
for the sale of common shares for aggregate gross proceeds of up to $100 million through "at the market" distributions under the
Company's shelf prospectus and "at the market" prospectus supplement. The ATM Agreement runs until the earlier of (i) shares with
aggregate gross proceeds of $100 million have been issued, (ii) ) February 11, 2018, or (iii) termination by one of parties. The
placement agents, collectively, receive a placement fee of 2% of the gross proceeds from each placement. In the third quarter of
2016, the Company issued 7.6 million shares for net proceeds of $24.7 million under the ATM Agreement.
In March 2016, the Company entered into a series of Prepaid Sales transactions totalling $120 million with its revolving
credit facility bank syndicate. The Prepaid Sales transactions, in the form of metal sales forward contracts, allow the Company
to deliver predetermined volumes of gold on agreed future delivery dates in exchange for upfront cash pre-payment. The Prepaid
Sales transactions have a term of 33 months, which commenced in March 2016, and settlement will be in the form of physical
deliveries of approximately 103,300 ounces of unallocated gold from any of the Company's mines in 24 equal monthly installments
during 2017 and 2018 (estimated to represent approximately 9% and 6%, respectively, of the forecast production in those
years).
Operations
Mine-by-mine gold production in the third quarter and first nine months of 2016 was as follows:
|
|
|
|
|
Mine |
Q3 2016
Production
(ounces) |
YTD 2016
Production
(ounces) |
Updated
2016 Annual
Production
Guidance
(ounces) |
Original
2016 Annual
Production
Guidance
(ounces) |
Masbate |
47,676 |
157,591 |
200,000 - 210,000 |
175,000 - 185,000 |
Otjikoto |
47,564 |
119,439 |
160,000 - 170,000 |
160,000 - 170,000 |
La Libertad |
37,261 |
97,266 |
125,000 - 135,000 |
125,000 - 135,000 |
Limon |
14,185 |
35,476 |
50,000 - 60,000 |
50,000 - 60,000 |
|
|
|
|
|
B2Gold Consolidated |
146,686 |
409,772 |
535,000 - 575,000 |
510,000 - 550,000 |
|
|
|
|
|
Mine-by-mine cash operating costs in the third quarter and first nine months of 2016 was as follows:
|
|
|
|
|
Mine |
Q3 2016
Cash Operating
Costs
($ per ounce) |
YTD 2016
Cash Operating
Costs
($ per ounce) |
Updated
2016
Annual Cash
Operating
Cost Guidance
($ per ounce) |
Original
2016
Annual Cash
Operating
Cost Guidance
($ per ounce) |
Masbate |
$466 |
$437 |
$465 - $505 |
$620 - $660 |
Otjikoto |
$344 |
$368 |
$365 - $405 |
$400 - $440 |
La Libertad |
$637 |
$658 |
$650 - $680 |
$650 - $680 |
Limon |
$682 |
$725 |
$690 - $730 |
$610 - $650 |
|
|
|
|
|
B2Gold Consolidated |
$491 |
$495 |
$500 - $535 |
$560 - $595 |
|
|
|
|
|
Masbate Gold Mine - Philippines
The Masbate Mine in the Philippines continued its very strong operational performance into the third quarter of 2016,
producing 47,676 ounces of gold, 4% (or 1,806 ounces) above budget and 18% (or 7,308 ounces) higher than the third quarter of
2015. Masbate's strong quarter was driven by better-than-expected grades from the Main Vein Stage 1 pit and higher recoveries
arising from higher-than-budgeted oxide ore from the Colorado pit. In addition, recoveries were positively impacted by the newly
completed process plant upgrades (adding residence time and additional oxygen to the CIL circuit to achieve optimum leach
performance). Based on Masbate's strong performance, its 2016 annual production and cost guidance have both been favourably
revised. For full-year 2016, the Masbate Mine is now forecast to produce between 200,000 to 210,000 ounces of gold (significantly
up from its original guidance range of 175,000 to 185,000 ounces) at cash operating costs of between $465 to $505 per ounce
(significantly lower than its original guidance range of $620 to $660 per ounce). Revised all-in sustaining costs are expected to
be in the range of $680 to $720 per ounce for the year.
Throughout 2016, the trend of better-than-expected grades in Main Vein Stage 1 pit combined with more oxide ore than modelled
from the Colorado pit has continued. In the third quarter of 2016, high grade ore tonnes and grade mined from the Main Vein Stage
1 pit were both significantly above budget by 68% (1,299,351 tonnes versus 772,507 tonnes budget) and 24% (1.48 g/t versus
1.19 g/t budget), respectively. High grade ore tonnes mined from the Colorado pit in the quarter were also significantly above
budget by 39% (1,068,467 tonnes at 0.99 g/t versus 769,941 tonnes at 1.01 g/t budget). Of the high grade ore mined in the quarter
from the Colorado pit, 99%was oxide material compared to budget of 46%.
Mill throughput in the third quarter of 2016 was 1,604,176 tonnes compared to budget of 1,727,603 tonnes and 1,669,355 tonnes
in the third quarter of 2015. Mill throughput in the quarter was affected by a six day plant shutdown to tie-in various plant
upgrades. This shutdown had been originally planned for October but was moved up to late September. Mill head grade in the
quarter was 1.20 g/t, 7% higher than budget of 1.12 g/t and 20% higher compared to 1.00 g/t in the third quarter of 2015. Mill
head grade was lower compared to the second quarter of 2016 of 1.40 g/t as a result of a change in the mine plan (discussed in
the paragraph below) which now prioritizes lower grade Colorado ore as mill feed for the remainder of 2016. Mill recoveries
averaged 77.2% which was better than budget of 73.9% and 75.0% in the third quarter of 2015. The improved recoveries in the third
quarter reflect both the higher than budgeted oxide blend and the benefit of the additional leach tanks installed as part of the
Masbate plant upgrade which came on line on June 29, 2016.
In August 2016, Masbate's mine plan was adjusted to optimize the mine's development sequence/gold production through to 2017
and beyond. These adjustments included accelerated mining in the Main Vein Stage 1 pit, expanding the Colorado pit and commencing
site preparations for later Main Vein stages. In addition, the lower grade (but higher recovery) Colorado pit ore has now been
prioritized as mill feed ahead of the higher grade Main Vein ore, largely due to the higher than budgeted oxide ore content being
sourced from the larger Colorado pit. The excess higher grade ore from Main Vein Stage 1 pit will now be stockpiled and processed
in 2017. The modified mine plan provides for continued strong gold production in the fourth quarter of 2016 while optimizing
production in 2017 and beyond.
