VANCOUVER, British Columbia, May 16, 2018 (GLOBE NEWSWIRE) -- Foran Mining Corporation
(TSX.V:FOM) (“Foran” or the “Company”) is pleased to announce results of an additional four holes from its resource definition and
expansion drill program at its 100% owned McIlvenna Bay zinc-copper deposit (“McIlvenna Bay”) in Saskatchewan. McIlvenna Bay
is the largest undeveloped Volcanogenic Massive Sulphide (“VMS”) deposit along the 225 kilometre Flin Flon Greenstone Belt. This
world class metallogenic belt is host to 29 past and present producing mines, including Hudbay Minerals Inc.’s 777 and Lalor
operations.
Highlights:
These latest holes targeted the deeper parts of the McIlvenna Bay Deposit and returned significant intersections
of massive sulphide and thick intervals of stockwork style mineralization from the underlying Copper Stockwork Zone (“CSZ”),
including:
MB-18-203w1
Over 22 metres (“m”) of continuous mineralization, consisting of:
- 2.50% Cu, 1.71% Zn, 21.55 grams per tonne (“g/t”) Ag, 1.38 g/t Au over 5.11m, and
- 1.19% Cu, 0.70% Zn, 10.09 g/t Ag, 0.51 g/t Au over 16.95m
MB-18-203w2
Over 16m of continuous mineralization, consisting of:
-
3.65% Cu, 2.26% Zn, 26.68 g/t Ag, 1.68 g/t Au over 4.94 m
- including 4.30% Cu, 3.69% Zn, 33.49 g/t Ag, 2.41g/t Au over 2.74m, and
- 1.40% Cu, 0.77% Zn, 11.92 g/t Ag, 0.55 g/t Au over 11.10m.
MB-18-207
Over 22m of continuous mineralization, consisting of:
- 0.46% Cu, 4.23% Zn, 13.80g/t Ag, 0.18 g/t Au over 4.05m, and
-
1.81% Cu, 0.67% Zn, 16.62 g/t Ag, 0.94 g/t Au over 18.12m
- including 4.45% Cu, 1.53% Zn, 35.04 g/t Ag, 2.94 g/t Au over 1.85m.
Patrick Soares, President & CEO of Foran stated, “Undertaking the feasibility drilling program this winter has
provided us with the opportunity to test McIlvenna Bay at greater depths. A limited amount of drilling had been completed
historically and we are now confident that the mineralized zones are notably thicker in the lower sector. Higher than average
precious metals grades are also characteristic of the results received to date for this deeper section of the deposit. We will be
able to assess the impact of wider intervals of mineralization and elevated precious metal values once a new resource estimate is
calculated for McIlvenna Bay later this year.”
Technical Information
This release provides the results of four holes from the 2018 winter drill program at McIlvenna Bay, which
include several wedged holes completed during the program. The wedged holes were drilled to provide additional pierce points into
the mineralized zones for resource work and/or provide multiple cuts through the mineralized horizons to allow additional sample
material to be collected for metallurgical testing. During the 2018 winter program, Foran completed approximately 15,000 metres of
drilling in 32 holes. Drilling operations were suspended on April 21, 2018 for spring breakup. It is currently anticipated that
drilling will recommence for the Phase 2 summer program in July.
The McIlvenna Bay deposit consists of several distinct zones of VMS mineralization, including massive to
semi-massive sulphide in the Main Lens and Lens 3, and the underlying stockwork-style sulphide mineralization in the Copper
Stockwork Zone. The Main Lens at McIlvenna Bay is comprised of the zinc-rich Zone 2 and the copper-zinc bearing Upper West
Zone.
