TORONTO, ONTARIO--(Marketwired - May 3, 2017) - Kirkland Lake Gold Ltd. ("Kirkland Lake Gold" or the
"Company") (TSX:KL)(OTCQX:KLGDF) is pleased to report continued high-grade drill results from underground
drilling at Fosterville Mine in Australia. Underground definition drilling continues to infill and target down-plunge extensions
of the Lower Phoenix and Harrier South gold systems to increase Mineral Resource confidence and assess the potential of further
Mineral Reserve expansion (see Figure 1).
Recent drill results returned from 59 underground holes totaling 14,070 meters ("m") into extensions of the Lower Phoenix gold
system continue to return some of the highest gold grades seen at Fosterville. Results continue to demonstrate the continuity of
exceptional high-grade mineralization with visible gold on both the newly discovered west dipping Lower Phoenix Footwall and
Eagle Structures in the Lower Phoenix gold system.
Similarly, a drill program consisting of 20 holes, totaling 7,791m in the Harrier South gold system reaffirms the increasing
grade tenor of the Harrier Mineral Reserve at depth.
Underground Drilling Highlights at Fosterville Mine
-
Lower Phoenix Footwall mineralization continues to demonstrate high-grade continuity with the return of the following
infill definition drill intercepts:
- 381 g/t Au (1) over 2.8m (Estimated True Width "ETW" 2.5m),
including 1,062 g/t Au (1) over 1.0m (ETW 0.9m) in hole
UDH1982
- 345 g/t Au (1) over 7.0m (ETW 6.4m), including
4,550 g/t Au (1) over 0.5m (ETW 0.4m) in hole UDH1991
- 645 g/t Au (1) over 1.3m (ETW 1.1m) in hole UDH1978
-
Eagle high-grade mineralization continues to demonstrate high-grade continuity with the return of the following
infill definition drill intercepts:
- 404 g/t Au (1) over 16.0m (ETW 7.5m), including 12,039 g/t
Au (1) over 0.4m (ETW 0.2m) in hole UDH1970
- 274 g/t Au (1) over 9.7m (ETW 9.2m), including 498 g/t Au
(1) over 1.3m (ETW 1.1m) in hole UDH1946B
- 399 g/t Au (1) over 3.6m (ETW 1.0m), including 2,036 g/t
Au (1) over 0.7m (ETW 0.2m) in hole UDH1865A
- 69 g/t Au (1) over 30.7m (ETW 29.3m) in hole UDH1946
-
Drilling on the Harrier Base Structure continues to return high-grade mineralization including:
- 25.6 g/t Au (1) over 3.85m (ETW 3.7m) in hole
UDH1987
- 10.1 g/t Au over 10.55m (ETW 10.1m) in hole UDH1913
- Infill drilling into Harrier Base mineralization continues to demonstrate high-grade continuity
(1) |
Visible gold present in drill intercept, all drill results are presented in Table 1 |
Mr. Tony Makuch, President and Chief Executive Officer, Kirkland Lake Gold commented: "The Fosterville Mine continues to
provide exceptional results from drilling programs on the Lower Phoenix and Harrier South gold systems, with many intercepts
returning significantly higher grades than our December 2016 average underground Mineral Reserve of 9.8 g/t Au."
"We are excited about the grade upside potential of the Fosterville deposit. Recent infill drilling into the Lower Phoenix
Footwall and Harrier Base structures have increased both geological and grade confidence in these zones and has reaffirmed an
increasing grade profile with depth. In addition, continued strong drill results combined with positive grade reconciliation of
mining the Eagle structure has provided the Company greater insight into the high-grade nature of the ore body. Mining in this
area has largely contributed to the recent strong first quarter operating results, producing a record 46,083 ounces of gold,
driven by a record run of mine grade of 12.3 g/t Au."
"We are optimistic that significant Mineral Resource and Mineral Reserve growth can be realized by both expansion of these
mineralized structures through additional drilling and reassessment of existing data sets based on increasing levels of
confidence and reconciliation data."
2017 Underground Definition Programs at Fosterville Gold Mine
Lower Phoenix Gold System Underground Resource Definition Drilling Program
Since the January 17,
2017 Kirkland Lake Gold News Release, drilling from 3 diamond drill rigs have continued to focus on resource definition and
understanding of multiple gold targets including the Lower Phoenix Footwall (LPFW) and Eagle Faults. Reported drill results from
59 holes (14,070m) are from intercepts through the Lower Phoenix Footwall and Eagle resource target areas. Mining production
continues on the upper-plunge areas of the Lower Phoenix gold system structures including the high-grade Eagle Fault, which has
largely contributed to Fosterville's record run of mine grade of 12.3 g/t during Q1 2017.
All drill assay intercepts are provided in Table 1 and drill collars in Table 2.
Lower Phoenix Footwall Structure
Infill drilling into the newly discovered west dipping Lower Phoenix Footwall Structure continues to return extremely
high-grade results including of 381 g/t Au (1) over 2.8m (Estimated True
Width "ETW" 2.5m), (Including 1,062 g/t Au (1) over 1.0m [ETW 0.9m]) in
hole UDH1982, 345 g/t Au (1) over 7.0m (ETW 6.4m), (Including 4,550 g/t
Au (1) over 0.5m [ETW 0.4]) in hole UDH1991, and 645 g/t
Au (1) over 1.3m (ETW 1.1m) in hole UDH1978 and 187 g/t Au
(1) over 4.0m (ETW 3.6m) in hole UDH1946 (see Figure 2). These results strongly
support drill results in the January 17, 2017 Kirkland Lake Gold
News Release which included the Fosterville Mine record drill intercept of 1,429 g/t Au
(1) over 15.15m (Estimated True Width "ETW" 4.97m) in hole UDH1817
(Including 21,490 g/t Au (1) over 0.6m [ETW
0.24m]). The repeatability of high-grade results on this structure, at close drill spacing provides increased confidence
that there is a coherent, extremely high-grade lode of mineralization. Additional high-grade results have been
returned on this structure including 14.7 g/t Au over 11.1m (ETW 9.1m) in hole UDH2023 and 15.2 g/t
Au (1) over 10.3m (ETW 7.7m) in hole UDH1992 outside December 2016 Measured
and Indicated Mineral Resources. This structure has now been defined over a strike extent of 210m and vertical extent of 180m.