Masbate's third quarter cash operating costs were $466 per ounce, $179 per ounce (or 28%) below budget and $218 per ounce (or
32%) below the prior-year quarter. This significant reduction was mainly the result of both higher gold production and lower
fuel/energy costs. All-in sustaining costs in the quarter were $650 per ounce, significantly below both budget of $955 per ounce
and $1,030 per ounce in the prior-year quarter, reflecting the favourable cash operating costs as well as lower capital
expenditures and pre-stripping costs.
Year-to-date, gold production at Masbate was 157,591 ounces of gold, significantly above budget by 16% (or 21,209 ounces) and
23% (or 29,746 ounces) higher than the first nine months of 2015. The Company is pleased to announce that as at September 30,
2016 the Masbate operations had completed approximately 6 million man-hours (or 353 days) without a "Lost-Time-Injury". This
achievement was attained by staff, workers, and contractors who are truly committed to working safely.
Masbate's cash operating costs for the first nine months of 2016 were a year-to-date record low of $437 per ounce, $172 per
ounce (or 28%) below budget and $275 per ounce (or 39%) below the same period last year. All-in sustaining costs for the first
nine months of 2016 were $612 per ounce, significantly below both budget of $888 per ounce and $1,029 per ounce in the first nine
months of 2015.
Capital expenditures in the third quarter of 2016 totaled $4.9 million which consisted mainly of $2.8 million for the plant
expansion, $0.8 million for powerhouse upgrades and $0.7 million in mobile equipment purchases. Year-to-date capital expenditures
totaled $22.3 million, consisting mainly of $12.5 million for the plant expansion, $3.8 million in mobile equipment purchases,
$1.8 million in pre-stripping costs and $0.8 million for powerhouse upgrades.
Masbate's process plant upgrades have now been substantially completed with most process improvements integrated into
operation slightly ahead of the original schedule. The tie-in of the plant upgrades undertaken during the six-day shutdown in
September involved screens, cyclones, pump drives, grinding circuit improvements, additional cooling capacity and additional
pumps. The plant upgrades are expected to improve gold recoveries by between 2% and 3% and sustain throughput on harder ore
types.
As previously reported by the Company, on September 27, 2016, the Philippine Department of Environment and Natural Resources
(the "DENR") announced the preliminary results of mining audits carried out by the DENR in respect of all metallic mines in the
Philippines. At that time, DENR spokespersons advised the Company that the Masbate Mine would receive a show-cause letter related
to its operations. The DENR subsequently issued the Masbate Mine audit report which contains the detailed findings from the audit
and directed the Company to provide explanations and comments in response to the audit findings; however, no show-cause order was
issued to the Company in respect of any findings. The audit findings are related to administrative and regulatory issues,
including without limitation (a) alleged issues related to certain mining operations occurring in areas not covered by the
Environmental Compliance Certificate, which in the Company's view is mistaken and likely arises as a result of incorrect
geographical coordinates of the Masbate project used by the auditors, and (b) alleged issues related to the appropriate approval
of mine operating and production plans, the payment of fees for waste and tailing disposal, and a series of alleged infractions
of the Philippine Mining Act of 1995 and safety regulations. The audit also includes recommendations related to guidelines
to enhance Masbate's reclamation planning and practices, and several proposals related to community planning and development
which the Company supports. The Company has provided a comprehensive response to the findings and recommendations in the audit,
which the Company believes addresses the issues raised, and which is presently being evaluated by the DENR. Presently, operations
at Masbate continue uninterrupted and the personnel at the DENR have been highly cooperative and supportive in helping to address
these matters. However, until the Company receives the results of the DENR's review of its response to the audit (expected in
November) the final outcome of the audit process, which may lead to the issuance of a show-cause order and the suspension of
operations at Masbate, is not known.
Otjikoto Mine, Namibia
The Otjikoto Mine in Namibia produced a quarterly record 47,564 ounces of gold in the third quarter of 2016, 10% (or 4,191
ounces) above budget and 24% (or 9,312 ounces) higher than the third quarter of 2015. The increased production was mainly due to
higher mill throughput. Mill throughput exceeded budgeted and the same quarter in 2015 primarily due to the completion of
Otjikoto's mill expansion project in September 2015 (which has increased plant capacity from 2.5 million tonnes per annum to 3.0
million tonnes per annum). Head grade and recoveries in the quarter were 1.66 g/t (Q3 2015 - 1.71 g/t) and 98.0% (Q3 2015 -
99.1%), respectively, and were both approximately in-line with budget.
In the third quarter of 2016, ore was mined from the Otjikoto Phase 1 pit which was reopened after the new access ramp was
completed in June 2016. In the fourth quarter of 2016, it is expected that the majority of ore produced will continue to be
sourced from the Otjikoto Phase 1 pit, with minor ore tonnage from the Otjikoto Phase 2 pit and the new Wolfshag starter pit.
Development of the Wolfshag pit is progressing on schedule, with the first ore expected before the end of 2016.
Otjikoto's third quarter cash operating costs were a record low $344 per ounce, $20 per ounce (or 5%) below budget and $49 per
ounce (or 12%) below the prior-year quarter. This was mainly the result of higher gold production, lower fuel prices and lower
fuel/reagent consumption. All-in sustaining costs in the quarter were $474 per ounce, below both budget of $486 per ounce and
$510 per ounce in the prior-year quarter, mainly reflecting lower cash operating costs.
During the first nine months of 2016, the Otjikoto Mine produced 119,439 ounces of gold, 3% (or 2,987 ounces) above budget and
12% higher compared to 106,349 ounces (including 18,815 ounces of pre-commercial production) produced in the same period last
year.
Otjikoto's cash operating costs for the first nine months of 2016 were a year-to-date record low of $368 per ounce, $61 per
ounce (or 14%) below budget and $76 per ounce (or 17%) lower than in the same period last year (following commercial production
on February 28, 2015). All-in sustaining costs for the first nine months of 2016 were $611 per ounce compared to budget of $695
per ounce and $569 per ounce in the same period last year (following commercial production on February 28, 2015).
Capital expenditures in the third quarter of 2016 totaled $7.5 million and included pre-stripping costs of $5.1 million and
mobile equipment costs of $1.0 million. Capital expenditures for the nine months ended September 30, 2016 totaled $33.8 million
and included pre-stripping costs of $14.6 million and mobile equipment costs of $16.1 million.
The Otjikoto Mine is on track to meet its annual production guidance of between 160,000 to 170,000 ounces of gold in 2016.
Gold grade is expected to increase slightly during the fourth quarter of 2016, as the higher grade ore near the bottom of the
Otjikoto Phase 1 pit is mined out and the first ore from the Wolfshag starter pit is produced. The Wolfshag open pit will
continue to produce higher than average grade ore for three to five years, depending on the transition to underground mining.
