TORONTO, ONTARIO--(Marketwired - Feb 7, 2017) - Copper Lake Resources Ltd. (TSX VENTURE:CPL)(FRANKFURT:W0I) ("Copper Lake" or
the "Company") is pleased to announce the Company has completed new plate modelling of VTEM surveys and outlined 6 plate
anomalies in the core Marshall Lake area.
The Company has reviewed the 6 modelled plate anomalies and will focus on 3 which have significant adjacent historical massive
sulphide drill intercepts.
Highlights:
-
VTEM-001 modelled plate at Billiton South is located down dip of hole MAR-07-11 which:
- Intersected 10.20m @ 1.25% Cu, 1.04% Zn, 56g/t Ag & 0.04g/t Au from 115.0m
- Including 4.00m @ 1.93% Cu, 1.73% Zn, 86g/t Ag & 0.07 g/t Au from 124.0m
-
VTEM-003 modelled plate at Teck Hill South was intersected by hole TK-08-09 which:
- Intersected 4.25m @ 3.79% Cu, 0.27 g/t Au, 38g/t Ag from 93.25m; and
- 4.70m @ 2.34% Cu, 0.11g/t Au, 25g/t Ag from 106.5m
-
VTEM-002 modelled plate at Gazooma is located down dip of the following drill holes;
- 4.00m @ 1.73% Cu, 0.27g/t Au, & 34g/t Ag in hole GAZ-07-10 from 89.0m
- 3.00m @ 1.88% Cu, 0.62g/t Au, & 42g/t Ag in hole GAZ-10-15 from 127.0m
- 10.00m @ 1.18% Cu, 0.26g/t Au, & 28g/t Ag in hole GAZ-08-12 from 127.0m
Copper Lake Interim CEO Terry MacDonald stated that, "The 2016 VTEM plate modelling program resulted in 6 key VTEM plate
anomalies. Review of the modelled plates in collaboration with the newly compiled historical drilling database has shown that 3
of modelled VTEM plates (VTEM-001, VTEM-002 and VTEM-003) have adjacent historical drill holes which intersected significant
copper-zinc-silver-gold mineralization. The 3 selected plates all remain open at depth and present themselves as drill ready
targets.
It is the Company's intention to drill test these high priority targets as soon as possible and we currently have a plan
to conduct a drilling program that will consist of a minimum of 3,000 metres of drilling."
2016 Database Compilation work
During 2016 Copper Lake completed a data base compilation of all historical exploration work on the Marshall Lake project area
including drilling, surface sampling and geophysical VTEM, IP and magnetic surveys. This compilation and interpretation resulted
in the plate modelling of 6 VTEM anomalies within the core Marshall Lake area. The compilation and review of historical drilling
has shown that 3 of the plates have adjacent drill holes hosting significant copper-zinc-gold-silver mineralization corresponding
with extensions of the modelled plates.
All plates modelled occur within the main mineralized horizon occurring within the Marshall Lake area associated with a felsic
tuff package of volcaniclastic units. The location of the other modelled plates and occurrence of other copper mineralized zones
historically intersected in drill holes is being reviewed.
VTEM-001: South Billiton Zone
VTEM plate modelling showed an east dipping plate in the South Billiton area where the main modelled plate corresponds with
the down dip extensions of massive sulphide mineralization intersected in hole MAR-07-11 hosted within a felsic tuffaceous
volcaniclastic package (see Figure 2). Historical drilling completed in 2007 drilled over the top of the plate and intersected
massive sulphide lenses containing up to 4.0m @ 1.93% Cu, 1.73% Zn, 86g/t Ag and 0.07g/t Au at a depth of 124.0m (Table 1).
Table 1: Billiton South: VTEM-001 Significant Drill Intercepts
Hole # |
|
From (m) |
|
To (m) |
|
Width (m) |
|
Cu (%) |
|
Zn (%) |
|
Ag (g/t) |
|
Au (g/t) |
MAR-07-11 |
|
115.0m |
|
128.20m |
|
10.20m |
|
1.25% |
|
1.04% |
|
56 |
|
0.04 |
Includes |
|
124.0m |
|
128.0m |
|
4.0m |
|
1.93% |
|
1.73% |
|
86 |
|
0.07 |
Intercepts are calculated using a 0.5% Cu cut-off grade, maximum 1m internal dilution and no top capping.
Intercepts are drill widths.
VTEM-003: Teck Hill South Zone
VTEM plate modelling of anomalies in the Teck Hill South area showed a shallow east dipping plate where the main modelled
plate corresponds with the lower of two zones of massive sulphide mineralization intersected in hole TK-08-09. The massive
sulphide zones intersected are hosted within an east dipping felsic tuffaceous volcaniclastic package (see Figure 3). Historical
drilling completed in 2008 drilled into the upper extensions of the plate and intersected massive sulphide lenses containing up
to 4.25m @ 3.79% Cu, 1.04% Zn, 56g/t Ag and 0.04g/t Au at a depth of 93.25m and a second zone at a depth of 106.50m hosting 4.70m
@ 2.34% Cu, 25g/t Ag and 0.11g/t Au. A number of historical holes tested the felsic unit above the modelled plated but were too
shallow to test the main zone of mineralization or the VTEM plate.