The mineralized zone appears to adjoin the high-grade Eagle structure at its lower edge and is untested down-plunge. Continued
drilling from the hangingwall drill platforms during 2017 will continue to advance the understanding and scale of this attractive
resource growth target.
Eagle Structure
Recent drilling continues to return significant high-grade gold intercepts containing significant amounts of visible gold.
Recent drill results into the Eagle Fault include 404 g/t Au (1) over 16.0m
(ETW 7.5m), (Including 12,039 g/t Au (1) over 0.4m [ETW 0.2m]) in hole
UDH1970, 274 g/t Au (1) over 9.7m (ETW 9.2m), (Including 498 g/t Au
(1) over 1.3m [ETW 1.1m]) in hole UDH1946B and 399 g/t Au
(1) over 3.6m (ETW 1.0m), (Including 2,036 g/t Au (1)
over 0.7m [ETW 0.2m]) in hole UDH1865A (Figure 3). These results continue to confirm the
continuity and high-grade tenor of the Eagle Fault.
Q1 run of mine grade of 12.3 g/t Au provides confirmation of the high-grade nature of the Eagle Fault which is particularly
endowed with visible gold mineralization at its intersection with the Lower Phoenix and East Dipping Faults. Reconciled
production data significantly outperformed grade estimates in this zone during the quarter with two stoping blocks (over 6,500t
each) reconciling grades above 40 g/t Au.
The Eagle fault remains open down plunge south of 6350mN and drilling during 2017 will continue to focus on extension and
infill definition of this highly mineralized structure.
Harrier South Gold System Underground Resource Definition Drilling Program
Since the January 17,
2017 Kirkland Lake Gold News Release, drilling from 1 diamond rig has continued to focus on resource definition and
understanding of multiple gold targets including the Harrier Base Fault in the Harrier South gold system. Reported drill results
from 20 holes (7,791.1m) are from intercepts though the Harrier Base resource target area.
All drill assay intercepts are provided in Table 1 and drill collars in Table 2.
Harrier Base Structure
Drilling on the Harrier Base Structure continues to return high-grade mineralization. Key intercepts include 25.6 g/t
Au (1) over 3.9m (ETW 3.7m) in hole UDH1987, 15.5 g/t Au
(1) over 2.4m (ETW 2.3m), (Including 80.6 g/t Au (1)
over 0.3m [ETW 0.3m]) in hole UDH1984, 11.9 g/t Au over 6.8m (ETW 6.8m), (Including
54.1 g/t Au over 0.6m [ETW 0.5m]) in hole UDH1921 and 10.1 g/t Au over 10.6m (ETW
10.1m) in hole UDH1913 (Figure 4). Decline development has recently commenced to access high-grade Harrier Base
mineralization, which forms part of the December 2016 Mineral Reserve estimate, with the aim to add an alternative production
source to the Lower Phoenix mineralized zone during 2018.
Planned drilling for 2017 will test the down plunge extensions of the Harrier Base structure to 4650mN, approximately 100m
beyond the current extent of drilling.
(1) |
Visible gold present in drill intercept, ETW - Estimated True Width, all drill results are presented in
Table 1 |
To view a PDF of the tables and figures as referenced in this News Release, visit the links below:
http://media3.marketwire.com/docs/newmarket_gold_May01_tables1-2.pdf
- tables
http://file.marketwire.com/release/1093548_Figures1-4.pdf -
figures
Qualified Persons
Troy Fuller, MAIG, Geology Manager, Fosterville Gold Mine, is a "qualified person" as such term is defined in National
Instrument 43-101 and has reviewed and approved the technical information and data included in this News Release.
QAQC information is provided at the bottom of Table 1.
About Kirkland Lake Gold Ltd.
Kirkland Lake Gold Ltd. is a mid-tier gold producer targeting 500,000 to 525,000 ounces in Tier 1 mining jurisdictions of
Canada and Australia. The production profile of the company is anchored from two high-grade, low-cost operations, including the
Macassa Mine located in Northeastern Ontario and the Fosterville Mine located in the state of Victoria, Australia. Kirkland Lake
Gold's solid base of quality assets is complemented by district scale exploration potential, supported by a strong financial
position with extensive management and operational expertise.
For further information on Kirkland Lake Gold and to receive news releases by email, visit the website www.klgold.com.