Life-of-mine production plans for the Otjikoto project, incorporating the Wolfshag open pit and underground mines, have been
completed for various options and will be further refined as the detailed geotechnical, hydrogeological, and design studies are
completed in the first quarter of 2017 (open pit) and first-half of 2017 (underground). Ongoing studies are leading the Company
to re-evaluate the open pit and underground interface.
The Company has updated its 2016 cost guidance for the Otjikoto Mine. The Company now expects Otjikoto' s full-year cash
operating costs to be lower than original guidance, with a revised cash operating cost range of $365 to $405 per ounce (original
guidance was $400 to $440 per ounce). Revised all-in sustaining costs are expected to be in the range of $600 to $640 per ounce
for the year.
La Libertad Gold Mine - Nicaragua
Gold production at La Libertad Mine in Nicaragua was 37,261 ounces in the third quarter of 2016, 9% (or 3,014 ounces) above
budget and 19% (or 6,027 ounces) higher than the prior-year quarter. The increase was due to better grade. Mill head grade in the
quarter was 2.19 g/t, 13% above budget (of 1.93 g/t) and 23% higher than the third quarter of 2015 (of 1.78 g/t). During the
quarter, La Libertad's mine schedule was modified to mine additional high grade ore from the Jabali Central pit to offset
permitting delays at the Jabali Antenna pit. The La Libertad mill continues to operate well processing 556,730 tonnes (Q3 2015 -
581,597 tonnes) with recoveries of 95.2% (Q3 2015 - 94.0%). Mill throughput was 29,850 tonnes below budget in the quarter due to
the additional "harder" Jabali Central ore being processed.
For Jabali Antenna, prior to completing the mine permitting process, the Company must first finish the related resettlement
activities. However, meetings with the Nicaraguan government and stakeholders have been temporarily postponed until after the
Nicaraguan presidential election on November 6, 2016. As a result, mining from the Jabali Antenna pit, previously scheduled to
begin in the second quarter of 2016, is now forecast to commence in the second half of 2017.
La Libertad's cash operating costs in the third quarter of 2016 were $637 per ounce, $64 per ounce (or 9%) below budget and
$22 per ounce (or 3%) below the prior-year quarter. This was mainly the result of higher gold production and lower stripping
costs. All-in sustaining costs in the quarter were $788 per ounce, below both budget of $908 per ounce and $812 per ounce in the
prior-year quarter, reflecting lower cash operating costs and lower capital expenditures and pre-stripping costs.
For the nine months ended September 30, 2016, La Libertad produced 97,266 ounces of gold, 4% (or 3,805 ounces) above budget
and 15% (or 13,025 ounces) higher than the first nine months of 2015.
Year-to-date, La Libertad's cash operating costs were $658 per ounce, $41 per ounce (or 6%) below budget and $106 per ounce
(or 14%) below the same period last year. All-in sustaining costs for the first nine months of 2016 were $913 per ounce, below
both budget of $1,153 per ounce and $1,034 per ounce in the first nine months of 2015.
Capital expenditures in the third quarter of 2016 totaled $2.3 million which consisted primarily of Jabali Central development
($0.7 million), Mojon underground development costs ($0.5 million), process plant costs ($0.4 million) and treatment plant costs
($0.3 million). Year-to-date capital expenditures totaled $14.0 million, consisting primarily of La Esperanza tailings dam costs
($5.1 million), Jabali Central development costs ($4.5 million), pre-stripping costs ($2.8 million) and Mojon underground
development costs ($1.0 million).
La Libertad expects to meet its 2016 annual guidance of between 125,000 to 135,000 ounces of gold at cash operating costs of
between $650 to $680 per ounce. Budgeted gold production at La Libertad is weighted towards the second half of the year, due to
higher anticipated processed grades. Due to the lower than budgeted capital expenditures incurred to date in 2016, all-in
sustaining costs are now expected to be in the range of $900 to $940 per ounce for the year.
El Limon Gold Mine - Nicaragua
El Limon open pit and underground mine in Nicaragua produced 14,185 ounces of gold in the third quarter of 2016, slightly
below budget (of 15,208 ounces), but consistent with the prior-year quarter of 14,517 ounces. The mill continues to operate well
processing 128,809 tonnes (Q3 2015 - 128,002 tonnes) with recoveries averaging 94.5% (Q3 2015 - 94.1%). Both throughput and
recoveries were slightly above budget. Mill head grade was 3.63 g/t (Q3 2015 - 3.75 g/t) compared to budget of 3.93 g/t. Although
underground-sourced grade was better than anticipated (4.58 g/t versus budget of 4.20 g/t), mill feed was supplemented in the
quarter with lower grade material from surface stockpiles due to fleet availability and maintenance program changes. During the
quarter, two haul trucks and a long-hole drill were added.
El Limon's third quarter cash operating costs were $682 per ounce, $99 per ounce (or 17%) above budget and $38 per ounce (or
6%) higher compared to the prior-year quarter. The increase was mainly due to lower gold production. All-in sustaining costs in
the quarter were $1,067 per ounce compared to budget of $933 per ounce and $1,202 per ounce in the prior-year quarter. All-in
sustaining costs reflect the increase in cash operating costs and differences in the timing of capital expenditures.
Year-to-date, El Limon produced 35,476 ounces of gold compared to budget of 40,826 ounces and 43,361 ounces produced in the
same period last year.
El Limon's year-to-date cash operating costs were $725 per ounce, $80 per ounce (or 12%) above budget and $63 per ounce (or
10%) higher than in the same period last year. All-in sustaining costs for the first nine months of 2016 were $1,101 per ounce
compared to budget of $1,057 per ounce and $1,240 per ounce in the first nine months of 2015.
Capital expenditures in the third quarter of 2016 totaled $2.3 million which consisted mainly of underground development costs
($1.0 million) and mining equipment ($0.8 million). Year-to-date capital expenditures totaled $5.3 million, consisting mainly of
underground development costs ($2.7 million), mining equipment ($0.8 million) and pumping project ($0.3 million).
El Limon is on track to meet the low end of its 2016 annual production guidance range of between 50,000 to 60,000 ounces of
gold. The Company has updated its 2016 annual cost guidance for El Limon. The Company now expects El Limon's cash operating costs
to be higher than the original guidance, with a revised cash operating cost range of $690 to $730 per ounce (original guidance
was $610 to $650 per ounce). Revised all-in sustaining costs are expected to be in the range of $1,060 to $1,100 per ounce for
the year.