These latest holes targeted the deeper down-plunge parts of the deposit at depths of between 750 and 900m below
surface. Detailed results from these holes are provided in Table 1 below:
Table 1: Significant drill intercepts from the winter drill program1:
Hole |
Zone |
From
(m) |
To
(m) |
Interval
(m) |
Au
(g/t) |
Ag
(g/t) |
Cu
(%) |
Zn
(%) |
MB-18-203** |
Lens 3 |
736.55 |
737.04 |
0.49 |
0.08 |
15.80 |
0.49 |
8.04 |
|
Lens 3 |
737.90 |
740.76 |
2.86 |
0.22 |
9.24 |
0.73 |
0.09 |
|
|
747.66 |
756.00 |
8.34 |
0.21 |
9.90 |
1.38 |
0.22 |
|
UWZ |
756.00 |
761.42 |
5.42 |
1.64 |
30.13 |
2.25 |
2.29 |
|
Including |
756.42 |
758.07 |
1.65 |
2.10 |
29.58 |
4.50 |
0.55 |
|
and |
759.77 |
761.42 |
1.65 |
2.59 |
38.66 |
1.63 |
3.30 |
|
CSZ |
761.42 |
775.64 |
14.22 |
1.25 |
12.68 |
2.01 |
0.50 |
|
Including |
765.53 |
770.24 |
4.71 |
2.35 |
19.38 |
2.97 |
1.09 |
|
CSZ |
780.00 |
785.41 |
5.41 |
0.17 |
5.30 |
1.14 |
0.09 |
MB-18-203w1 |
Lens 3 |
778.28 |
779.90 |
1.62 |
0.09 |
9.53 |
0.31 |
1.94 |
|
|
780.89 |
783.83 |
2.94 |
0.14 |
8.02 |
0.64 |
0.52 |
|
UWZ |
784.44 |
789.55 |
5.11 |
1.38 |
21.55 |
2.50 |
1.71 |
|
Including |
784.44 |
786.98 |
2.54 |
1.93 |
24.12 |
2.86 |
1.60 |
|
CSZ |
789.55 |
806.50 |
16.95 |
0.51 |
10.09 |
1.19 |
0.70 |
|
Including |
789.55 |
794.35 |
4.80 |
0.65 |
11.49 |
1.51 |
0.40 |
|
And |
803.23 |
806.50 |
3.27 |
0.36 |
10.30 |
0.81 |
1.14 |
MB-18-203w2 |
Lens 3 |
781.16 |
782.36 |
1.20 |
0.17 |
15.47 |
0.75 |
4.12 |
|
|
783.67 |
785.96 |
2.29 |
0.33 |
12.06 |
1.11 |
0.89 |
|
UWZ |
785.96 |
790.90 |
4.94 |
1.68 |
26.68 |
3.65 |
2.26 |
|
Including |
785.96 |
788.70 |
2.74 |
2.41 |
33.49 |
4.30 |
3.69 |
|
CSZ |
790.90 |
802.00 |
11.10 |
0.55 |
11.92 |
1.40 |
0.77 |
|
Including |
790.90 |
794.00 |
3.10 |
0.94 |
15.21 |
1.98 |
0.40 |
|
|
805.56 |
807.02 |
1.46 |
0.08 |
3.32 |
0.26 |
2.37 |
MB-18-207 |
UWZ |
893.83 |
897.88 |
4.05 |
0.18 |
13.80 |
0.46 |
4.23 |
|
CSZ |
897.88 |
916.00 |
18.12 |
0.94 |
16.62 |
1.81 |
0.67 |
|
Including |
900.60 |
902.45 |
1.85 |
2.94 |
35.04 |
4.45 |
1.53 |
|
And |
906.33 |
912.00 |
5.67 |
1.34 |
16.99 |
2.19 |
1.08 |
MB-18-207w1 |
UWZ |
887.79 |
892.91 |
5.12 |
0.24 |
15.68 |
0.51 |
4.08 |
|
Including |
889.43 |
890.90 |
1.47 |
0.17 |
10.48 |
0.12 |
7.78 |
|
CSZ |
894.91 |
911.31 |
16.40 |
0.81 |
13.31 |
1.65 |
0.50 |
|
Including |
896.06 |
899.70 |
3.64 |
1.63 |
20.81 |
2.99 |
0.36 |
|
|
|
|
|
|
|
|
|
1 True thickness is estimated to be approximately 80-85% of drill indicated.
**Indicates previously released drill hole. See news release April 25, 2018 for more details
Holes MB-18-203w1 and 203w2 were two additional wedge cuts completed from the previous released pilot hole
MB-18-203. The wedge holes were completed to provide additional intersections in this sparsely drilled portion of the UWZ for
resource estimation and collect additional material for metallurgical sampling. The intersections of the massive sulphide lens in
these wedged holes are about 6m apart and are located approximately 30m below and to the west of the previously released MB-18-203.