Cautionary Note Regarding Forward-Looking Information
This press release contains statements which constitute "forward-looking information" within the meaning of applicable
securities laws, including statements regarding the plans, intentions, beliefs and current expectations of KL Gold with respect
to future business activities and operating performance. Forward-looking information is often identified by the words "may",
"would", "could", "should", "will", "intend", "plan", "anticipate", "believe", "estimate", "expect" or similar expressions and
include information regarding: (i) the potential to expand mineral resources and mineral reserves at the Fosterville Gold Mine;
(ii) the potential for a high grade independent mining front to the Lower Phoenix South mining area;
Investors are cautioned that forward-looking information is not based on historical facts but instead reflect KL Gold's
management's expectations, estimates or projections concerning future results or events based on the opinions, assumptions and
estimates of management considered reasonable at the date the statements are made. Although Kirkland Lake Gold believes that the
expectations reflected in such forward-looking information are reasonable, such information involves risks and uncertainties, and
undue reliance should not be placed on such information, as unknown or unpredictable factors could have material adverse effects
on future results, performance or achievements of the combined company. Among the key factors that could cause actual results to
differ materially from those projected in the forward-looking information are the following: the ability of Kirkland Lake Gold to
successfully integrate the operations and employees of its Canadian and Australian operations, and realize synergies and cost
savings, and to the extent, anticipated; the potential impact on exploration activities; the potential impact on relationships,
including with regulatory bodies, employees, suppliers, customers and competitors; the re-rating potential following the
consummation of the merger; changes in general economic, business and political conditions, including changes in the financial
markets; changes in applicable laws; and compliance with extensive government regulation. This forward-looking information may be
affected by risks and uncertainties in the business of Kirkland Lake Gold and market conditions. This information is qualified in
its entirety by cautionary statements and risk factor disclosure contained in filings made by Kirkland Lake Gold, including
Kirkland Lake Gold's annual information form, financial statements and related MD&A for the fourth quarter and full year
ended December 31, 2016 and their interim financial reports and related MD&A for the period ended December 31, 2016 filed
with the securities regulatory authorities in certain provinces of Canada and available at www.sedar.com .
Should one or more of these risks or uncertainties materialize, or should assumptions underlying the forward-looking
information prove incorrect, actual results may vary materially from those described herein as intended, planned, anticipated,
believed, estimated or expected. Although KL Gold has attempted to identify important risks, uncertainties and factors which
could cause actual results to differ materially, there may be others that cause results not to be as anticipated, estimated or
intended. KL Gold does not intend, and do not assume any obligation, to update this forward-looking information except as
otherwise required by applicable law.
Table 1: Drill Assay Intercepts for Underground Diamond Drilling at Fosterville Gold
Mine. |
Hole ID |
From
(m) |
To
(m) |
Downhole Interval
(m) |
Estimated True Width (m) |
Gold Grade