Development
Fekola Development Project - Mali
In the third quarter of 2016, B2Gold's construction team continued to develop the Fekola project in Mali which remains on
schedule and on budget to commence production in the fourth quarter of 2017. Significant activities during the quarter
included:
- Earthwork and surface water control structures largely completed;
- Primary crusher concrete nearing completion;
- Reclaim concrete complete;
- Mill concrete nearing completion;
- Conveyor structure installation in progress;
- Leach tank erection complete, structural and mechanical installation in progress;
- Power plant concrete pouring in progress;
- Permanent camp complete and operational;
- All design and procurement items remain on schedule;
- Workforce maintained at approximately 800 employees and contractors.
On June 29, 2016, the Company announced an exploration update for its Fekola project. Based on the positive drill results to
date (at both near surface and underground below the main Fekola pit) and exploration potential, the Company is expanding the
throughput at the Fekola mine to 5 million tonnes per year. The optimized Feasibility Study and Environmental and Social Impact
Study were both prepared to accommodate an uplift in throughput from 4 million tonnes per year to 5 million tonnes per year. The
uplift factors built into the original design included 5 million tonnes per year assumptions for plant design, general
infrastructure and tailings dam design and location. This means that the capacity for throughput of ore at the Fekola mine could
reach up to 5 million tonnes per year in the initial years of production, beyond the optimized Feasibility Study's originally
modelled 4 million tonnes per year, for relatively low additional capital cost. On August 2, 2016, the Company decided to proceed
with the mill expansion and approved an $18 million expansion budget for additional items including a pebble crusher, one
additional leach tank and an additional generator. With this additional capital investment the Fekola mill expansion is expected
to be completed in the fourth quarter of 2017 and commissioned in conjunction with the main plant commissioning. This mill
capacity increase could potentially increase annual production by up to 20% (subject to mine planning), surpassing initial
Feasibility Study projections of approximately 350,000 ounces of gold per year for the first seven years of operation. Further
production scheduling and cost guidance under the 5 million tonne per year case will be available in early 2017.
The Company has also approved a plan to relocate the village of Fadougou, located adjacent to the main Fekola pit. This
decision was not made based on a requirement in the Construction Permit but on extensive stakeholder engagement with the local
population. Relocation of the village will be completed in accordance with a Resettlement Action Plan ("RAP") that was completed
by an independent consultant in consultation with all stakeholders. The RAP has been submitted to the appropriate Malian
authorities and the Company is currently in the process of acquiring the land necessary for relocation. It is anticipated that
the relocation process will commence in the fourth quarter of 2016 and will take 2 years to complete. Total estimated relocation
costs are approximately $20 million to be incurred over the balance of 2016 and in 2017.
During 2016, the Company approved inceases to the Fekola project budget for 2016 totaling $27.5 million including $6.1 million
for 2016 plant expansion costs, $10 million related to relocating the village of Fadougou and $4.8 million related to the change
in timing of ordering certain mine fleet items. The impact of the increase to the Fekola project budget for the three and nine
months ended September 30, 2016, is an increase in budgeted costs of approximately $15.6 million and $17.6 million, respectively.
Capital expenditures on the Fekola project in the three and nine months ended September 30, 2016 totaled $64.2 million and $161.6
million, respectively, compared to a revised Fekola project budget of $78.4 million and $186.7 million, respectively.
Expenditures on the Fekola project to date were $291.0 million including $37.9 million of preconstruction expenditures compared
with a revised Fekola project budget to date of $301.9 million. The Fekola project remains on budget and the variances against
the revised budget were mainly due to the timing of payments for construction of the processing plant.
During 2016, the Company also increased its 2016 exploration budget for Mali from $6.9 million to $11.4 million. The Company
is approximately 70% through a 98,500 metre diamond, reverse circulation, auger and air core drill program to follow up on the
successful 2015 program.
Kiaka Development Project - Burkina Faso
On June 29, 2016, the Company announced positive exploration drill results at the new Toega prospects near the Kiaka deposit.
These indicate the presence of new, potentially higher-grade gold zones. Preliminary internal studies indicate that combining the
potential higher-grade ore from the Toega zones with ore from the lower-grade Kiaka deposit could have a very positive effect on
the economics of the project. The Company has increased the budget for the areas around the Kiaka deposit by $3 million to a
total of $5.6 million on the strength of these results. The additional funds will be used to further explore and conduct infill
drilling at the new higher-grade gold zones along with completing detailed metallurgical sampling and testing and base line
permitting work.
The Company continues to evaluate its timeline for updating the Kiaka feasibility study. An updated study will include key
items such as optimizing the plant throughput rate, new cost estimates based on current economic conditions, alternative sources
of electrical power and exploration success near Kiaka. During the second quarter of 2016, the Company approved an additional
budget of $7.5 million for updated feasibility study work to be undertaken during the remainder of 2016. The Company is currently
targeting mid-2017 for completion of the updated optimized Kiaka study, subject to further delineation of the size of the
deposit.
Outlook
B2Gold is projecting another record year for gold production in 2016. Consolidated gold production in 2016 is now expected to
be in the range of 535,000 to 575,000 ounces (an increase from the original range of 510,000 to 550,000 ounces), reflecting the
continued very strong performance of the Masbate Mine and record production from the Otjikoto Mine. In conjunction with this and
based on the Company's solid operational performance over the first nine months of 2016, its expectation for full-year
consolidated cash operating costs for fiscal 2016 have been revised and are now expected to be in the range of $500 to $535 per
ounce (a reduction from the Company's original guidance range of $560 to $595 per ounce). The Company's consolidated all-in
sustaining costs have also been revised and are now expected to be in the range of $780 to $810 per ounce (a reduction from the
Company's original guidance range of $895 to $925 per ounce). The improvement in consolidated cash operating and all-in
sustaining costs against both budget and prior year reflects ongoing cost optimization efforts at all sites, lower fuel costs at
all sites and higher than budgeted production at the Masbate, Otjikoto and Libertad mines.
In March 2016, the Company put several new funding measures in place. A total of $120 million was received from Prepaid Sales
transactions and the Company has signed a Euro 71.4 million Equipment Facility with Caterpillar Financial SARL. In addition,
higher realized gold prices and better operating cost performance from the Company's mines continue to significantly improve
operating cash flows. In the third quarter of 2016, operating cash flows from the Company's mining operations totaled $90.3
million, almost tripling from the prior-year quarter. Year-to-date, the Company has generated $329.5 million from operating
activities (including proceeds from the Prepaid Sales transactions). The Company expects that the combination of the new funding
measures and continued strong performance from operations will provide sufficient liquidity and resources to maintain operations
(including maintaining available liquidity of $100 million) and ensure that, based on current assumptions, construction of the
Fekola project is fully funded through to completion (forecast to be in the fourth quarter of 2017).