Table 3: Teck Hill South Zone: VTEM-003 Historical Significant Drill Results
Hole # |
|
From (m) |
|
To (m) |
|
Width (m) |
|
Cu (%) |
|
Zn (%) |
|
Ag (g/t) |
|
Au (g/t) |
TK-08-09 |
|
93.25m |
|
97.50m |
|
4.25m |
|
3.79% |
|
1.04% |
|
56 |
|
0.04 |
TK-08-09 |
|
106.50m |
|
111.20m |
|
4.70m |
|
2.34% |
|
NSR |
|
25 |
|
0.11 |
Intercepts are calculated using a 0.5% Cu cut-off grade, maximum 1m internal dilution and no top capping.
Intercepts are drill widths
VTEM-002: Gazooma Zone VTEM Plate Modelling
Plate modelling of the VTEM-002 anomaly at Gazooma showed a gently east dipping plate down dip of several mineralized
intercepts intersected in historical drilling (see Figure 4). Massive sulphide intercepts intersected up dip of the modelled
plate intersected zones of 4.0m @ 1.73% Cu, 0.27g/t Au, and 34g/t Ag in holes GAZ-07-10, 3.0m @ 1.88% Cu, 0.62g/t Au, & 42g/t Ag
in hole GAZ-10-15 and 10.0m @ 1.18% Cu, 0.26g/t Au, & 28g/t Ag in hole GAZ-08-12. The VTEM-002 modelled plate represents down dip
extensions of these zones of mineralization. Historical significant results from drilling above the plate are listed in Table 3.
A number of relatively shallow historical holes have tested the tuffaceous felsic volcaniclastic unit located above the VTEM
plate. However, the main modelled plate remains untested and is one of the 3 priority drill targets.
Table 3: VTEM-002 Plate: Gazooma Zone Significant Drill Results
Hole # |
|
From (m) |
|
To (m) |
|
Width (m) |
|
Cu (%) |
|
Ag (g/t) |
|
Au (g/t) |
GAZ-07-10 |
|
89.00 |
|
93.00 |
|
4.00m |
|
1.73% |
|
34 |
|
0.27 |
GAZ-08-12 |
|
127.00 |
|
137.00 |
|
10.00m |
|
1.18% |
|
28 |
|
0.26 |
GAZ-10-15 |
|
127.00 |
|
130.00 |
|
3.00m |
|
1.88% |
|
42 |
|
0.62 |
Intercepts are calculated using a 0.5% Cu cut-off grade, maximum 1m internal dilution and no top capping.
Intercepts are drill widths.
VTEM Surveys and Plate Modelling
Plate modelling and interpretation was conducted by Jenna McKenzie, P.Geo of Ronacher McKenzie Geoscience with assistance from
Winnie Pun, P.Eng who conducted the modelling using EMIT software Maxwell. Bob Lo P.Eng advised and reviewed all of the models.
The modelling was performed on 2 Versatile Time-Domain Electromagnetic ("VTEM") surveys flown by Geotech Ltd in 2007. Survey 7014
covers the central portion of Marshall Lake and consists of 178.9 line-km flown at 150m line spacing covering 22.8sq.km and
Survey 7083 covers the surrounding area consisting of 1,308 line-km flown at 150m line spacing covering 196.5 sq.km.
QA/QC Procedures
For the 2007 to 2010 drilling, half core was cut, sampled and shipped to the ALS-Chemex sample preparation facility in Thunder
Bay. The prepared pulp was assayed for Au by fire assay, and base metals by multi-element ICP by ALS-Chemex in Vancouver.
Certified standards were routinely inserted and pulp repeat assays performed. Preparation and assaying was performed to industry
standards.
The content of this press release has been reviewed by Gary O'Connor, MAusIMM, a director of Copper Lake Resources
About Copper Lake Resources
Copper Lake Resources Ltd. is a publicly traded Canadian company currently focused on advancing two significant
properties located in Ontario, Canada:
- The Marshall Lake VMS copper, zinc, silver and gold property is an advanced exploration stage property located 120 km north
of Geraldton, Ontario via good all weather gravel road from the Trans-Canada Highway and just 22 km north of the main CNR rail
line.
Copper Lake currently has a 68.75% interest in the property and has the option to increase its interest to 75% by incurring
additional expenditures of $670,000 by July 15, 2017. The Company can further increase its interest to 87.5% by taking the
project to bankable feasibility stage.
- The Norton Lake nickel, copper, PGM property (69.79%) is located approximately 100 km north of the Marshall Lake
property.
On behalf of Copper Lake Resources Ltd.
Terrence MacDonald
Interim CEO
The TSX Venture Exchange has not reviewed this news release and does not accept responsibility for the
adequacy or accuracy of this release. This news release includes certain statements that may be deemed "forward-looking
statements". All statements, other than statements of historical facts, that address such matters as future exploration,
drilling, exploration activities, potential mineralization and resources and events or developments that the Company expects, are
forward looking statements and, as such, are subject to risks, uncertainties and other factors of which are beyond the reasonable
control of the Company. Although the Company believes the expectations expressed in such forward-looking statements are based on
reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ
materially from those in forward-looking statements. Factors that could cause actual results to differ materially from those in
forward-looking statements include such matters as market prices, exploitation and exploration results, continued availability of
capital and financing, and general economic, market or business conditions. Any forward-looking statements are expressly
qualified in their entirety by this cautionary statement. The information contained herein is stated as of the current date and
subject to change after that date.
To view Figures 1-4 please click the following link: http://media3.marketwire.com/docs/CopperLakeFigs1-4.pdf