(g/t Au) |
Geological Structure |
Eagle |
|
|
|
|
|
|
UDH1970 (1) |
113.2 |
129.2 |
16 |
7.5 |
404 |
Eagle |
Including (1) |
127 |
127.4 |
0.4 |
0.2 |
12039 |
Eagle |
UDH1946B (1) |
106.2 |
115.9 |
9.7 |
9.2 |
274 |
Eagle |
Including (1) |
108.8 |
110.1 |
1.3 |
1.1 |
498 |
Eagle |
UDH1946 (1) |
106.3 |
137.0 |
30.7 |
29.3 |
69.0 |
Eagle |
UDH1891 (1) |
29.7 |
48.9 |
19.15 |
7.0 |
169 |
Eagle |
Including (1) |
37.6 |
39.4 |
1.8 |
0.7 |
1706 |
Eagle |
UDH1893 (1) |
14.6 |
35.4 |
20.75 |
11.6 |
83.4 |
Eagle |
Including (1) |
33 |
35.0 |
2 |
1.0 |
679 |
Eagle |
And (1) |
34.25 |
34.6 |
0.35 |
0.2 |
2497 |
Eagle |
UDH1895 (1) |
6.45 |
24.7 |
18.2 |
13.2 |
71.9 |
Eagle |
Including (1) |
23.9 |
24.3 |
0.4 |
0.3 |
1230 |
Eagle |
UDH1796 (1) |
101.2 |
145.9 |
44.7 |
32.1 |
17.2 |
Eagle |
UDH1865A (1) |
442 |
445.6 |
3.6 |
1.0 |
399 |
Eagle |
Including (1) |
442 |
442.7 |
0.7 |
0.2 |
2036 |
Eagle |
UDH1970 (1) |
148.6 |
158.9 |
10.3 |
4.0 |
53.8 |
Eagle |
UDH1884 (1) |
89.2 |
96.7 |
7.45 |
2.9 |
35.9 |
Eagle |
UDH1802 |
144.55 |
159.0 |
14.45 |
11.1 |
9.2 |
Eagle |
UDH1797 (1) |
109 |
123.1 |
14.1 |
8.0 |
12.8 |
Eagle |
UDH1891 |
0 |
5.0 |
5 |
3.0 |
29.4 |
Eagle |
UDH1885 (1) |
105.4 |
123.1 |
17.7 |
1.9 |
42.4 |
Eagle |
Including (1) |
107.8 |
109.3 |
1.5 |
0.2 |
145 |
Eagle |
And (1) |
120.7 |
123.1 |
2.4 |
0.3 |
114 |
Eagle |
UDH1946 (1) |
141.5 |
165.8 |
24.3 |
6.9 |
10.1 |
Eagle |
UDH1802 |
133.4 |
142.6 |
9.15 |
7.9 |
8.7 |
Eagle |
UDH1892 (1) |
30.85 |
38.1 |
7.25 |
3.2 |
20.5 |
Eagle |
UDH1951A |
414.65 |
417.7 |
3
.05 |
2.2 |
23.4 |
Eagle |
Including |
416.85 |
417.3 |
0.4 |
0.3 |
153 |
Eagle |
UDH1858 |
434.5 |
443.1 |
8.55 |
5.0 |
9.7 |
Eagle |
UDH1803 |
128.4 |
140.6 |
12.2 |
8.2 |
5.1 |
Eagle |
Hole ID |
From
(m) |
To
(m) |
Downhole Interval (m) |
Estimated True Width (m) |
Gold Grade
(g/t Au) |
Geological Structure |
UDH1894 |
28.2 |
36.5 |
8.3 |
6.9 |
5.7 |
Eagle |
UDH1975 |
145.2 |
152.8 |
7.6 |
7.3 |
4.6 |
Eagle |
UDH1918B (1) |
383.25 |
385.5 |
2.2 |
1.6 |
20.2 |
Eagle |
UDH1971 |
247.5 |
251.6 |
4.1 |
4.0 |
7.5 |
Eagle |
UDH1887 |
139.75 |
152.9 |
13.15 |
2.3 |
11.1 |
Eagle |
UDH1946B |
126 |
128.1 |
2.1 |
2.0 |
12.0 |
Eagle |
UDH1967 |
164.65 |
168.0 |
3.35 |
1.4 |
17.3 |
Eagle |
UDH1970 |
130.8 |
145.7 |
14.9 |
4.9 |
4.4 |
Eagle |
UDH1951 |
438.75 |
440.8 |
2 |
1.1 |
18.3 |
Eagle |
UDH1885 |
125 |
136.0 |
11 |
1.5 |
13.5 |
Eagle |
UDH1969 |
144.9 |
147.0 |
2.1 |
1.9 |
10.0 |
Eagle |
UDH1969 |
121 |
128.2 |
7.15 |
6.2 |
2.9 |
Eagle |
UDH1802 |
127.65 |
131.2 |
3.55 |
3.1 |
5.8 |
Eagle |
UDH1971 |
223.8 |
228.0 |
4.2 |
2.5 |
7.1 |
Eagle |
UDH2007 |
218.35 |
219.9 |
1.55 |
1.2 |
12.5 |
Eagle |
UDH1891 |
20.25 |
27.6 |
7.35 |
4.6 |
3.3 |
Eagle |
UDH1866 |
452.85 |
459.0 |
6.15 |
3.0 |
4.3 |
Eagle |
UDH1892 |
40.2 |
45.0 |
4.75 |
1.9 |
6.3 |
Eagle |
UDH1893 |
0.05 |
4.2 |
4.1 |
3.2 |
3.6 |
Eagle |
UDH1969 |
138.35 |
140.7 |
2.35 |
2.2 |
5.2 |
Eagle |
UDH1918A (1) |
384.4 |
385.0 |
0.6 |
0.4 |
28.1 |
Eagle |
UDH1926 |
199.9 |
203.0 |
3.1 |
3.1 |
3.5 |
Eagle |
UDH1892 |
53.25 |
66.4 |
13.15 |
2.9 |
3.3 |
Eagle |
UDH1972 |
220.85 |
222.9 |
2 |
1.5 |
6.0 |
Eagle |
UDH1892 |
22.4 |
25.7 |
3.3 |
2.0 |
4.6 |
Eagle |
UDH1918 |
382.55 |
385.3 |
2.75 |
2.1 |
4.2 |
Eagle |
UDH1975 |
134 |
137.8 |
3.8 |
2.4 |
3.6 |
Eagle |
UDH1866 |
470 |
472.0 |
2 |
1.4 |
6.3 |
Eagle |
UDH1918A |
395.3 |
398.6 |
3.25 |
2.2 |
3.6 |
Eagle |
UDH1892 |
11.9 |
19.1 |
7.15 |
1.3 |
6.0 |
Eagle |
UDH1895 |
1.45 |
3.7 |
2.2 |
2.1 |
3.6 |
Eagle |
UDH1975 |
128.85 |
132.9 |
4 |
2.5 |
3.0 |
Eagle |
Hole ID |
From
(m) |
To
(m) |
Downhole Interval
(m) |
Estimated True Width (m) |
Gold Grade
(g/t Au) |
Geological Structure |
UDH1892 |
75.85 |
83.9 |
8 |
1.2 |
6.1 |
Eagle |
UDH1891 |
12.1 |
15.0 |
2.9 |
1.8 |
3.8 |
Eagle |