The core activities of the Company remain its current mining operations and the construction of its Fekola project. The Fekola
project is currently in construction and scheduled to commence production in the fourth quarter of 2017. The Company has recently
approved an $18 million budget for the expansion of the Fekola mill from 4 million tonnes per year to 5 million tonnes per year
which is expected to be brought on-line in the fourth quarter of 2017, in conjunction with the main plant commissioning. Fekola
is expected to be another low-cost mine and should enable the Company to significantly increase its production base while at the
same time reduce its longer term forecast consolidated cash operating costs per gold ounce and all-in sustaining costs per gold
ounce.
In addition to its development of Fekola, the Company has also focused on maintaining strategic development expenditures on
core projects such as the Masbate Mine process plant upgrade. These core project investments should continue to contribute to the
Company's overall operating cost improvements, operational efficiencies and production growth profile. Sustainable organic growth
also requires a continued focus on exploration, including both brownfield exploration at the Company's existing projects and
additional greenfield opportunities. The most significant areas of exploration focus for the Company are in West Africa. As part
of the 2016 budget, the Company originally allocated $30 million for exploration activities. Since the beginning of 2016, the
Company has committed additional funds totaling approximately $15 million to pursue additional greenfield exploration targets in
both Mali and Burkina Faso ($8 million) and to update the Kiaka Feasibility Study ($7 million). Coupled with this focus on its
core projects, and in conjunction with a determination as to best deployment of investment capital, the Company has undertaken a
review of its non-core projects during the period. As a result, the Company has commenced a process to consider offers for the
sale of the Gramalote Joint Venture development project in Colombia, along with a process to restructure its 51% interest in the
joint operations in Nicaragua with Calibre Mining Corp.
The Company's ability to secure funding for the construction of the Fekola project on attractive terms without a dilutive
equity financing, combined with a strong growth in the Company's production profile, clearly demonstrates that its cost effective
growth strategy is working. It is this strategy that continues to strengthen the Company via accretive acquisitions, exploration
success and the demonstrated ability to reduce operating costs.
Based on current assumptions and updates to the Company's long-term mine plans, the Company is projecting gold production in
2016 of between 535,000 to 575,000 ounces, 520,000 to 570,000 ounces in 2017 and significantly increasing to between 900,000 to
950,000 ounces in 2018 with the planned first full year of production from the Fekola project.
About B2Gold
Headquartered in Vancouver, Canada, B2Gold Corp. is one of the fastest-growing intermediate gold producers in the world.
Founded in 2007, today, B2Gold has four operating mines, one mine under construction and numerous exploration projects in various
countries, including Nicaragua, the Philippines, Namibia, Mali and Burkina Faso. Construction of B2Gold's Fekola mine in
southwest Mali is on schedule and on budget, and is projected to commence production in the fourth quarter of 2017. As a result,
B2Gold is well positioned to maintain its low-cost structure and growth profile.
The Company would like to confirm that it is progressing with the process to consider offers for the sale of its 49% interest
in the Gramalote Joint Venture development project in Colombia and that it is not considering selling its Nicaraguan assets at
this time.
Based on current assumptions and updates to B2Gold's current year guidance and long-term mine plans, the Company is projecting
consolidated gold production in 2016 of between 535,000 to 575,000 ounces; in 2017 of between 520,000 to 570,000 ounces; and in
2018 (significantly increasing to) of between 900,000 to 950,000 ounces, with the inclusion of the anticipated first full year of
production at the Fekola mine.
Third Quarter 2016 Financial Results - Conference Call Details
B2Gold Corp. will release its third quarter 2016 financial results before the North American markets open on Thursday,
November 3, 2016.
B2Gold executives will host a conference call to discuss the results on Thursday, November 3, 2016 at
10:00 am PST / 1:00 pm EDT. You may access the call by dialing the operator at 416-340-2218 or toll free at
866-225-0198 prior to the scheduled start time or, you may listen to the call via webcast by clicking http://www.investorcalendar.com/IC/CEPage.asp?ID=175345. A playback
version of the call will be available for one week after the call at 905-694-9451 or toll free at 800-408-3053 (passcode:
9532466).
Qualified Person
Peter D. Montano, P.E., the Project Director of B2Gold, a qualified person under NI 43-101, has approved the scientific and
technical information contained in this news release.
ON BEHALF OF B2GOLD CORP.
"Clive T. Johnson"
President and Chief Executive Officer
For more information on B2Gold please visit the Company website at www.b2gold.com.
The Toronto Stock Exchange neither approves nor disapproves the information contained in this news release.
This news release includes certain "forward-looking information" and "forward-looking statements" (collectively,
"forward-looking statements") within the meaning of applicable Canadian and United States securities legislation, including
projections of future financial and operational performance, statements with respect to future events or future performance,
production estimates and guidance, anticipated operating and production costs and revenue and guidance, and estimates of capital
expenditures and statements regarding anticipated exploration, development, construction, production, permitting and other
activities of the Company, including production from the Fekola mine commencing in the fourth quarter of 2017; construction of
the Fekola project being fully funded through to completion; completion and funding under the $80.9 million Equipment Facility
with Caterpillar Financial SARL; mine plans; expected ore sources, ratios and grades; the modified mine plan for Masbate
resulting in strong gold production and optimized production in 2017 and beyond; excess higher grade ore from Main Vein Stage 1
pit at Masbate being stockpiled and processed in 2017; the completion of the plant upgrades at Masbate and the upgrades improving
gold recoveries and sustaining throughput; the resolution of the audit by the DENR in relation to the Masbate Mine; anticipated
grade increasing at Otjikoto in the fourth quarter of 2016, the Wolfshag starter pit producing ore before the end of 2016 and
Wolfshag producing higher than average grade ore for three to five years; refinement of a new mine plan for Otjikoto, including
the Wolfshag deposit and underground mining, and completion of associated studies in the first quarter of 2017 (open pit) and the
first half of 2017 (underground); the Jabali Antenna pit at La Libertad entering the production stream in the second half of
2017, upon completion of resettlement activities and receipt of remaining mining permits; the forecast that production at La
Libertad will be weighted to the second half of 2016 and that the mill feed in the second half will contain a higher percentage
of high grade ore; the exploration potential in the Fekola area and the potential increase of throughput processing at the Fekola
project;
Fekola being a low-cost mine, allowing B2Gold to significantly increase its production base while reducing longer term
forecast cash operating costs and all-in sustaining costs; completion of the Fekola mill expansion by the end of 2017, the
estimated capital expenditures required to do so, and the related potential increase in projected annual production; production
scheduling and cost guidance for the mill expansion at Fekola being available in early 2017; the projections and estimates
included in the Fekola Feasibility Study; completion of the relocation of Fadougou according to the RAP; the adequacy of capital
for continued operations; the proposed disposition of the Company's interest in the Gramalote Joint Venture; the proposed
restructuring of the Company's interest in a joint operation with Calibre Mining Corp. in Nicaragua; the delivery of ounces under
the Prepaid Sales transactions and the proportion of production sold thereunder; and the Company maintaining its low-cost
structure and growth profile and being on track to meet its consolidated 2016 production guidance.