For completeness, the results from the parent hole MB-18-203 are included in Table 1. Both wedged holes returned comparable results
to MB-18-203 as highlighted by MB-18-203w1 which assayed 2.50% Cu, 1.71% Zn, 21.55 g/t Ag, and 1.38 g/t Au over 5.11m, including
2.86% Cu, 1.60% Zn, 24.12 g/t Ag, and 1.93 g/t Au over 2.54m from the UWZ massive sulphide and a 16.95m intersection from the
underlying CSZ which graded 1.19% Cu, 0.70% Zn, 10.09 g/t Ag and 0.51 g/t Au. These holes provide additional evidence for the
occurrence of a zone of elevated gold mineralization in the UWZ in this sector of the deposit.
Holes MB-18-207 and 207w1 intersect the McIlvenna Bay deposit approximately 900m below surface near the
down-plunge end of the currently defined deposit. The wedged hole MB-18-207w1 intersected the deposit approximately 10m above
MB-18-207 and was drilled to provide additional material for metallurgical test work. Both holes returned very similar grades and
thickness from both the massive sulphide and underlying CSZ as highlighted by MB-18-207 which intersected 0.46% Cu, 4.23% Zn, 13.80
g/t Ag, and 0.18 g/t Au over 4.05m from the Zone 2 massive sulphide. The underlying CSZ in this hole consisted of 18.12m grading
1.81% Cu, 0.67% Zn, 16.62 g/t Ag and 0.94 g/t Au, which included 1.85m grading 4.54% Cu, 1.53% Zn, 35.04 g/t Ag and 2.94 g/t Au and
another 5.67m interval grading 2.19% Cu, 1.08% Zn16.99 g/t Ag and 1.34 g/t Au.
Assays are pending from the final holes from the phase 1 winter program. These are expected to be ready for
release in the coming weeks. The phase 2 summer drill program is scheduled to commence after spring break-up and is intended to
target areas of the deposit that can be drill-tested under summer conditions. Current plans call for at least 11 holes encompassing
7,000m to be completed during the summer program. Additional holes may be added to the planned program if deemed to have potential
to expand and/or upgrade the known McIlvenna Bay resource.
Figure 1. McIlvenna Bay Drill Plan is available at http://resource.globenewswire.com/Resource/Download/2f3d3bf2-ffaa-4eb3-9fb6-29a9bb1183c3
Figure 2. McIlvenna Bay Long Section is available at http://resource.globenewswire.com/Resource/Download/ba363639-049b-4a50-95f2-4231721a8071
Quality Assurance and Quality Control
Drilling was completed using NQ size diamond drill core and core was logged by employees of the Company. During
the logging process, mineralized intersections were marked for sampling and given unique sample numbers. Sampled intervals were
sawn in half using a diamond blade saw. One half of the sawn core was placed in a plastic bag with the sample tag and sealed, while
the second half was returned to the core box for storage on site. Sample assays are performed by TSL Laboratories Ltd. (“TSL”) in
Saskatoon, Saskatchewan. TSL is a CAN-P-1579, CAN-P-4E (ISO/IEC 17025:2005) accredited laboratory and independent of Foran.