UDH1893 |
9.5 |
12.8 |
3.3 |
2.6 |
2.4 |
Eagle |
UDH1918B |
377.75 |
380.6 |
2.8 |
2.0 |
2.7 |
Eagle |
UDH1880 |
1.15 |
3.2 |
2 |
1.7 |
3.1 |
Eagle |
UDH1966 |
144.8 |
147.7 |
2.9 |
1.0 |
4.5 |
Eagle |
UDH1969 |
133.55 |
134.7 |
1.15 |
1.0 |
4.5 |
Eagle |
UDH1866 |
464.5 |
466.0 |
1.5 |
1.0 |
4.3 |
Eagle |
UDH2034 |
219.1 |
220.9 |
1.75 |
1.7 |
2.5 |
Eagle |
UDH1971 |
239 |
240.6 |
1.55 |
0.9 |
4.1 |
Eagle |
UDH1891 |
8.2 |
10.0 |
1.8 |
1.1 |
3.4 |
Eagle |
UDH1885 |
92.8 |
102.5 |
9.65 |
0.7 |
4.6 |
Eagle |
UDH1892 |
0.05 |
9.5 |
9.45 |
0.6 |
4.9 |
Eagle |
UDH1966 |
151 |
152.8 |
1.8 |
0.6 |
3.5 |
Eagle |
UDH2007 |
NSI |
Eagle |
UDH2019 |
NSI |
Eagle |
UDH1885 |
NSI |
Eagle |
UDH1885 |
NSI |
Eagle |
UDH1801 |
NSI |
Eagle |
Lower Phoenix |
|
|
|
|
|
UDH1991 (1) |
237.05 |
244.0 |
6.95 |
6.4 |
345 |
Lower Phoenix FW |
Including (1) |
241.5 |
242.0 |
0.5 |
0.4 |
4550 |
Lower Phoenix FW |
UDH1982 (1) |
217.55 |
220.4 |
2.8 |
2.5 |
381 |
Lower Phoenix FW |
Including (1) |
217.55 |
218.6 |
1 |
0.9 |
1062 |
Lower Phoenix FW |
UDH1896 (1) |
0.1 |
56.7 |
56.6 |
27.0 |
27.6 |
Lower Phoenix FW |
Including (1) |
31.8 |
32.3 |
0.5 |
0.3 |
1284 |
Lower Phoenix FW |
And (1) |
35.7 |
36.4 |
0.65 |
0.4 |
832 |
Lower Phoenix FW |
UDH1978 (1) |
210.6 |
211.9 |
1.3 |
1.1 |
645 |
Lower Phoenix FW |
UDH1946 |
177 |
181.0 |
4 |
3.6 |
187 |
Lower Phoenix FW |
UDH1995 (1) |
256.9 |
259.7 |
2.75 |
2.6 |
152 |
Lower Phoenix FW |
UDH1994 (1) |
265.3 |
267.5 |
2.15 |
1.9 |
176 |
Lower Phoenix FW |
UDH1967 (1) |
177.3 |
182.1 |
4.8 |
1.8 |
158 |
Lower Phoenix FW |
Including (1) |
177.6 |
178.4 |
0.75 |
0.3 |
941 |
Lower Phoenix FW |
UDH1836 (1) |
413.9 |
417.0 |
3.1 |
2.8 |
85.7 |
Lower Phoenix FW |
Including (1) |
413.9 |
414.7 |
0.8 |
0.7 |
248 |
Lower Phoenix FW |
UDH1973 (1) |
195.2 |
205.5 |
10.3 |
7.3 |
21.3 |
Lower Phoenix FW |
Hole ID |
From
(m) |
To
(m) |
Downhole Interval
(m) |
Estimated True Width (m) |
Gold Grade
(g/t Au) |
Geological Structure |
Including (1) |
197.75 |
198.1 |
0.4 |
0.3 |
322 |
Lower Phoenix FW |
UDH2023 |
282.7 |
293.8 |
11.05 |
9.1 |
14.7 |
Lower Phoenix FW |
UDH1981 (1) |
236.05 |
238.3 |
2.25 |
1.9 |
62.5 |
Lower Phoenix FW |
UDH1992 (1) |
290 |
300.3 |
10.3 |
7.7 |
15.2 |
Lower Phoenix FW |
UDH1953 |
160.1 |
183.0 |
22.9 |
11.2 |
9.7 |
Lower Phoenix FW |
UDH1993 (1) |
270 |
273.2 |
3.15 |
2.7 |
18.4 |
Lower Phoenix FW |
UDH1794 |
110 |
115.2 |
5.2 |
5.2 |
9.6 |
Lower Phoenix FW |
UDH2072 |
209 |
230.8 |
21.8 |
4.6 |
9.9 |
Lower Phoenix FW |
UDH1995 |
237.1 |
242.0 |
4.9 |
4.8 |
6.8 |
Lower Phoenix FW |
UDH2023 |
173.9 |
178.8 |
4.85 |
4.7 |
6.4 |
Lower Phoenix FW |
UDH1610 |
35.55 |
42.2 |
6.65 |
4.8 |
4.2 |
Lower Phoenix FW |
UDH1995 |
170.7 |
175.0 |
4.3 |
4.0 |
4.7 |
Lower Phoenix FW |
UDH1995 |
195.95 |
199.0 |
3.05 |
3.0 |
5.4 |
Lower Phoenix FW |
UDH1797 |
125.7 |
133.4 |
7.7 |
3.7 |
4.2 |
Lower Phoenix FW |
UDH1952 |
219.3 |
226.5 |
7.2 |
2.9 |
5.2 |
Lower Phoenix FW |
UDH1995 |
244 |
247.0 |
3 |
2.9 |
4.4 |
Lower Phoenix FW |
UDH1992 |
303.05 |
306.0 |
2.95 |
2.2 |
5.6 |
Lower Phoenix FW |
UDH2071 |
203.95 |
207.9 |
3.95 |
3.7 |
3.3 |
Lower Phoenix FW |
UDH1634 |
133.25 |
137.6 |
4.35 |
4.2 |
2.8 |
Lower Phoenix FW |
UDH1797 |
135.6 |
137.7 |
2.1 |
2.0 |
5.5 |
Lower Phoenix FW |
UDH1979 (1) |
229.3 |
233.0 |
3.65 |
2.8 |
3.8 |
Lower Phoenix FW |
UDH1991 |
171.95 |
174.6 |
2.6 |
2.5 |
3.6 |
Lower Phoenix FW |
UDH1952 |
213.8 |
216.8 |
3 |
1.2 |
6.9 |
Lower Phoenix FW |
UDH1952 |
235.95 |
237.0 |
1 |
0.9 |
9.2 |
Lower Phoenix FW |
UDH1803 |
153.6 |
158.6 |
5 |
3.5 |
2.2 |
Lower Phoenix FW |
UDH1884 (1) |
109.2 |
110.2 |
1 |
0.2 |
39.7 |
Lower Phoenix FW |
UDH1610 |
27.6 |
29.0 |
1.4 |
1.1 |
4.4 |
Lower Phoenix FW |
UDH1990 |
260 |
261.6 |
1.55 |
1.2 |
3.8 |
Lower Phoenix FW |