Estimates of mineral resources and reserves are also forward looking statements because they constitute projections, based
on certain estimates and assumptions, regarding the amount of minerals that may be encountered in the future and/or the
anticipated economics of production, should a production decision be made. All statements in this news release that address
events or developments that we expect to occur in the future are forward-looking statements. Forward-looking statements are
statements that are not historical facts and are generally, although not always, identified by words such as "expect", "plan",
"anticipate", "project", "target", "potential", "schedule", "forecast", "budget", "estimate", "intend" or "believe" and similar
expressions or their negative connotations, or that events or conditions "will", "would", "may", "could", "should" or "might"
occur.
All such forward-looking statements are based on the opinions and estimates of management as of the date such statements
are made. Forward-looking statements necessarily involve assumptions, risks and uncertainties, certain of which are beyond
B2Gold's control, including the uncertainty of estimates regarding the costs of construction and the timing and amount of
production; risks associated with the volatility of metal prices and currencies; risks and dangers inherent in exploration,
development and mining activities; uncertainty of reserve and resource estimates; availability of financing and financing risks;
risks related to hedging activities; the ability to obtain and maintain any necessary permits, consents or authorizations
required for mining activities; shortages or cost increases in necessary equipment, supplies and labour; regulatory, political
and country risks; litigation risk; risks related to environmental regulations or hazards and compliance with complex regulations
associated with mining activities; the ability to replace mineral reserves and identify acquisition opportunities; unknown
liabilities of companies acquired by B2Gold; fluctuations in exchange rates; the ongoing audit by the DENR in relation to our
Masbate Project; risks related to operations in foreign countries and compliance with foreign laws; risks related to remote
operations and the availability adequate infrastructure; fluctuations in price and availability of energy and other inputs
necessary for mining operations; risks related to reliance upon contractors, third parties and joint venture partners; challenges
to title or surface rights; dependence on key personnel; the risk of an uninsurable or uninsured loss; changes in tax laws;
community support for our operations including risks related to strikes and the halting of such operations from time to time; as
well as other factors identified and as described in more detail under the heading "Risk Factors" in B2Gold's most recent Annual
Information Form and B2Gold's other filings with Canadian securities regulators and the U.S. Securities and Exchange Commission
(the "SEC"), which may be viewed at www.sedar.com and www.sec.gov, respectively.
The list is not exhaustive of the factors that may affect the Company's forward-looking statements. There can be no
assurance that such statements will prove to be accurate, and actual results, performance or achievements could differ materially
from those expressed in, or implied by, these forward-looking statements. Accordingly, no assurance can be given that any events
anticipated by the forward-looking statements will transpire or occur, or if any of them do, what benefits or liabilities B2Gold
will derive therefrom. The Company's forward looking statements reflect current expectations regarding future events and
operating performance and speak only as of the date hereof and the Company does not assume any obligation to update
forward-looking statements if circumstances or management's beliefs, expectations or opinions should change other than as
required by applicable law. For the reasons set forth above, you should not place undue reliance on forward-looking
statements.
The disclosure in this news release and in the documents described in this news release regarding mineral properties was
prepared in accordance with Canadian National Instrument 43-101 ("NI 43-101"), which differs significantly from the mineral
reserve disclosure requirements of the SEC set out in Industry Guide 7. In particular, NI 43-101 permits companies to use the
term "resources", which are not "reserves". U.S. companies subject to the disclosure requirements of the SEC are not normally
permitted to disclose mineralization unless they constitute "reserves" by U.S. standards in documents filed with the SEC.
Accordingly, while mineral resources are recognized and required to be disclosed by NI 43-101, the SEC's disclosure standards
normally do not permit U.S. companies to disclose mineral resources in their filings with the SEC. Investors are specifically
cautioned not to assume that any part or all of "measured mineral resources", "indicated mineral resources" or "inferred mineral
resources" will ever be converted into SEC defined mineral reserves. Further, while NI 43-101 permits companies to disclose
economic projections contained in preliminary economic assessments and pre-feasibility studies, which are not based on
"reserves", U.S. companies are not normally permitted to disclose economic projections for a mineral property in their SEC
filings prior to the establishment of "reserves". In addition, the definitions of "reserves" and related terms under NI 43-101
and the SEC's Industry Guide 7 differ significantly. Under SEC standards, mineralization may not be classified as a "reserve"
unless the determination has been made that the mineralization could be economically and legally produced or extracted at the
time the reserve determination is made. Among other things, all necessary permits would be required to be in hand or issuance
imminent in order to classify mineralized material as reserves under the SEC standards. As a result, reserves disclosed by the
Company may not qualify as reserves, as defined in the SEC's Industry Guide 7. For the above reasons, information contained in
this news release or in documents described in this news release that describes the Company's mineral reserve and resource
estimates or that describes the results of pre-feasibility or other studies is not comparable to similar information made public
by U.S. companies subject to the reporting and disclosure requirements of the SEC.
Non-IFRS Measures
This news release includes certain terms or performance measures commonly used in the mining industry that are not defined
under International Financial Reporting Standards ("IFRS"), including "cash operating costs", "all-in sustaining costs" and
"adjusted net income". Non-IFRS measures do not have any standardized meaning prescribed under IFRS, and therefore they may not
be comparable to similar measures employed by other companies. The data presented is intended to provide additional information
and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS and
should be read in conjunction with B2Gold's consolidated financial statements. Readers should refer to B2Gold's management
discussion and analysis, available under B2Gold's corporate profile at www.sedar.com or on its website at www.b2gold.com, under the heading "Non-IFRS Measures" for a more detailed discussion of how
B2Gold calculates such measures and a reconciliation of these measures to IFRS terms.
B2GOLD CORP.