Analysis for Ag, Cu, Pb and Zn is performed using atomic absorption spectrometry (“AA”) after multi-acid digestion. Au analysis is
completed by fire assay with AA finish. Any samples which return results greater than 1.0 g/t Au are re-run using gravimetric
finish. A complete suite of QA/QC reference materials (standards, blanks and pulp duplicates) are included in each batch of samples
processed by the laboratory. The results of the assaying of the QA/QC material included in each batch are tracked to ensure the
integrity of the assay data.
About Foran Mining
Foran is a zinc-copper exploration and development company with projects located along the Flin Flon Greenstone
Belt. The McIlvenna Bay Project, Foran’s flagship asset located within the Hanson Lake District, is part of this world class VMS
belt that extends from Snow Lake, Manitoba, through Flin Flon to Foran’s ground in eastern Saskatchewan, a distance of over 225
kilometres. McIlvenna Bay is one of the largest undeveloped VMS deposits in Canada. The Company is currently conducting a resource
definition and infill drilling program in preparation for producing a feasibility study on the McIlvenna Bay deposit.
On December 4, 2017, Foran announced the execution of a Technical Services Agreement with Glencore Canada
Corporation (“Glencore”). Glencore has agreed to provide technical expertise and advice in order to advance the McIlvenna Bay
deposit to feasibility in exchange for an off-take agreement on the metals and minerals produced from the deposit.
On November 12, 2014, Foran announced a positive preliminary economic assessment (“PEA”) for McIlvenna Bay, with
an estimated pre-tax NPV7% of $382M ($263M after-tax) & 22% IRR (19% after-tax) at a Zinc price of US$1.06/lb. Spot Zinc price
today is US$1.40/lb. See below and Foran’s news releases from November 12 and December 22, 2014 for important disclosures
with respect to the McIlvenna Bay PEA.
The PEA is considered preliminary in nature and includes mineral resources, including inferred mineral resources
that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be
categorized as mineral reserves. Mineral resources that are not mineral reserves have not yet demonstrated economic viability. Due
to the uncertainty that may be attached to mineral resources, it cannot be assumed that all or any part of a mineral resource will
be upgraded to mineral reserves. Therefore, there is no certainty that the results concluded in the PEA will be realized.
Roger March, P.Geo., VP Exploration for Foran and a Qualified Person within the meaning of National Instrument
43-101, has reviewed and approved the technical information in this release.
Foran trades on the TSX.V under the symbol “FOM”.
For additional information, please contact Foran Mining Corporation:
Patrick Soares
President & CEO
904 – 409 Granville Street
Vancouver, BC, Canada, V6C 1T2
Phone: +1 604-488-0008
Email: ir@foranmining.com
Neither the TSX-V nor its Regulation Services Provider (as that term is defined in the policies of the TSX-V)
accepts responsibility for the adequacy of this release. No stock exchange, securities commission or other regulatory authority has
approved or disapproved the information contained herein.
Forward Looking Statements
This news release contains forward-looking information which is not comprised of historical facts. Forward-looking
information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and
opportunities to differ materially from those expressed or implied by such forward-looking information. Forward looking information
in this news release includes, but is not limited to, Foran’s objectives, goals or future plans, statements regarding the Technical
Services Agreement and, if a feasibility study will suggest an economically viable project, estimation of mineral resources,
exploration results, and potential mineralization,. Factors that could cause actual results to differ materially from such
forward-looking information include, but are not limited to, work performed under the Technical Services Agreement related to
preparation of a feasibility study, the failure of such study to suggest an economically viable project, failure to convert
estimated mineral resources to reserves, capital and operating costs varying significantly from estimates, the preliminary nature
of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project
approvals, political risks, uncertainties relating to the availability and costs of financing needed in the future, changes in
equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects and
the other risks involved in the mineral exploration and development industry, and those risks set out in Foran’s public documents
filed on SEDAR. Although Foran believes that the assumptions and factors used in preparing the forward-looking information in this
news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this
news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. Foran disclaims any
intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events
or otherwise, other than as required by law.