Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Bitterroot Resources Ltd.: Hackberry Silver Project Phase 2 Drilling

V.BTT

Bitterroot Resources Ltd.: Hackberry Silver Project – Phase 2 Drilling


West Vancouver, British Columbia (FSCwire) - Bitterroot Resources Ltd.’s (BTT, TSX-V) US subsidiary has received approval from the Bureau of Land Management to commence work on the Phase 2 drilling program on the Hackberry silver project in Mohave County, AZ. Construction of drill access roads has begun and drilling is planned to start in the next 10 days.

Three targets will be tested over the next two months by approximately 1,500 metres of core drilling in approximately six to nine holes. This work will test areas below the Silver King North, Silver King South and CMH targets which are located between 0.4 and 2.0 kilometres northwest of the Main Hackberry mine site, which was the focus of the Phase 1 drilling program completed in late 2017.

Underground workings were excavated over 100 years ago on high-grade silver-bearing veins at the Silver King North and Silver King South targets. The CMH target is a geophysical target which presents as a very strong magnetic low on the Hackberry mineralized trend, 400 metres northwest of the Main Hackberry mine. Descriptions of these targets are presented in the NI 43-101 compliant-report titled “Hackberry Silver Property” and in geophysical survey maps available on the Company’s website (www.bitterrootresources.com).

The final two holes of the Phase 1 drilling program returned only anomalous levels of silver mineralization. Details are presented in the table below. Drill hole HB-17-07 intersected significantly more silicification, plus intense chlorite and hematite alteration compared to adjacent holes. Drill hole HB-17-08 intersected the mineralized zone up-dip from the historic underground workings. The drill hole locations are shown on maps and cross sections presented on the Company’s website.

Phase 1

Hole No.

From

 (m)

To

(m)

Drill Intercept

(m)

Est. True Thickness

 (m)

Silver

(gpt)

Gold

(gpt)

Main Hackberry

         

HB-17-07

265.46

266.43

0.97

0.58

11

0.06

HB-17-08

77.86

78.93

1.07

1.07

79

0.28

The highlight of the Phase 1 drilling was hole HB-17-06, which intersected 4.87 metres grading 259 grams Ag/tonne (estimated true thickness 3.56 metres), including 1.65 metres grading 667 grams Ag/tonne (estimated true thickness 1.21 metres). This hole intersected the mineralized zone approximately 220 metres below surface. 

All assays were completed by ALS Vancouver. Sample preparation was done by ALS Tucson.

The Qualified Person, as defined in NI 43-101, responsible for the technical content of this news release is consulting geologist Glen W. Adams, PG, M.Sc.

ON BEHALF OF THE BOARD OF DIRECTORS

Michael S. Carr

Director

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

FORWARD LOOKING STATEMENTS: This document contains statements about expected or anticipated future events and/or financial results that are forward-looking in nature and as a result, are subject to certain risks and uncertainties, such as general economic, market and business conditions, regulatory processes and actions, technical issues, new legislation, competitive conditions, the uncertainties resulting from potential delays or changes in plans, the occurrence of unexpected events and the company’s ability to execute and implement its future plans. Actual results may differ materially from those projected by management. For such statements, we claim the safe harbour for forward-looking statements within the meaning of the Private Securities Legislation Reform Act of 1995.


To view the associated document to this release, please click on the following link:
public://news_release_pdf/Bitterroot02012018.pdf

Source: Bitterroot Resources Ltd. (TSX Venture:BTT, OTC Pink:BITTF, FWB:BQ51)

To follow Bitterroot Resources Ltd. on your favorite social media platform or financial websites, please click on the icons below.


Maximum News Dissemination by FSCwire. https://www.fscwire.com

 
 

Copyright © 2018 FSCwire





Get the latest news and updates from Stockhouse on social media

Follow STOCKHOUSE Today