CONDENSED INTERIM CONSOLIDATED STATEMENTS OF OPERATIONS
FOR THE THREE AND NINE MONTHS ENDED SEPTEMBER 30
(Expressed in thousands of United States dollars, except per share amounts)
(Unaudited)
|
|
|
|
|
|
|
|
|
|
For the three
months ended
Sept. 30, 2016 |
|
For the three
months ended
Sept. 30, 2015 |
|
For the nine
months ended
Sept. 30, 2016 |
|
For the nine
months ended
Sept. 30, 2015 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Gold revenue |
$ |
193,049 |
|
$ |
139,250 |
|
$ |
502,104 |
|
$ |
414,648 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Cost of sales |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Production costs |
|
(69,942 |
) |
|
(75,250 |
) |
|
(197,732 |
) |
|
(229,169 |
) |
|
Depreciation and depletion |
|
(44,234 |
) |
|
(35,749 |
) |
|
(117,485 |
) |
|
(103,552 |
) |
|
Royalties and production taxes |
|
(7,840 |
) |
|
(5,347 |
) |
|
(19,261 |
) |
|
(16,103 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total cost of sales |
|
(122,016 |
) |
|
(116,346 |
) |
|
(334,478 |
) |
|
(348,824 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Gross profit |
|
71,033 |
|
|
22,904 |
|
|
167,626 |
|
|
65,824 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
General and administrative |
|
(8,137 |
) |
|
(8,770 |
) |
|
(23,799 |
) |
|
(28,830 |
) |
Share-based payments |
|
(3,963 |
) |
|
(3,078 |
) |
|
(11,435 |
) |
|
(12,213 |
) |
Impairment of long-lived assets |
|
(9,749 |
) |
|
- |
|
|
(9,749 |
) |
|
- |
|
Write-down of mineral property interests |
|
- |
|
|
(8,117 |
) |
|
(3,867 |
) |
|
(8,117 |
) |
Provision for non-recoverable input taxes |
|
(479 |
) |
|
28 |
|
|
(1,508 |
) |
|
(583 |
) |
Foreign exchange losses |
|
(105 |
) |
|
(1,456 |
) |
|
(1,890 |
) |
|
(4,371 |
) |
Other |
|
(714 |
) |
|
(821 |
) |
|
(4,298 |
) |
|
(2,607 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Operating income |
|
47,886 |
|
|
690 |
|
|
111,080 |
|
|
9,103 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Gain (loss) on fair value of convertible notes |
|
(9,276 |
) |
|
12,513 |
|
|
(52,669 |
) |
|
5,842 |
|
Gain on sale of Bellavista property |
|
- |
|
|
- |
|
|
- |
|
|
2,192 |
|
Community relations |
|
(677 |
) |
|
(1,036 |
) |
|
(2,522 |
) |
|
(2,974 |
) |
Interest and financing expense |
|
(2,293 |
) |
|
(3,062 |
) |
|
(8,225 |
) |
|
(13,029 |
) |
Realized losses on derivative instruments |
|
(3,264 |
) |
|
(891 |
) |
|
(12,511 |
) |
|
(3,439 |
) |
Unrealized gains (losses) on derivative instruments |
|
12,532 |
|
|
(9,190 |
) |
|
2,432 |
|
|
(15,010 |
) |
Write-down of long-term investments |
|
(3 |
) |
|
(3,360 |
) |
|
(185 |
) |
|
(5,215 |
) |
Other |
|
(83 |
) |
|
194 |
|
|
(1,408 |
) |
|
527 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Income (loss) before taxes |
|
44,822 |
|
|
(4,142 |
) |
|
35,992 |
|
|
(22,003 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Current income tax, withholding and other taxes expense |
|
(6,664 |
) |
|
(4,903 |
) |
|
(14,999 |
) |
|
(4,335 |
) |
Deferred income tax (expense) recovery |
|
(2,480 |
) |
|
(4,540 |
) |
|
9,530 |
|
|
(3,690 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Net income (loss) for the period |
$ |
35,678 |
|
$ |
(13,585 |
) |
$ |
30,523 |
|
$ |
(30,028 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Attributable to: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Shareholders of the Company |
$ |
34,923 |
|
$ |
(15,082 |
) |
$ |
32,910 |
|
$ |
(30,005 |
) |
|
Non-controlling interests |
|
755 |
|
|
1,497 |
|
|
(2,387 |
) |
|
(23 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Net income (loss) for the period |
$ |
35,678 |
|
$ |
(13,585 |
) |
$ |
30,523 |
|
$ |
(30,028 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Income (loss) per share (attributable to shareholders of the Company) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Basic |
$ |
0.04 |
|
$ |
(0.02 |
) |
$ |
0.04 |
|
$ |
(0.03 |
) |
|
Diluted |
$ |
0.04 |
|
$ |
(0.02 |
) |
$ |
0.03 |
|
$ |
(0.03 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Weighted average number of common shares outstanding (in thousands) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Basic |
|
948,305 |
|
|
924,101 |
|
|
935,276 |
|
|
921,397 |
|
|
Diluted |
|
970,994 |
|
|
924,101 |
|
|
947,707 |
|
|
921,397 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B2GOLD CORP.
CONDENSED INTERIM CONSOLIDATED STATEMENTS OF CASH FLOWS
FOR THE THREE AND NINE MONTHS ENDED SEPTEMBER 30
(Expressed in thousands of United States dollars)
(Unaudited)
|
|
|
|
|
|
|
|
|
|
For the three
months ended
Sept. 30, 2016 |
|
For the three
months ended
Sept. 30, 2015 |
|
For the nine
months ended
Sept. 30, 2016 |
|
For the nine
months ended
Sept.30, 2015 |
|
|
|
|
|
|
|
|
|
|
Operating activities |
|
|
|
|
|
|
|
|
|
|
|
|
|
Net income (loss) for the period |
$ |
35,678 |
|
$ |
(13,585 |
) |
$ |
30,523 |
|
$ |
(30,028 |
) |
|
Mine restoration provisions settled |
|
(24 |
) |
|
(42 |
) |
|
(122 |
) |
|
(486 |
) |
|
Non-cash charges |
|
57,434 |
|
|
54,250 |
|
|
190,044 |
|
|
151,240 |
|
|
Changes in non-cash working capital |
|
(6,879 |
) |
|
(4,999 |
) |
|
(16,948 |
) |
|
10,869 |
|
|
Proceeds from prepaid sales |
|
- |
|
|
- |
|
|
120,000 |
|
|
- |
|
|
Changes in long-term value added tax receivables |
|
4,107 |
|
|
(1,713 |
) |
|
5,976 |
|
|
(4,706 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Cash provided by operating activities |
|
90,316 |
|
|
33,911 |
|
|