UDH1794 |
97.2 |
99.1 |
1.9 |
1.4 |
3.1 |
Lower Phoenix FW |
UDH1953 |
186.35 |
188.1 |
1.75 |
0.9 |
4.4 |
Lower Phoenix FW |
UDH2067 |
31 |
33.9 |
2.85 |
1.4 |
2.6 |
Lower Phoenix FW |
UDH1918 |
349.25 |
350.6 |
1.3 |
1.0 |
3.5 |
Lower Phoenix FW |
UDH1996 |
158.2 |
161.3 |
3.05 |
0.8 |
3.0 |
Lower Phoenix FW |
UDH1970 |
163.7 |
166.9 |
3.2 |
0.8 |
2.9 |
Lower Phoenix FW |
Hole ID |
From
(m) |
To
(m) |
Downhole Interval
(m) |
Estimated True Width (m) |
Gold Grade
(g/t Au) |
Geological Structure |
UDH1887 |
120.8 |
125.3 |
4.5 |
0.8 |
2.7 |
Lower Phoenix FW |
UDH1896 |
NSI |
Lower Phoenix FW |
UDH2072 |
NSI |
Lower Phoenix FW |
UDH2007 |
NSI |
Lower Phoenix FW |
UDH1887 |
NSI |
Lower Phoenix FW |
UDH1886 |
NSI |
Lower Phoenix FW |
UDH1886 |
NSI |
Lower Phoenix FW |
Harrier Base |
|
|
|
|
|
|
UDH1913 |
318.15 |
328.7 |
10.55 |
10.1 |
10.1 |
Harrier Base |
UDH1987 (1) |
399.3 |
403.2 |
3.85 |
3.7 |
25.6 |
Harrier Base |
UDH1921 |
357.55 |
364.4 |
6.8 |
6.8 |
11.9 |
Harrier Base |
Including |
360.2 |
360.8 |
0.6 |
0.5 |
54.1 |
Harrier Base |
UDH1986 |
409.65 |
415.4 |
5.75 |
5.4 |
9.8 |
Harrier Base |
UDH1923 |
365.5 |
373.4 |
7.9 |
7.8 |
5.3 |
Harrier Base |
Including |
366.6 |
368.4 |
1.8 |
1.8 |
11.7 |
Harrier Base |
UDH1984 (1) |
406 |
408.4 |
2.4 |
2.3 |
15.5 |
Harrier Base |
Including(1) |
407.05 |
407.4 |
0.3 |
0.3 |
80.6 |
Harrier Base |
UDH1998A |
356.9 |
362.3 |
5.4 |
5.4 |
6.0 |
Harrier Base |
UDH1828 |
399.55 |
401.5 |
1.95 |
1.9 |
15.0 |
Harrier Base |
UDH1909 |
329.9 |
332.2 |
2.3 |
2.2 |
12.1 |
Harrier Base |
UDH1922A |
352.3 |
356.2 |
3.85 |
3.8 |
6.9 |
Harrier Base |
UDH1920 |
361.3 |
366.6 |
5.25 |
5.2 |
4.7 |
Harrier Base |
UDH1915 |
333.35 |
338.6 |
5.25 |
5.0 |
4.8 |
Harrier Base |
UDH1923A |
370 |
373.3 |
3.3 |
3.2 |
4.2 |
Harrier Base |
UDH1810 |
253.4 |
257.1 |
3.7 |
3.2 |
5.0 |
Harrier Base |
UDH1985 |
429.4 |
433.0 |
3.6 |
3.3 |
3.9 |
Harrier Base |
Including |
432.15 |
433.0 |
0.85 |
0.6 |
12.4 |
Harrier Base |
UDH1997 |
354.95 |
357.5 |
2.55 |
2.5 |
4.4 |
Harrier Base |
UDH2000A |
355.9 |
358.5 |
2.6 |
2.5 |
4.2 |
Harrier Base |
UDH1914 |
343 |
345.5 |
2.5 |
2.4 |
4.2 |
Harrier Base |
UDH1915 |
347.85 |
350.5 |
2.6 |
2.5 |
3.9 |
Harrier Base |
UDH1831 |
295.35 |
296.7 |
1.35 |
1.3 |
5.9 |
Harrier Base |
UDH2000A |
366.15 |
368.6 |
2.4 |
2.3 |
3.0 |
Harrier Base |
UDH1988 |
400.2 |
405.0 |
4.8 |
1.3 |
4.3 |
Harrier Base |
UDH1844 |
NSI |
Harrier Base |
Notes: (1) - Visible gold observed in drill
intercept |
Drill intercepts greater than 30 Gram-Metres (Estimated true width x gold grade) are shown in bold
text |
Drilling and Assay QAQC
Kirkland Lake Gold has in place quality-control systems to ensure best practice in drilling, sampling and analysis of drill
core. All diamond drill hole collars (Table 2) are accurately surveyed using a Leica Total Stations instrument and down-hole
deviations are measured by electronic multi-shot cameras.
Sampling consisted of diamond drill core that was either half core sampled or full core sampled. Half core samples were cut
longitudinally in half with a diamond saw; one-half of the drill-core was sent for assay and the other half retained for
reference. Whole core samples were sent for assay with the pulp retained for reference. Drill core sample
intervals vary between 0.3 and 1.2m in length and were determined from logging of sulphide and visible gold.
Samples containing visible gold or considered likely to contain visible gold were separated from sulphide gold samples and
dispatched independently for assaying. At the laboratory "visible gold" jobs were processed through a single pulverizer and
material barren of gold was crushed before and after each sample to minimize the potential for gold to contaminate successive
samples.
