THUNDER BAY, Ontario, Aug. 01, 2017 (GLOBE NEWSWIRE) -- Mexican Gold Corp. ("Mexican Gold" or the "Company")
(TSX-V:MEX) (OTCMKTS:SRXLF) (FRA:4QW1) is pleased to announce an initial Mineral Resource Estimate for the El Dorado/Juan Bran and
Santa Cruz zones at its Las Minas project. The initial Mineral Resource Estimate is for two of the eight known zones of
mineralization at Las Minas and data generated from 19,636 metres of drilling and 4,247 assays. The two zones remain open for
expansion on strike and down dip.
Mineral Resource Estimate Highlights (see TABLE 1 below):
- Total Inferred Resource of 719,000 Au Eq ozs contained within 10,304,000 tonnes grading 2.17 g/t Au Eq.
- Total Measured and Indicated ("M&I") Resource of 304,000 Au Eq ozs contained within 4,970,000 tonnes grading 1.90 g/t Au
Eq.
- The El Dorado/Juan Bran zone outcrops on surface and occurs as a flat lying to sub-horizontal body zone measuring
approximately 650 metres N-S by 250 metres E-W. The zone varies in thickness from 6.0 to 28.0 metres.
- The Santa Cruz zone is comprised of a series of high-grade stacked lenses of skarn mineralization that strike NW and dip
approximately 50 degrees to the west. Overall dimensions of Santa Cruz mineralization are approximately 220m x 100m.
Brian Robertson, President and CEO, commented, “We are extremely encouraged by this substantial initial Mineral
Resource Estimate. The fact that the two zones remain open to expansion both laterally and at depth, when combined with the
additional six largely untested mineralized zones, clearly demonstrates the potential to expand resources at Las Minas. Additional
drilling is scheduled for commencement to expand the initial resource estimate for these two zones and test other high priority
targets. Results will be released as they become available. The Mineral Resource Estimate marks a very important milestone for the
development of the Las Minas property and a significant event for our shareholders.”
TABLE 1: El Dorado/Juan Bran & Santa Cruz Mineral Resource Estimate
Material |
Category |
Au Eq
g/t |
Au
g/t |
Cu
% |
Ag
g/t |
Tonnes |
Au Eq
oz |
Pit
Constrained |
Measured |
2.32 |
1.24 |
0.65 |
4.66 |
62,000 |
5,000 |
Pit
Constrained |
Indicated |
1.86 |
0.90 |
0.58 |
4.33 |
4,685,000 |
281,000 |
Pit
Constrained |
Total
M&I |
1.87 |
0.91 |
0.58 |
4.34 |
4,747,000 |
286,000 |
Pit
Constrained |
Inferred |
2.06 |
1.02 |
0.64 |
3.69 |
9,121,000 |
605,000 |
Underground |
Measured |
0.00 |
0.00 |
0.00 |
0.00 |
0 |
0 |
Underground |
Indicated |
2.46 |
1.24 |
0.74 |
5.05 |
223,000 |
18,000 |
Underground |
Total
M&I |
2.46 |
1.24 |
0.74 |
5.05 |
223,000 |
18,000 |
Underground |
Inferred |
2.99 |
1.57 |
0.86 |
6.25 |
1,183,000 |
114,000 |
PC +
UG |
Measured |
2.32 |
1.24 |
0.65 |
4.66 |
62,000 |
5,000 |
PC
+ UG |
Indicated |
1.89 |
0.92 |
0.58 |
4.36 |
4,908,000 |
299,000 |
PC +
UG |
Total
M&I |
1.90 |
0.92 |
0.59 |
4.37 |
4,970,000 |
304,000 |
PC +
UG |
Inferred |
2.17 |
1.08 |
0.66 |
3.99 |
10,304,000 |
719,000 |
Notes to Table:
- Mineral Resources have an effective date of July 31, 2017 and are reported on a 100% ownership basis.
- Mineral Resources are calculated at a gold price of US$1,250 per troy ounce, a copper price of US$2.85 per pound and a silver
price of US$16.75 per troy ounce. Gold equivalent grade is calculated as Au Eq (g/t) = Au (g/t) + Ag (g/t) * 0.013 + Cu (%)
* 1.564. The factors for silver (0.013) and copper (1.564) will change depending on the metal price. The metal price
numbers listed above were used to determine the conversion factors presented herein.
- The Mineral Resources presented above are global and do not include a detailed pit or underground design, only an economic
pit shell was used to determine the in-pit mineral resources. The underground Mineral Resources are that material outside of the
in-pit Mineral Resources above the stated underground cut-off grade.
- Mineral Resources which are not Mineral Reserves do not have demonstrated economic viability. The estimate of Mineral
Resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other
relevant issues.
- The Mineral Resources presented here were estimated using a block model with a block size of 10 m by 10 m by 10 m sub-blocked
to a minimum block size of 5 m by 5 m by 5m using ID3 methods for grade estimation. All Mineral Resources are reported
using an open pit gold cut-off of 0.46 g/t Au and an underground gold cut-off of 1.60 g/t Au.