329,473 |
|
|
126,889 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Financing activities |
|
|
|
|
|
|
|
|
|
|
|
|
|
Credit facility, drawdowns net of transaction costs |
|
- |
|
|
24,881 |
|
|
50,000 |
|
|
193,735 |
|
|
Repayment of credit facility) |
|
(25,000 |
) |
|
- |
|
|
(125,000 |
) |
|
(150,000 |
) |
|
Otjikoto equipment loan facility, drawdowns net of transaction costs |
|
- |
|
|
- |
|
|
11,043 |
|
|
3,883 |
|
|
Repayment of Otjikoto equipment loan facility |
|
- |
|
|
(1,716 |
) |
|
(3,823 |
) |
|
(5,149 |
) |
|
Repayment of Nicaraguan equipment loans |
|
(423 |
) |
|
(385 |
) |
|
(1,355 |
) |
|
(1,137 |
) |
|
Interest and commitment fees paid |
|
(2,301 |
) |
|
(1,527 |
) |
|
(12,101 |
) |
|
(8,665 |
) |
|
Common shares issued for cash, net of share issuance costs |
|
55,197 |
|
|
- |
|
|
61,992 |
|
|
540 |
|
|
Restricted cash movement |
|
(203 |
) |
|
1,052 |
|
|
(1,372 |
) |
|
652 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Cash provided (used) by financing activities |
|
27,270 |
|
|
22,305 |
|
|
(20,616 |
) |
|
33,859 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Investing activities |
|
|
|
|
|
|
|
|
|
|
|
|
|
Expenditures on mining interests: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Otjikoto Mine, development and sustaining capital |
|
(7,523 |
) |
|
(8,284 |
) |
|
(33,849 |
) |
|
(27,817 |
) |
|
|
Masbate Mine, development and sustaining capital |
|
(4,911 |
) |
|
(11,870 |
) |
|
(22,261 |
) |
|
(27,936 |
) |
|
|
Libertad Mine, development and sustaining capital |
|
(2,287 |
) |
|
(2,385 |
) |
|
(13,987 |
) |
|
(13,867 |
) |
|
|
Limon Mine, development and sustaining capital |
|
(2,328 |
) |
|
(5,567 |
) |
|
(5,289 |
) |
|
(16,771 |
) |
|
|
Fekola Project, development |
|
(64,180 |
) |
|
(39,365 |
) |
|
(161,619 |
) |
|
(39,365 |
) |
|
|
Gramalote Project, prefeasibility and exploration |
|
(1,990 |
) |
|
(1,631 |
) |
|
(4,806 |
) |
|
(8,419 |
) |
|
|
Other exploration and development |
|
(10,539 |
) |
|
(8,825 |
) |
|
(23,372 |
) |
|
(60,450 |
) |
|
Purchase of non-controlling interest |
|
- |
|
|
- |
|
|
(6,000 |
) |
|
(6,138 |
) |
|
Acquisition of rights |
|
- |
|
|
- |
|
|
- |
|
|
(4,000 |
) |
|
Other |
|
168 |
|
|
374 |
|
|
807 |
|
|
1,217 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Cash used by investing activities |
|
(93,590 |
) |
|
(77,553 |
) |
|
(270,376 |
) |
|
(203,546 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Increase (decrease) in cash and cash equivalents |
|
23,996 |
|
|
(21,337 |
) |
|
38,481 |
|
|
(42,798 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Effect of exchange rate changes on cash and cash equivalents |
|
(40 |
) |
|
(1,596 |
) |
|
134 |
|
|
(2,981 |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Cash and cash equivalents, beginning of period |
|
99,802 |
|
|
109,718 |
|
|
85,143 |
|
|
132,564 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Cash and cash equivalents, end of period |
$ |
123,758 |
|
$ |
86,785 |
|
$ |
123,758 |
|
$ |
86,785 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B2GOLD CORP.
CONDENSED INTERIM CONSOLIDATED BALANCE SHEETS
(Expressed in thousands of United States dollars)
(Unaudited)
|
|
|
|
|
|
|
As at
September 30,
2016 |
|
As at
December 31,
2015 |
Assets |
|
|
|
|
Current |
|
|
|
|
|
Cash and cash equivalents |
$ |
123,758 |
$ |
85,143 |
|
Accounts receivable and prepaids |
|
9,860 |
|
11,532 |
|
Value-added and other tax receivables |
|
18,703 |
|
20,597 |
|
Inventories |
|
113,972 |
|
86,324 |
|
|
|
|
|
|
|
266,293 |
|
203,596 |
|
|
|
|
|
Assets held for sale |
|
3,218 |
|
- |
|
|
|
|
|
Long-term investments |
|
14,264 |
|
10,163 |
|
|
|
|
|
Value-added tax receivables |
|
21,693 |
|
24,804 |
|
|
|
|
|
Mining interests |
|
|
|
|
|
|
Owned by subsidiaries |
|
1,858,659 |
|
1,723,366 |
|
|
Investments in joint ventures |
|
46,001 |
|
42,394 |
|
|
|
|
|
Other assets |
|
24,005 |
|
20,059 |
|
|
|
|
|
|
|
|
|
|
|
$ |
2,234,133 |
$ |
2,024,382 |
|
|
|
|
|
|
|
|
|
|
Liabilities |
|
|
|
|
Current |
|
|
|
|
|
Accounts payable and accrued liabilities |
$ |
66,960 |
$ |
58,744 |
|
Current taxes payable |
|
8,835 |
|
10,686 |
|
Current portion of long-term debt |
|
18,405 |
|
11,726 |
|
Current portion of derivative instruments at fair value |
|
10,250 |
|
10,618 |
|
Current portion of mine restoration provisions |
|
483 |
|
483 |
|
Current portion of prepaid sales |
|
45,692 |
|
- |
|
Other |
|
783 |
|
6,663 |
|
|
|
|
|
|
|
|
|
|
|
|
151,408 |
|
98,920 |
|
|
|
|
|
Derivative instruments at fair value |
|
16,038 |
|
18,968 |
Long-term debt |
|
430,296 |
|
451,466 |
Prepaid sales |
|
74,308 |
|
- |
Mine restoration provisions |
|
68,568 |
|
63,539 |
Deferred income taxes |
|
59,956 |
|
68,939 |
Employee benefits obligation |
|
7,021 |
|
6,814 |
Other long-term liabilities |
|
4,040 |
|
3,197 |
|
|
|
|
|
|
|
|
|
|
|
|
811,635 |
|
711,843 |
|
|
|
|
|
|
|
|
|
|
Equity |
|
|
|
|
Shareholders' equity |
|
|
|
|
|
|
|
|
|
|
Share capital |
|
|
|
|
|
Issued: 955,743,038 common shares (Dec 31, 2015 - 927,073,436) |
|
2,126,887 |
|
2,036,778 |
|
Contributed surplus |
|
55,733 |
|
70,051 |
|
Accumulated other comprehensive loss |
|
(92,609) |
|
(96,254) |
|
Deficit |
|
(673,981) |
|
(706,891) |
|
|
|
|
|
|
|
1,416,030 |
|
1,303,684 |
|
|
|
|
|
Non-controlling interests |
|
6,468 |
|
8,855 |
|
|
|
|
|
|
|
|
|
|
|
|
1,422,498 |
|
1,312,539 |
|
|
|
|
|
|
|
|
|
|
|
$ |
2,234,133 |
$ |
2,024,382 |
|
|
|
|
|
|
|
|
|
|