Assay results are based on 25-gram charge fire assays. Mean grades are calculated using a variable lower grade cut-off
(generally 2 g/t Au) and maximum 2m internal dilution. No upper gold grade cut is applied to the data. However, during future
resource work the requirement for assay top cutting will be assessed.
Drill samples were assayed at On Site Laboratories, an independent laboratory in Bendigo, Victoria. The facility is registered
ISO 9001:2008 (CERT-C33510).
Table 2: Underground Diamond Drill Hole Collar Locations, Fosterville Gold
Mine.
Hole ID |
Northing
(m) |
Easting
(m) |
Elevation
(m) |
Collar
Azimuth (°) |
Collar
Plunge (°) |
Depth
(m) |
Definition Drilling |
UDH1610 |
7,010.9 |
1,574.1 |
4,227.9 |
286.8 |
0.9 |
68.9 |
UDH1634 |
7,090.6 |
1,667.0 |
4,291.1 |
284.1 |
-19.8 |
176.7 |
UDH1794 |
6,701.2 |
1,433.5 |
4,187.2 |
80.0 |
10.9 |
146 |
UDH1796 |
6,699.6 |
1,433.2 |
4,187.2 |
106.6 |
13.1 |
152.1 |
UDH1797 |
6,699.7 |
1,433.4 |
4,187.7 |
104.4 |
18.2 |
154.1 |
UDH1801 |
6,646.7 |
1,399.2 |
4,187.2 |
105.6 |
0.5 |
160.3 |
UDH1802 |
6,647.5 |
1,399.3 |
4,187.1 |
99.5 |
-2.8 |
167.9 |
UDH1803 |
6,647.8 |
1,399.3 |
4,187.3 |
91.8 |
5.8 |
180 |
UDH1828 |
4,846.8 |
1,570.9 |
4,633.6 |
105.7 |
-61.4 |
440.6 |
UDH1831 |
4,846.8 |
1,571.0 |
4,633.6 |
100.6 |
-70 |
302.8 |
UDH1836 |
6,518.9 |
1,469.5 |
4,460.1 |
121.5 |
-75.7 |
443.6 |
UDH1844 |
5,133.0 |
1,655.1 |
4,499.6 |
64.7 |
-33 |
230.8 |
UDH1858 |
6,251.4 |
1,799.6 |
4,265.3 |
294.2 |
-47.3 |
521.6 |
UDH1865A |
6,319.7 |
1,757.4 |
4,274.9 |
286.0 |
-43 |
485.8 |
UDH1866 |
6,319.6 |
1,757.3 |
4,274.9 |
281.9 |
-46.4 |
482.8 |
UDH1880 |
6,742.1 |
1,582.4 |
4,238.7 |
105.3 |
-3.5 |
174 |
UDH1884 |
6,778.3 |
1,561.7 |
4,197.5 |
181.2 |
22.3 |
116 |
UDH1885 |
6,778.3 |
1,561.8 |
4,196.7 |
181.9 |
2.3 |
143.9 |
UDH1886 |
6,778.4 |
1,561.9 |
4,196.6 |
177.5 |
-3.7 |
173.9 |
UDH1887 |
6,778.4 |
1,561.5 |
4,196.5 |
190.1 |
-5.1 |
189 |
UDH1891 |
6,703.7 |
1,535.1 |
4,218.5 |
147.4 |
-19.7 |
91.5 |
UDH1892 |
6,703.7 |
1,535.2 |
4,218.7 |
142.9 |
-11.5 |
102.4 |
UDH1893 |
6,703.9 |
1,535.6 |
4,218.4 |
131.3 |
-21 |
80.5 |
UDH1894 |
6,704.3 |
1,536.3 |
4,219.3 |
115.2 |
6.9 |
44.9 |
UDH1895 |
6,704.9 |
1,536.3 |
4,218.4 |
100.3 |
-19.9 |
35.8 |
UDH1896 |
6,703.4 |
1,534.6 |
4,218.8 |
160.6 |
-5.2 |
66.3 |
UDH1909 |
4,948.9 |
1,627.2 |
4,631.6 |
85.9 |
-69.5 |
344.8 |
UDH1913 |
4,949.5 |
1,626.5 |
4,631.6 |
75.9 |
-68.6 |
353.8 |
UDH1914 |
4,948.9 |
1,626.5 |
4,631.6 |
96.4 |
-71.8 |
407.9 |
UDH1915 |
4,949.7 |
1,626.4 |
4,631.7 |
70.7 |
-76.2 |
365.9 |
Hole ID |
Northing
(m) |
Easting
(m) |
Elevation
(m) |
Collar
Azimuth (°) |
Collar
Plunge (°) |
Depth
(m) |
UDH1918 |
6,384.2 |
1,754.9 |
4,286.0 |
286.9 |
-43.5 |
405 |
UDH1918A |
6,384.2 |
1,754.9 |
4,286.0 |
288.6 |
-40.6 |
417 |
UDH1918B |
6,384.2 |
1,754.9 |
4,286.0 |
283.0 |
-31 |
392.7 |
UDH1920 |
4,894.2 |
1,588.1 |
4,632.5 |
97.8 |
-55.2 |
374.6 |
UDH1921 |
4,894.4 |
1,588.0 |
4,632.4 |
91.9 |
-59.2 |