- The Mineral Resources presented here were estimated using the Canadian Institute of Mining, Metallurgy and Petroleum (CIM),
CIM Standards on Mineral Resources and Reserves, Definitions and Guidelines prepared by the CIM Standing Committee on Reserve
Definitions and adopted by CIM Council.
- Figures are rounded and totals may not add correctly.
Mineral Resource Estimate Details
The initial Mineral Resource Estimate is based on 140 diamond drill holes totaling 19,636 metres drilled at the
El Dorado/Juan Bran zones and Santa Cruz zones. Drill hole collar locations and elevations were checked with a ground survey and
verified. The Mineral Resource was estimated using 2.0 metre composites of assay values with “zero grade” inserted into intervals
that were not sampled.
Assays were performed by SGS Mineral Services (ISO/IEC 17025) at Durango, Mexico, an accredited and independent
laboratory. The Company has implemented and adheres to a strict Quality Assurance/Quality Control program which includes inserting
mineralized standards and blanks into the sample stream, 1 for every 10 samples. The standards and blanks were obtained from CDN
Resource Laboratories Ltd. of Langley, BC, Canada. Each sample bag is properly sealed and kept in a secured, restricted storage
place prior to shipping to the lab. Samples are shipped directly by Mexican Gold or picked-up by the lab vehicle with chain of
custody/sample submittal signed and dated.
Metallurgical Test Work
Metallurgical test work was carried out by ALS Canada at its Kamloops metallurgical laboratory in British
Columbia. Excellent recoveries were achieved in the locked cycle test. At a regrind sizing of 60µm K80, PAX, and a pH of 9: 95
percent of the copper, 89 percent of the gold and 84 percent of the silver were recovered into a bulk concentrate grading about 22
percent copper, 13 g/t gold and 57 g/t silver.
Preparation of Mineral Resource Estimate and Qualified Persons
The Mineral Resource Estimate was prepared by Sam Shoemaker, Registered Member SME (QP), of the John T. Boyd Company. Mr.
Shoemaker is the independent qualified person (QP) for the mineral resource estimate. All estimates were prepared in accordance
with the guidelines of NI 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101").
Messrs. John Read, CPG, and Sam Shoemaker, Registered Member SME, are the independent qualified persons who have reviewed and
approved the technical information in this news release for the purposes of NI 43‑101.
A technical report in support of the Mineral Resource Estimate described herein and prepared in accordance with
National Instrument 43-101 will be filed on SEDAR within 45 days from the date hereof.
About Las Minas
The Las Minas Project hosts near-surface gold – silver and copper skarn mineralization and high–grade gold -
silver epithermal vein deposits. The project is comprised of six mineral concessions covering approximately 1,616 hectares (3,995
acres), with several small scale, past-producing mines and a number of untested targets.
The district is host to one of the largest under explored gold – silver copper skarn systems known in Mexico,
and has a production history that extends back to the Aztec era. The Las Minas granodiorite intrusive measures approximately 10
kilometres in diameter and underlies the Las Minas concessions. The mineralization controls and association with magnetite appear
to be similar to the Guerrero Gold belt, which is the site of the Los Filos and Morelos gold deposits.
About Mexican Gold Corp.
Mexican Gold Corp. is a Canadian based mineral exploration company committed to building long-term value through
ongoing discoveries and strategic acquisitions of prospective precious metals deposits in Mexico. Mexican Gold is exploring the Las
Minas Project, which is located in the core of the Las Minas district in the Veracruz State, Mexico. The district is host to one of
the largest under-explored skarn systems known in Mexico and has a strong production history that dates back to the Aztec era.
For more information, please contact:
Brian Robertson, President & CEO
Phone: 807-474-4270 or 807-251-1816
Fax: 807-474-4272
E-mail: info@mexicangold.ca
Website at www.mexicangold.ca
CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION: This news release includes certain
information that may constitute "forward-looking information" under applicable Canadian securities legislation. Forward-looking
information includes, but is not limited to, statements about the estimation of mineral resources, magnitude or quality of mineral
deposits, anticipated advancement of mineral properties or programs, future operations, results of exploration, prospects,
commodity and precious metals prices, future work programs, anticipated financial and operational results, capital expenditures and
objectives and the completion and timing of mineral resource estimates. Forward-looking information is necessarily based upon a
number of estimates and assumptions that, while considered reasonable, are subject to known and unknown risks, uncertainties, and
other factors which may cause the actual results and future events to differ materially from those expressed or implied by such
forward-looking information, including the degree to which mineral resource estimates are reflective of actual mineral resources
and the risks identified in the Company's disclosure documents available at www.sedar.com. There can be no assurance that such
information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such
information. Accordingly, readers should not place undue reliance on forward-looking information. All forward-looking information
contained in this press release is given as of the date hereof and is based on the opinions and estimates of management and
information available to management as at the date hereof. The Company disclaims any intention or obligation to update or revise
any forward-looking information, whether as a result of new information, future events or otherwise, except as required by law.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the
TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.