395.7 |
UDH1922A |
4,894.2 |
1,588.1 |
4,632.5 |
97.6 |
-52.3 |
395.6 |
UDH1923 |
4,894.3 |
1,587.9 |
4,632.4 |
96.8 |
-61.7 |
386.8 |
UDH1923A |
4,894.3 |
1,587.9 |
4,632.4 |
98.8 |
-57.5 |
395.8 |
UDH1926 |
6,448.4 |
1,757.2 |
4,294.9 |
279.4 |
-65.7 |
251.8 |
UDH1946 |
6,583.2 |
1,401.5 |
4,187.5 |
111.8 |
-34.9 |
213.3 |
UDH1946B |
6,583.2 |
1,401.5 |
4,187.5 |
110.6 |
-31.7 |
130.6 |
UDH1951 |
6,319.9 |
1,757.3 |
4,275.2 |
289.3 |
-48.5 |
455.8 |
UDH1951A |
6,319.9 |
1,757.3 |
4,275.2 |
288.3 |
-42.6 |
455.8 |
UDH1952 |
6,383.1 |
1,755.1 |
4,285.5 |
259.9 |
-63.7 |
248.5 |
UDH1953 |
6,383.9 |
1,755.3 |
4,285.4 |
282.9 |
-74.1 |
272.8 |
UDH1966 |
6,727.9 |
1,504.0 |
4,172.9 |
143.2 |
-12.6 |
161.2 |
UDH1967 |
6,727.9 |
1,503.1 |
4,172.9 |
160.8 |
-14.3 |
195.4 |
UDH1969 |
6,585.1 |
1,402.6 |
4,188.6 |
76.3 |
-2.4 |
147 |
UDH1970 |
6,584.8 |
1,402.3 |
4,188.4 |
81.9 |
-6.2 |
197.6 |
UDH1971 |
6,584.3 |
1,402.1 |
4,188.4 |
85.1 |
-6.9 |
262.8 |
UDH1972 |
6,584.0 |
1,401.9 |
4,188.4 |
92.2 |
-10.4 |
230.8 |
UDH1973 |
6,583.7 |
1,401.7 |
4,188.1 |
100.3 |
-18.6 |
215.1 |
UDH1975 |
6,586.1 |
1,402.7 |
4,188.8 |
71.1 |
2 |
155.6 |
UDH1978 |
6,513.5 |
1,379.8 |
4,188.8 |
89.1 |
-27.3 |
221.8 |
UDH1979 |
6,513.2 |
1,380.0 |
4,189.1 |
93.5 |
-19.4 |
257.7 |
UDH1981 |
6,512.9 |
1,379.7 |
4,188.5 |
100.6 |
-29 |
245.8 |
UDH1982 |
6,513.0 |
1,379.6 |
4,188.5 |
98.1 |
-35.9 |
239.6 |
UDH1984 |
4,848.7 |
1,572.0 |
4,633.7 |
107.9 |
-57.2 |
425.7 |
UDH1985 |
4,847.8 |
1,571.3 |
4,633.5 |
114.6 |
-55.3 |
456.2 |
UDH1986 |
4,848.0 |
1,571.1 |
4,633.6 |
114.3 |
-61.6 |
440 |
UDH1987 |
4,848.1 |
1,571.2 |
4,633.6 |
107.2 |
-62.5 |
440.8 |
UDH1988 |
4,848.3 |
1,571.1 |
4,633.5 |
106.1 |
-67.6 |
425.8 |
Hole ID |
Northing
(m) |
Easting
(m) |
Elevation
(m) |
Collar
Azimuth (°) |
Collar
Plunge (°) |
Depth
(m) |
UDH1990 |
6,477.5 |
1,359.3 |
4,189.9 |
88.9 |
-21.2 |
282.2 |
UDH1991 |
6,477.4 |
1,359.3 |
4,189.4 |
92.3 |
-41.9 |
275.8 |
UDH1992 |
6,477.1 |
1,359.3 |
4,189.9 |
100.6 |
-22.3 |
312.2 |
UDH1993 |
6,477.2 |
1,359.3 |
4,189.8 |
97.7 |
-26.7 |
303.1 |
UDH1994 |
6,477.2 |
1,359.3 |
4,189.6 |
100.9 |
-35 |
276.2 |
UDH1995 |
6,477.3 |
1,359.3 |
4,189.2 |
97.7 |
-45.6 |
282 |
UDH1996 |
6,477.0 |
1,359.1 |
4,189.9 |
17.5 |
-26 |
315.1 |
UDH1997 |
4,897.5 |
1,588.1 |
4,632.4 |
62.8 |
-68.1 |
380.9 |
UDH1998A |
4,898.4 |
1,588.6 |
4,632.5 |
91.0 |
-68.2 |
413.1 |
UDH2000A |
4,897.8 |
1,588.4 |
4,632.4 |
94.8 |
-69.5 |
413.5 |
UDH2007 |
6,584.4 |
1,402.1 |
4,188.5 |
84.9 |
-4.8 |
359.5 |
UDH2019 |
6,512.6 |
1,379.4 |
4,189.4 |
105.2 |
-19.5 |
419.9 |
UDH2023 |
6,476.8 |
1,359.2 |
4,189.7 |
103.3 |
-30.9 |
315.1 |
UDH2034 |
6,524.8 |
1,832.9 |
4,305.0 |
278.6 |
-55.3 |
242.9 |
UDH2067 |
7,092.8 |
1,563.7 |
4,280.4 |
311.0 |
-14 |
71.7 |
UDH2071 |
6,455.4 |
1,826.4 |
4,300.0 |
249.1 |
-49.1 |
240 |
UDH2072 |
6,455.5 |
1,826.3 |
4,299.7 |
250.6 |
-56.4 |
242.9 |
Note: Collar locations are in Fosterville Mine Grid coordinate system. |